0% found this document useful (0 votes)
1 views

Mega Project Report

This document is a project report for a Master of Computer Application (MCA) program, detailing the structure and content required for submission. It includes sections such as introduction, existing system analysis, proposed system objectives, design diagrams, implementation details, and conclusion. The report is to be submitted to Shivaji University, Kolhapur, and includes acknowledgments, declarations, and references.

Uploaded by

Guru Mali
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1 views

Mega Project Report

This document is a project report for a Master of Computer Application (MCA) program, detailing the structure and content required for submission. It includes sections such as introduction, existing system analysis, proposed system objectives, design diagrams, implementation details, and conclusion. The report is to be submitted to Shivaji University, Kolhapur, and includes acknowledgments, declarations, and references.

Uploaded by

Guru Mali
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 48

A

Project Report
on
Name of Project

With special reference to


Name of Organization

Submitted by
Name of Student

Under the guidance of


Guide Name
Faculty of
MCA

In partial fulfillment for the award of the

degree of

MASTER OF COMPUTER APPLICATION

(MCA-II) Semester-III

(2022-2023)

Under Commerce

Faculty AT

YSPM’s
Yashoda Technical Campus, Satara (YTC)
Yashoda Shikshan Prasarak Mandal’s
YASHODA TECHNICAL CAMPUS, SATARA
NH-4, Wadhe Phata, Satara. Tele Fax- 02162-271238/39/40
Website- www.yes.edu.in, website- yes.edu.in Email: - [email protected]
Approved by AICTE- New Delhi, Govt. of Maharashtra (DTE, Mumbai)
Affiliated to Shivaji University, Kolhapur / MSBTE, Mumbai.
NAAC Accredited Institute

Seat.No:- Date:-
Certificate

This is to certify that the project report entitled “______________” with special

reference to “____________________” submitted by “____________” MCA II

Exam Seat No:”____________” in partial fulfillment of the award of Master of

Computer Application (M.C.A.) course submitted to Shivaji University,

Kolhapur for the year 2022-2023 and this is a genuine and bonafide work

prepared under my supervision and guidance.

To the best of knowledge and belief the matter presented in this project

report has not been submitted earlier to any university for similar purpose.

Place: Satara
Date:

Guide Examiner H.O.D


DECLARATION

To,

The HOD,
Faculty of MCA.

Respected Madam,

I undersigned hereby declare that the project entitled

“__________________” with reference to “_____________” developed under the

guidance of Prof.___________ is my original work. The information generated in this

project work is based on the data collected by me.

I have not copied from any other project report submitted to Shivaji

University, Kolhapur earlier.

Place: Satara.

Date:

Miss/Mr. Student Name


ACKNOWLEDGEMENT

I express my sincere gratitude to my guide Dr./Prof._________ for her/His


valuable guidance and help during the project .Without her/his advice and co-operation I
would not have succeeded in my endeavor. Her/his thoughtfulness and understanding was
vast and thoroughly helpful in successful completion of the project.

I am thankful to the Principal of MCA Department for making available all the
required resources and very valued constructive criticism that has driven to complete the
project successfully.

I am especially thankful to those who helped me directly-indirectly in completion


of this work successfully.

Place: Satara

Date:

Miss/Mr. Student Name


Internship Joining report
INDEX

Sr. No Content Page No.


Introduction to Project
Introduction
1 Existing System
Need and scope of Computer System
Organization Profile
Proposed System
2 Objectives
Requirement Engineering
Analysis & Design:
System Diagram
3 • DFD
• ERD
• UML

System Design:
Database Design
4
Input Design & its samples
Output Design (on screen)
Implementation
System Requirement - Hardware - Software
5
Installation process
User Guideline
6 Reports
Conclusion and Suggestions
Conclusion
7
Limitations
Suggestion
8 Annexures
9 References
Project Name

1. INTRODUCTION TO PROJECT

Introduction
Project Title:

Start Your Project Introduction from

Project Guide: Dr./Prof._______________

Team Member: _______________

YSPM’S YTC, Faculty of MCA, 1


Satara.
Project Name

Existing System

Write information about Existing System

YSPM’S YTC, Faculty of MCA, 2


Satara.
Project Name

Need and Scope of Computer System

Problems in Existing system:

Scope of Work:

YSPM’S YTC, Faculty of MCA, 3


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 4


Satara.
Project Name

Organization Profile

Location of Company:

Office Address:

Phone:

Website:

YSPM’S YTC, Faculty of MCA, 5


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 6


Satara.
Project Name

2. PROPOSED SYSTEM

Objectives

YSPM’S YTC, Faculty of MCA, 7


Satara.
Project Name

Requirement Engineering

Requirement Gathering:

Software Requirements:

YSPM’S YTC, Faculty of MCA, 8


Satara.
Project Name

3. ANALYSIS AND DESIGN

System Diagram

Context Level Data Flow Diagram

Draw 0th Level, 1st level, 2nd level

YSPM’S YTC, Faculty of MCA, 9


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 10


Satara.
Project Name

Entity Relationship Diagram

Fig. 2: Entity Relationship Diagram

YSPM’S YTC, Faculty of MCA, 11


Satara.
Project Name

UML Diagrams

1. Use Case Diagram:

a. Admin

Fig. 3: Use Case Diagram (Admin)

YSPM’S YTC, Faculty of MCA, 12


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 13


Satara.
Project Name

b. User :

Fig. 4: Use Case Diagram (User)

YSPM’S YTC, Faculty of MCA, 14


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 15


Satara.
Project Name

2. Activity Diagram:

a. Admin :

Fig. 5: Activity Diagram (Admin)

YSPM’S YTC, Faculty of MCA, 16


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 17


Satara.
Project Name

b. User:

Fig. 6: Activity Diagram (User)

YSPM’S YTC, Faculty of MCA, 18


Satara.
Project Name

3. Sequence Diagram:

YSPM’S YTC, Faculty of MCA, 19


Satara.
Project Name

Fig. 7: Sequence Diagram

YSPM’S YTC, Faculty of MCA, 20


Satara.
Project Name

4. Component Diagram:

Fig. 8: Component Diagram

YSPM’S YTC, Faculty of MCA, 21


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 22


Satara.
Project Name

5. Deployment Diagram:

Fig. 9: Deployment Diagram

YSPM’S YTC, Faculty of MCA, 23


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 24


Satara.
Project Name

4. SYSTEM DESIGN
Database Design
Table Name: -
Data Field Data Type Size Key Constraints

YSPM’S YTC, Faculty of MCA, 25


Satara.
Project Name

Input Design and its

samples User:

Home:

YSPM’S YTC, Faculty of MCA, 26


Satara.
Project Name

5. IMPLEMENTATION

System Requirements
Hardware Requirements-

 Microprocessor:
 RAM:
 Hard Disk:
 UPS:

Software Requirements-

 Front End:
 Back End:
 Reporting Tool:
 Web Server:
 Operating System:

YSPM’S YTC, Faculty of MCA, 27


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 28


Satara.
Project Name

Detail Description of Technology Used

[Front End]

YSPM’S YTC, Faculty of MCA, 29


Satara.
Project Name

Characteristics

Front End

YSPM’S YTC, Faculty of MCA, 30


Satara.
Project Name

Common uses of Front End

YSPM’S YTC, Faculty of MCA, 31


Satara.
Project Name

YSPM’S YTC, Faculty of MCA, 32


Satara.
Project Name

MySQL Server [Back End]

MySQL Database

YSPM’S YTC, Faculty of MCA, 33


Satara.
Project Name

MySQL: Features

YSPM’S YTC, Faculty of MCA, 34


Satara.
Project Name

Installation Process

Steps to install XAMPP on Windows:

YSPM’S YTC, Faculty of MCA, 35


Satara.
Project Name

User Guideline:

Admin:

Functions related to Admin Module:

YSPM’S YTC, Faculty of MCA, 36


Satara.
Project Name

Functions related to User Module:

YSPM’S YTC, Faculty of MCA, 37


Satara.
Project Name

6. REPORTS

YSPM’S YTC, Faculty of MCA, 38


Satara.
Project Name

7. CONCLUSION AND SUGGESTIONS

Conclusion

YSPM’S YTC, Faculty of MCA, 39


Satara.
Project Name

Limitations

Suggestions

YSPM’S YTC, Faculty of MCA, 40


Satara.
Project Name

8. ANNEXURE

Source code

YSPM’S YTC, Faculty of MCA, 41


Satara.
Project Name

9. REFERENCES

YSPM’S YTC, Faculty of MCA, 42


Satara.

You might also like