0% found this document useful (0 votes)
7 views

take off

The document outlines the financial details and progress of a construction project, including various payment certificates and summaries of work executed. It specifies the total contract amount, payments made, and the value of work completed to date. Additionally, it includes detailed breakdowns of costs associated with different project components and the contractor's entitlements.

Uploaded by

desta melkamu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

take off

The document outlines the financial details and progress of a construction project, including various payment certificates and summaries of work executed. It specifies the total contract amount, payments made, and the value of work completed to date. Additionally, it includes detailed breakdowns of costs associated with different project components and the contractor's entitlements.

Uploaded by

desta melkamu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 144

የውል ቁጥር - ውል የተፈረመበት ቀን

CONTRACT NO. Date of signature of cont.

የክፍያ ምስክር ወረቀት -04


CERTEFICATE OF PAYMENT NO -04
ለስፍር ምስክር ወረቀት
FOR MEASUREMENT CERTIFICATE No -04

ስራው የገንዘቡ ልክ/ብር /


Project: Amount Birr
ቦታው ዋናው ውል
Location: Main contract 30,411,788.52
አሰሪው መስሪያ ቤት ተቀጽላ ውል
Invertor: - Supplementery cont.
ስራ ተቋራጭ የለውጥ ስራ ትእዛዝ
Contractor :- Variation order
አማካሪ መሀንዲስ ቫት
Name of supervisor:- Vat 15% 4,561,768.28
ጠቅላላ ድምር
Total sum 34,973,556.80

አባሪ በሆነው የክፍያ ሰነድ ጥያቄ መሰረት እስከ ዛሬ ድረስ ተëX½ ¡\X‘ SX|/¤dUi‘ –f
As per attached Statement the value of work executed and/or material supplied
to date is Birr #VALUE! .

Amount Birr የገንዘቡ ልክ /ብር /


No Befor Vat After Vat Amount (birr)
የገንዘቡ ልክ / ብር
1st Adv. 6,028,357.70 6,994,711.36
2nd Adv. 1st pay. 3,041,178.85 3,497,355.68 #VALUE!
Total Advance 9,123,536.56 10,492,067.04 ተቀናሽ የገንዘቡ ልክ /ብር /
1st payment 1,717,835.45 1,995,331.95 Deduction Amount (birr)
የገንዘቡ ልክ / ብር
2nd payment 2,797,653.05 3,249,581.62 1.አስቀድሞ የተከፈለ
Previous payments 5,555,502.62
3rd payment 1,040,014.12 1,208,016.40 2.ቅናሽ
Rebate
3.መያዣ
Retention 5% #VALUE!
4.መቀጫ
Penalty
5. የቅድምያ ክፍያ
Advance Repayment(30%) #VALUE!
6.ሌላ
Others/Material Advance/
ÉU`
Total #VALUE! #VALUE!
Net sum #VALUE!
15% vat #VALUE!
15% Vat for retention 23,384.84
ድምር 5,555,502.62 6,452,929.97 Total Vat #VALUE!
Net sum including 15% vat #VALUE!

KY^ }s^Û w` 2354074.22 K=ŸðM S‰K<” “[ÒÓ×K”:: We certify that the contractor is now entitled to
the sum of Birr #VALUE! /One Million One hundred Tweenty Fife Thousand Three Hundred Sixty
Eight & 13/100 only.

checked by verified by certified by


______________ ______________ _____________
Date_________ Date_________ Date________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
GRAND SUMMARY
1 Block 1. General ward (IPD) 4,227,443.96 2,078,286.84
2 Block 2. OPD 2,740,396.77 1,384,560.78
3 Block 3. Staff Residence +SQ 1,647,003.05 777,357.33
4 Block 4. OR & Delivery 4,613,771.77 1,879,704.73
5 Block 5. Emergence & Waiting 2,838,435.43 #VALUE!
6 Block 6. Adminstration 2,263,540.52 985,186.22
7 Block 7. Diagnostic Service 1,815,092.66 962,095.12
8 Block 8. Gen. & Tranf. House 918,242.99 111,362.11
9 Block 9. Kitchen 2,258,088.85 1,114,206.79
10 Block 10. Guard House 219,616.36 121,182.53
11 Block 11. Morgue 560,728.59 92,157.92
12 Site Work
13 Material on site

Grand Total 24,102,360.95 #VALUE!

I/We ……………….. here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr #VALUE!
Contractor________________ Superviser_________________

SUMMARY OF STATEMENT No 04
PROJECT - PRIMARY HOSPITAL
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 1 IPD BLOCK
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 83,855.79 120,750.01
2 CONCRETE WORK 755,714.00 712,240.05
3 MASONARY WORK 140,969.47 177,964.80
sub total A 980,539.26 1,010,954.86
B. SUPER STRUCTURE
1 CONCRETE WORK 359,146.00 325,737.92
2 Block Work 416,350.00 353,053.57
3 Roofing 293,739.00 274,426.25
4 Carpentry & Joinery 209,608.70 114,114.24
5 Metal Work 251,557.00
6 Finishing 1,024,590.00
7 Painting 63,495.00
8 Glazing 17,784.00
9 Sanitary Installation 329,235.00
10 Electrical Installation 281,400.00
sub total B 3,246,904.70 1,067,331.99
Total A+B 4,227,443.96 2,078,286.84

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 2,078,286.84
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 2 OPD BLOCK
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 54,688.45 65,042.36
2 CONCRETE WORK 457,744.00 486,181.16
3 MASONARY WORK 101,110.87 119,894.40
sub total A 613,543.32 671,117.92
B. SUPER STRUCTURE
1 CONCRETE WORK 233,367.00 216,013.76
2 Block Work 236,620.00 240,740.85
3 Roofing 234,881.25 183,079.05
4 Carpentry & Joinery 185,131.20 73,609.20
5 Metal Work 132,879.00
6 Finishing 798,785.00
7 Painting 46,580.00
8 Glazing 11,520.00
9 Sanitary Installation 78,200.00
10 Electrical Installation 168,890.00
sub total B 2,126,853.45 713,442.86
Total A+B 2,740,396.77 1,384,560.78

I/We …... here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 1,384,560.78

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 3 STAFF RESIDENCE & SQ
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 60,757.87 32,741.53
2 CONCRETE WORK 242,646.00 307,866.40
3 MASONARY WORK 120,798.18 66,666.60
sub total A 424,202.05 407,274.53
B. SUPER STRUCTURE
1 CONCRETE WORK 140,419.00 118,249.84
2 Block Work 221,010.00 141,089.88
3 Roofing 109,000.00 81,536.00
4 Carpentry & Joinery 77,682.00 29,207.08
5 Metal Work 113,500.00
6 Finishing 307,210.00
7 Painting 35,395.00
8 Glazing 12,480.00
9 Sanitary Installation 89,665.00
10 Electrical Installation 116,440.00
sub total B 1,222,801.00 370,082.80
Total A+B 1,647,003.05 777,357.33

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 777,357.33

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 4 OR & Delivery BLOCK
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 99,944.82 100,194.79
2 CONCRETE WORK 663,502.00 578,865.84
3 MASONARY WORK 151,460.95 171,175.62
sub total A 914,907.77 850,236.25
B. SUPER STRUCTURE
1 CONCRETE WORK 367,930.00 323,210.44
2 Block Work 393,900.00 336,442.00
3 Roofing 411,141.50 270,886.00
4 Carpentry & Joinery 240,246.50 98,930.04
5 Metal Work 153,833.00
6 Finishing 1,299,124.00
7 Painting 95,590.00
8 Glazing 19,104.00
9 Sanitary Installation 229,660.00
10 Electrical Installation 488,335.00
sub total B 3,698,864.00 1,029,468.48
Total A+B 4,613,771.77 1,879,704.73

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 1,879,704.73

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 5 EMERGENCY & WAITING
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 53,991.63 50,011.91
2 CONCRETE WORK 484,955.00 433,341.19
3 MASONARY WORK 113,869.80 131,762.40
sub total A 652,816.43 615,115.49
B. SUPER STRUCTURE
1 CONCRETE WORK 348,244.00 221,857.96
2 Block Work 269,470.00 #VALUE!
3 Roofing 273,773.00 149,576.00
4 Carpentry & Joinery 146,495.00 53,789.88
5 Metal Work 147,492.00
6 Finishing 647,865.00
7 Painting 47,425.00
8 Glazing 16,360.00
9 Sanitary Installation 112,080.00
10 Electrical Installation 176,415.00
sub total B 2,185,619.00 #VALUE!
Total A+B 2,838,435.43 #VALUE!

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr #VALUE!

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 6 ADMINSTRATION
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 41,629.01 50,549.46
2 CONCRETE WORK 312,973.00 355,077.88
3 MASONARY WORK 79,939.11 65,978.40
sub total A 434,541.12 471,605.74
B. SUPER STRUCTURE
1 CONCRETE WORK 153,484.00 154,593.45
2 Block Work 163,750.00 191,274.44
3 Roofing 151,021.00 119,777.00
4 Carpentry & Joinery 66,730.40 47,935.60
5 Metal Work 206,744.00
6 Finishing 855,365.00
7 Painting 41,350.00
8 Glazing 15,080.00
9 Sanitary Installation 45,925.00
10 Electrical Installation 129,550.00
sub total B 1,828,999.40 513,580.48
Total A+B 2,263,540.52 985,186.22

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 985,186.22

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 7 DIAGNOSTIC SERVICE
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 33,891.65 55,635.61
2 CONCRETE WORK 285,094.00 350,334.56
3 MASONARY WORK 76,683.21 73,278.00
sub total A 395,668.86 479,248.18
B. SUPER STRUCTURE
1 CONCRETE WORK 135,936.00 139,003.81
2 Block Work 155,080.00 190,930.27
3 Roofing 143,873.50 109,788.88
4 Carpentry & Joinery 153,934.30 43,123.98
5 Metal Work 79,195.00
6 Finishing 442,365.00
7 Painting 28,655.00
8 Glazing 12,840.00
9 Sanitary Installation 97,920.00
10 Electrical Installation 169,625.00
sub total B 1,419,423.80 482,846.94
Total A+B 1,815,092.66 962,095.12

I/We ere by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 962,095.12

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 8 GENERATOR HOUSE
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 46,524.69 3,320.46
2 CONCRETE WORK 123,675.50 43,619.57
3 MASONARY WORK 51,940.00 9,420.00
sub total A 222,140.19 56,360.02
B. SUPER STRUCTURE
1 CONCRETE WORK 147,014.50 20,584.67
2 Block Work 110,250.00 17,783.32
3 Roofing 130,600.00 11,175.50
4 Carpentry & Joinery 20,600.00 5,458.60
5 Metal Work 24,576.00
6 Finishing 207,700.00
7 Painting 19,132.30
8 Glazing -
9 Sanitary Installation -
10 Electrical Installation 36,230.00
sub total B 696,102.80 55,002.09
Total A+B 918,242.99 111,362.11

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 111,362.11

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 9 KITCHEN
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 44,334.66 50,137.73
2 CONCRETE WORK 357,295.00 372,559.78
3 MASONARY WORK 91,908.69 80,181.00
sub total A 493,538.35 502,878.50
B. SUPER STRUCTURE
1 CONCRETE WORK 189,325.00 190,806.78
2 Block Work 202,760.00 212,445.51
3 Roofing 181,599.50 148,354.50
4 Carpentry & Joinery 170,132.00 59,721.50
5 Metal Work 120,571.00
6 Finishing 548,480.00
7 Painting 37,290.00
8 Glazing 15,800.00
9 Sanitary Installation 73,683.00
10 Electrical Installation 224,910.00
sub total B 1,764,550.50 611,328.29
Total A+B 2,258,088.85 1,114,206.79

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 1,114,206.79

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 10 GUARD HOUSE
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 4,189.36 2,305.38
2 CONCRETE WORK 27,696.00 42,991.96
3 MASONARY WORK 14,450.00 9,060.00
sub total A 46,335.36 54,357.34
B. SUPER STRUCTURE
1 CONCRETE WORK 16,806.00 18,913.09
2 Block Work 31,760.00 31,271.40
3 Roofing 22,460.00 11,175.50
4 Carpentry & Joinery 4,894.00 5,465.20
5 Metal Work 18,321.00
6 Finishing 48,350.00
7 Painting 3,070.00
8 Glazing 5,600.00
9 Sanitary Installation -
10 Electrical Installation 22,020.00
sub total B 173,281.00 66,825.19
Total A+B 219,616.36 121,182.53

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 121,182.53

Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04

Details of works executed and/ of materials supplied

SUB TOTAL BIRR TOTAL BIRR


ITEM DESCRIPTION CONTRACT EXECUTED CONTRACT EXECUTED
BILL 11 MOURGE
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK 7,523.68 2,305.38
2 CONCRETE WORK 122,480.00 37,381.43
3 MASONARY WORK 28,319.91 6,660.00
sub total A 158,323.59 46,346.81
B. SUPER STRUCTURE
1 CONCRETE WORK 39,492.00 18,580.51
2 Block Work 54,000.00 15,602.40
3 Roofing 28,460.00 8,463.00
4 Carpentry & Joinery 8,840.00 3,165.20
5 Metal Work 16,503.00
6 Finishing 161,435.00
7 Painting 9,215.00
8 Glazing 4,320.00
9 Sanitary Installation 40,140.00
10 Electrical Installation 40,000.00
sub total B 402,405.00 45,811.11
Total A+B 560,728.59 92,157.92

I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 92,157.92

Contractor________________ Superviser_________________
IPD BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 826 832.28 10 8,322.75
1.2 Trench m3 91.97 74.74 45 3,363.12
1.3 -
1.4 Selected borrowed fill m3 22.99 318.75 140 44,625.67
1.5 Cart away m3 316.78 324.42 30 9,732.56
1.6 25 cm thick hard core m2 691 643.60 85 54,705.92
Total to summary - 120,750.01
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 188 154.30 85 13,115.50
2.3 10 cm thick RC floor slab C-20 m 2
691 643.60 400 257,439.60
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 38 31.53 3200 100,896.00
Form work to -
2.7 Grade beam m2 302 224.92 200 44,984.00
2.10 Steps m2 4.5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 2734 2,467.53 46 113,506.32
2.12 Dia. 12mm def. bar kg -
2.13 Dia. 8mm def. bar kg 3000 3396.82 46 156,253.82
2.14 10/2 cm chip wood expansion joint m 485 542.60 48 26,044.80
Total to summary -
3. MASONARY WORK - 712,240.05
3.1 Trychitic or equivalent stone m3 68.98 96.72 1300 125,736.00
3.2 Ditto but above NGL m3 38 38.69 1350 52,228.80
Total to summary - 177,964.80
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 4.9 4.37 3200 13,977.60
1.2 In beam m3 23 20.21 3200 64,684.80
1.3 Lintel m3 1.3 3200 -
Form work to -
1.4 Elevation column m2 118 98.28 200 19,656.00
1.5 Beam m 2
302 281.13 250 70,281.25
1.6 Lintel m2 10.7 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg -
1.8 Dia. 12mm def. bar kg 2809 2,631.64 46 121,055.50
1.9 Dia. 8mm def. bar kg 779 751.72 48 36,082.78
Total to summary 325,737.92
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 538.00 415.26 450 186,867.00
2.2 15 cm thick m² 425.00 405.33 410 166,186.57
Total to summary……………..Birr 353,053.57

Contractor_______________________ Superviser______________________
IPD BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 696.74 784.08 350 274,426.25
Total to summary……………..Birr 274,426.25

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 927.45 1,358.30 30 40,749.00
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 534.6 1,602.42 22 35,253.24
4.3 Purlin Zigba size 5/7 cm m 714.6 952.80 40 38,112.00
Total to summary……………..Birr 114,114.24
Contractor_______________________ Superviser______________________
OPD BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 485 457.91 10 4,579.08
1.2 Trench m3 70.47 56.64 45 2,548.80
1.3 -
1.4 Selected borrowed fill m3 17.62 167.38 140 23,433.20
1.5 Cart away m3 198.35 194.01 30 5,820.37
1.6 25 cm thick hard core m2 450 337.19 85 28,660.90
Total to summary - 65,042.36
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 120 107.60 85 9,146.00
2.3 10 cm thick RC floor slab C-20 m 2
450 337.19 400 134,874.84
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 24 22.20 3200 71,040.00
Form work to -
2.7 Grade beam m2 120 173.60 200 34,720.00
2.8 In footing pad m 2
-
2.9 In footing column m2 -
2.10 Steps m2 5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1243 1,770.13 46 81,426.13
2.12 Dia. 12mm def. bar kg -
2.13 Dia. 8mm def. bar kg 2111 3,078.57 48 147,771.40
2.14 10/2 cm chip wood expansion joint m 329 327.40 22 7,202.80
Total to summary - 486,181.16
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 52.85 65.16 1300 84,708.00
3.2 Ditto but above NGL m3 24 26.06 1350 35,186.40
Total to summary - 119,894.40
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 4.9 3.49 3200 11,182.08
1.2 In beam m3 14 13.42 3200 42,931.20
1.3 Lintel m 3
1.1 3200 -
Form work to -
1.4 Elevation column m2 32 78.62 200 15,724.80
1.5 Beam m2 192 201.66 250 50,415.00
1.6 Lintel m2 10.1 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg -
1.8 Dia. 12mm def. bar kg 1883 1,531.09 46 70,430.12
1.9 Dia. 8mm def. bar kg 538 527.72 48 25,330.56
1.10 Dia. 6mm plain bar kg 0 -
Total to summary 216,013.76
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 360.00 266.28 450 119828.16
2.2 15 cm thick m² 182.00 294.91 410 120912.69
Total to summary……………..Birr 240,740.85
Contractor_______________________ Superviser______________________

OPD BLOCK Quantity Uint Total


Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 585.38 523.08 350 183,079.05
Total to summary……………..Birr 183,079.05

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 529 876.90 30 26,307.00
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 376 962.10 22 21,166.20
4.3 Purlin Zigba size 5/7 cm m 506.38 653.40 40 26,136.00
Total to summary……………..Birr 73,609.20

Contractor_______________________ Superviser______________________
STAFF RESIDENCE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 154 155.80 10 1,558.00
1.2 Trench m3 39.71 42.48 45 1,911.60
1.3 -
1.4 Selected borrowed fill m3 9.93 42.23 140 5,912.20
1.5 Cart away m3 75.98 89.22 30 2,676.60
1.6 25 cm thick hard core m2 97 89.72 100 8,971.80
Total to summary - 21,030.50
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 42 30.25 85 2,571.25
2.3 10 cm thick RC floor slab C-20 m 2
97 89.72 400 35,887.20
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 11 6.25 3200 20,000.00
Form work to -
2.7 Grade beam m2 45 49.40 3200 158,080.00
2.10 Steps m 2
4 3200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1391 492.37 46 22,649.17
2.13 Dia. 8mm def. bar kg 600 522.98 48 25,103.04
2.15 10/2 cm chip wood expansion joint m 300 174.30 22 3,834.60
Total to summary - 268,125.26
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 29.78 18.00 1300 23,400.00
3.2 Ditto but above NGL m 3
26 9.36 1350 12,636.00
Total to summary - 36,036.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.3 1.09 3200 3,494.40
1.2 In beam m 3
3.6 3.75 3200 12,000.00
1.3 Lintel m3 0.6 -
Form work to -
1.4 Elevation column m2 38 24.57 200 4,914.00
1.5 Beam m 2
60 57.70 250 14,425.00
1.6 Lintel m2 1.5 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg 0 -
1.8 Dia. 12mm def. bar kg 714 401.16 46 18,453.49
1.9 Dia. 8mm def. bar kg 250 151.76 48 7,284.43
1.10 Dia. 6mm plain bar kg -
Total to summary 60,571.32
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 305.00 140.34 450 63151.2
2.2 15 cm thick m² 66.00 75.89 410 31116.54
Total to summary……………..Birr 94,267.74

Contractor_______________________ Superviser______________________
STAFF RESIDENCE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 162 167.44 350 58,604.00
Total to summary……………..Birr 58,604.00

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 232 261.24 30 7,837.20
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 185 198.80 22 4,373.60
4.3 Purlin Zigba size 5/7 cm m 210 218.40 40 8,736.00
Total to summary……………..Birr 20,946.80

Contractor_______________________ Superviser______________________
SQ BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 91 112.10 10 1,121.00
1.2 Bulk excavation not exceeding 1.5m m3 136.5 34.56 45 1,555.20
1.3 Ditto but exceeding 1.5m & less than 2m m 3
45.5 50 -
1.4 Selected borrowed fill m3 182 24.12 140 3,376.80
1.5 Cart away m3 209.3 68.19 30 2,045.70
1.6 25 cm thick hard core m 2
35 42.50 85 3,612.33
Total to summary - 11,711.03
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 25 24.25 85 2,061.25
2.2 10 cm thick RC floor slab C-20 m2 35 42.50 85 3,612.33
C-25 RC 360kg/m3 -
2.3 In grade beam & step m 3
5 5.10 400 2,040.00
Form work to -
2.4 Grade beam m2 25 40.20 200 8,040.00
2.50 Steps m2 4 200 -
Re. steel bar -
2.6 Dia. 14mm def. bar kg 300 493.10 46 22,682.56
2.7 Dia. 12mm def. bar kg 300 46 -
2.8 Dia. 8mm def. bar kg 300 2.85 48 136.80
2.9 Dia. 6mm plain bar kg -
2.10 10/2 cm chip wood expansion joint m 45 53.10 22 1,168.20
Total to summary - 39,741.14
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 27 15.30 1300 19,890.00
3.2 Ditto but above NGL m3 8.8 7.96 1350 10,740.60
Total to summary - 30,630.60
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 1.2 1.09 3200 3,494.40
1.2 In beam m3 2.5 2.85 3200 9,120.00
Form work to -
1.3 Elevation column m2 21 24.57 200 4,914.00
1.4 Beam m2 30 42.04 250 10,510.00
Re. steel bar -
1.7 Dia. 14mm def. bar kg 0 -
1.8 Dia. 12mm def. bar kg 330 492.59 46 22,659.20
1.9 Dia. 8mm def. bar kg 250 151.76 46 6,980.91
1.10 Dia. 6mm plain bar kg 60 50 -
Total to summary 57,678.52
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 85.00 84.65 450 38091.6
2.2 15 cm thick m² 45.00 21.29 410 8730.54
Total to summary……………..Birr 46,822.14

Contractor_______________________ Superviser______________________
SQ BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 60 65.52 350 22,932.00
Total to summary……………..Birr 22,932.00

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 120 102.06 30 3,061.80
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 60 70.84 22 1,558.48
4.3 Purlin Zigba size 5/7 cm m 110 91.00 40 3,640.00
Total to summary……………..Birr 8,260.28
Contractor_______________________ Superviser______________________
OR & Delivery BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 1003 887.20 10 8,871.98
1.2 Trench m3 101.34 209.41 45 9,423.45
1.3 -
1.4 (A)Selected borrowed fill from out site m3 25.34 193.20 140 27,048.00
(b)Selected borrowed fill from in site m4 25.34 197.58 56.6 11,183.03
1.5 Cart away m3 376.91 266.16 30 7,984.80
1.6 25 cm thick hard core m 2
705 356.83 100 35,683.47
Total to summary - 100,194.79
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 234 150.28 85 12,773.38
2.3 10 cm thick RC floor slab C-20 m2 705 356.83 400 142,733.88
C-25 RC 360kg/m3 -
2.4 In grade beam & step m 3
39 30.96 3200 99,056.00
Form work to -
2.7 Grade beam m2 253 243.04 200 48,608.00
2.10 Steps m2 5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 2832 2,481.03 46 114,127.49
2.13 Dia. 8mm def. bar kg 865 3,128.29 48 150,157.89
2.14 10/2 cm chip wood expansion joint m 610 518.60 22 11,409.20
Total to summary - 578,865.84
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 76.01 91.25 1300 118,618.50
3.2 Ditto but above NGL m3 39 38.93 1350 52,557.12
Total to summary - 171,175.62
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 5.45 3.93 3200 12,579.84
1.2 In beam m3 23 19.72 3200 63,110.40
1.3 Lintel m 3
1.2 3200 -
Form work to -
1.4 Elevation column m2 110 88.45 200 17,690.40
1.5 Beam m2 313 304.41 250 76,102.50
1.6 Lintel m2 10 250 -
Re. steel bar -
1.7 Dia. 12mm def. bar kg 2882 2,532.72 46 116,505.03
1.8 Dia. 8mm def. bar kg 786 775.46 48 37,222.27
Total to summary 323,210.44
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 561.00 402.67 450 181199.47
2.2 15 cm thick m² 345.00 378.64 410 155242.52
Total to summary……………..Birr 336,442.00

Contractor_______________________ Superviser______________________
OR & DELIVERY BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 987.89 773.96 350 270,886.00
Total to summary……………..Birr 270,886.00

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 1305.31 899.58 30 26,987.40
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 752.4 1,506.12 22 33,134.64
4.3 Purlin Zigba size 5/7 cm m 1013.22 970.20 40 38,808.00
Total to summary……………..Birr 98,930.04

Contractor_______________________ Superviser______________________
EMERGENCY & WAITING Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 594.45 465.36 10 4,653.55
1.2 Trench m3 78.02 49.74 45 2,238.30
1.3 -
1.4 Selected borrowed fill m3 19.51 117.15 140 16,401.00
1.5 Cart away m3 236.85 139.61 30 4,188.20
1.6 25 cm thick hard core m2 347 225.31 100 22,530.86
Total to summary - 50,011.91
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 195 102.70 85 8,729.50
2.3 10 cm thick RC floor slab C-20 m 2
347 225.31 400 90,123.44
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 28 21.34 3200 68,272.00
Form work to -
2.7 Grade beam m2 140 281.90 200 56,380.00
2.10 Steps m 2
5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 2000 1,946.44 46 89,536.35
2.12 Dia. 8mm def. bar kg 2300 2,398.93 48 115,148.82
2.14 10/2 cm chip wood expansion joint m 390 234.14 22 5,151.08
Total to summary - 433,341.19
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 58.52 71.61 1300 93,093.00
3.2 Ditto but above NGL m 3
28 28.64 1350 38,669.40
Total to summary - 131,762.40
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 5.62 2.62 3200 8,386.56
1.2 In beam & steps m 3
16.7 9.39 3200 30,048.00
1.3 Lintel m3 1.3 3200 -
Form work to -
1.4 Elevation column m2 113 58.97 200 11,793.60
1.5 Beam m 2
224 71.61 250 17,902.50
1.6 Lintel m2 10.8 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg 1526 46 -
1.8 Dia. 12mm def. bar kg 1358 2,532.72 46 116,505.03
1.9 Dia. 8mm def. bar kg 1227 775.46 48 37,222.27
Total to summary 221,857.96
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 393.00 #VALUE! 450 #VALUE!
2.2 15 cm thick m² 226.00 140.68 410 57,680.85
Total to summary……………..Birr #VALUE!

Contractor_______________________ Superviser______________________
EMERGENCY & WAITING BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 596.38 427.36 350 149,576.00
Total to summary……………..Birr 149,576.00

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 790 632.78 30 18,983.40
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 502 586.84 22 12,910.48
4.3 Purlin Zigba size 5/7 cm m 667.74 547.40 40 21,896.00
Total to summary……………..Birr 53,789.88

Contractor_______________________ Superviser______________________
ADMINSTRATION Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 366 373.50 10 3,735.00
1.2 Trench m3 61.22 108.79 45 4,895.64
1.3 -
1.4 Selected borrowed fill m3 15.3 94.89 140 13,284.60
1.5 Cart away m3 155.71 220.84 30 6,625.26
1.6 25 cm thick hard core m2 284 210.63 100 21,062.73
Total to summary - 50,549.46
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 77 73.75 85 6,268.75
2.3 10 cm thick RC floor slab C-20 m 2
284 210.63 400 84,250.92
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 15 15.16 3200 48,512.00
2.5 Infooting pad m3 4 3200 -
2.6 In footing column m3 3.5 3200 -
Form work to -
2.7 Grade beam m2 77 119.08 200 23,816.00
2.10 Steps m2 5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1121 1,213.15 46 55,804.72
2.13 Dia. 8mm def. bar kg 1500 2,737.24 48 131,387.49
2.14 10/2 cm chip wood expansion joint m 221 229.00 22 5,038.00
Total to summary - 355,077.88
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 45.91 44.58 1300 57,954.00
3.2 Ditto but above NGL m3 15 5.94 1350 8,024.40
Total to summary - 65,978.40
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.6 2.18 3200 6,988.80
1.2 In beam & steps m3 9.3 9.16 3200 29,299.20
1.3 Lintel m3 0.75 3200 -
Form work to -
1.4 Elevation column m2 52 49.14 200 9,828.00
1.5 Beam m2 124 114.49 250 28,622.50
1.6 Lintel m2 8 250 -
Re. steel bar -
1.7 Dia. 12mm def. bar kg 1174 1,345.07 46 61,873.28
1.8 Dia. 8mm def. bar kg 325 374.62 48 17,981.66
1.9 Dia. 6mm plain bar kg -
Total to summary 154,593.45
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 250.00 166.50 450 74923.2
2.2 15 cm thick m² 125.00 283.78 410 116351.235
Total to summary……………..Birr 191,274.44

Contractor_______________________ Superviser______________________
ADMINSTRATION BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 342.46 342.22 350 119,777.00
Total to summary……………..Birr 119,777.00

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 446.56 575.20 30 17,256.00
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 276.8 605.80 22 13,327.60
4.3 Purlin Zigba size 5/7 cm m 385.6 433.80 40 17,352.00
Total to summary……………..Birr 47,935.60

Contractor_______________________ Superviser______________________
DIAGNOSTIC SERVICE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 343 382.98 10 3,829.83
1.2 Trench m3 59.26 90.55 45 4,074.67
1.3 -
1.4 Selected borrowed fill m3 14.82 117.12 140 16,396.98
1.5 Cart away m3 147.35 205.44 30 6,163.29
1.6 25 cm thick hard core m2 213 251.71 100 25,170.86
Total to summary - 55,635.61
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 70 65.48 85 5,565.37
2.3 10 cm thick RC floor slab C-20 m 2
213 251.71 400 100,683.44
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 22 13.54 3200 43,344.00
Form work to -
2.7 Grade beam m2 70 106.56 200 21,312.00
2.10 Steps m 2
5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1008 988.38 46 45,465.31
2.13 Dia. 8mm def. bar kg 1200 2,700.27 48 129,612.84
2.14 10/2 cm chip wood expansion joint m 208 197.80 22 4,351.60
Total to summary - 350,334.56
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 44.45 39.83 1300 51,772.50
3.2 Ditto but above NGL m 3
14 15.93 1350 21,505.50
Total to summary - 73,278.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.18 1.97 3200 6,289.92
1.2 In beam & steps m 3
8 8.18 3200 26,179.20
1.3 Lintel m3 0.8 3200 -
Form work to -
1.4 Elevation column m2 47 44.23 200 8,845.20
1.5 Beam m 2
111 131.86 250 32,963.75
1.6 Lintel m2 9 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg 0 -
1.8 Dia. 12mm def. bar kg 1028 1,078.41 46 49,607.04
1.9 Dia. 8mm def. bar kg 294 314.97 48 15,118.70
1.10 Dia. 6mm plain bar kg -
Total to summary - 139,003.81
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 146.00 158.53 450 71340.08
2.2 15 cm thick m² 218.00 291.68 410 119590.19
Total to summary……………..Birr 190,930.27

Contractor_______________________ Superviser______________________
DIAGNOSTIC BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 319.41 313.68 350 109,788.88
Total to summary……………..Birr 109,788.88

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 425.17 521.55 30 15,646.50
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 268.6 491.34 22 10,809.48
4.3 Purlin Zigba size 5/7 cm m 238 416.70 40 16,668.00
Total to summary……………..Birr 43,123.98

Contractor_______________________ Superviser______________________
GENERATOR HOUSE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 92 44.03 10 440.30
1.2 Trench m3 30.69 5.05 45 227.21
1.3 -
1.4 (A)Selected borrowed fill from out site m3 7.67 140
(B)Selected borrowed fill from in site m3 7.67 9.71 56.6 549.44
1.5 Cart away m3 50.62 13.21 30 396.27
1.6 25 cm thick hard core m2 88 17.07 100 1,707.24
Total to summary - 3,320.46
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 21 8.40 85 714.00
2.3 10 cm thick RC floor slab C-20 m2 88 17.07 400 6,828.96
C-25 RC 360kg/m3 -
2.4 In grade beam & step m 3
6 1.77 3200 5,664.00
Form work to -
2.7 Grade beam m2 35 14.16 200 2,832.00
2.10 Steps m2 2 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 538.69 46 24,779.83
2.12 Dia. 8mm def. bar kg 300 41.71 48 2,002.18
2.13 10/2 cm chip wood expansion joint m 120 36.30 22 798.60
Total to summary - 43,619.57
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 20 6.00 1300 7,800.00
3.2 Ditto but above NGL m3 6 1.20 1350 1,620.00
Total to summary - 9,420.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.18 0.44 3200 1,397.76
1.2 In beam m3 2 1.24 3200 3,955.20
Form work to -
1.3 Elevation column m2 24 9.83 200 1,965.60
1.4 Beam m 2
24 15.02 250 3,753.75
Re. steel bar -
1.5 Dia. 12mm def. bar kg 534 157.25 46 7,233.36
1.6 Dia. 8mm def. bar kg 150 47.48 48 2,278.99
Total to summary 20,584.67
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 163.00 39.52 450 17783.32
Total to summary……………..Birr 17,783.32

Contractor_______________________ Superviser______________________
GENERATOR HOUSE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 114 31.93 350 11,175.50
Total to summary……………..Birr 11,175.50

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 180 95.25 30 2,857.50
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 100 28.05 22 617.10
4.3 Purlin Zigba size 5/7 cm m 160 49.60 40 1,984.00
Total to summary……………..Birr 5,458.60

Contractor_______________________ Superviser______________________
KITCHEN Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 451 506.40 10 5,064.00
1.2 Bulk excavation not exceeding 1.5m m3 67.96 31.72 45 1,427.63
-
1.4 (A)Selected borrowed fill from out site m3 16.99 140
(B)Selected borrowed fill from in site m3 16.99 117.12 56.6 6,629.06
1.5 Cart away m3 186.27 151.92 30 4,557.60
1.6 25 cm thick hard core m 2
288 324.59 100 32,459.44
Total to summary - 50,137.73
2. CONCRETE WORK -
5 cm thick lean concrete C-7 (150kg/m 3) -
2.1 Masonary foundation m2 95 65.48 85 5,565.37
2.3 10 cm thick RC floor slab C-20 m2 288 324.59 400 129,837.76
C-25 RC 360kg/m 3
-
2.4 In grade beam & step m3 19 13.54 3200 43,344.00
Form work to -
2.7 Grade beam m2 153 106.56 200 21,312.00
2.10 Steps m 2
5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1381 1,505.58 46 69,256.62
2.13 Dia. 8mm def. bar kg 1500 2,021.25 48 97,020.22
2.14 10/2 cm chip wood expansion joint m 277 282.90 22 6,223.80
Total to summary - 372,559.78
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 50.97 45.14 1300 58,675.50
3.2 Ditto but above NGL m3 19 15.93 1350 21,505.50
Total to summary - 80,181.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 3.2 2.62 3200 8,386.56
1.2 In beam m 3
12 11.12 3200 35,596.80
1.3 Lintel m3 0.9 3200 -
Form work to -
1.4 Elevation column m2 63 58.97 200 11,793.60
1.5 Beam m2 152 156.75 250 39,187.50
1.6 Lintel m 2
9.3 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg -
1.8 Dia. 12mm def. bar kg 1432 1,635.66 46 75,240.38
1.9 Dia. 8mm def. bar kg 396 429.21 48 20,601.94
Total to summary 190,806.78
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 313.00 462.90 450 208,304.10
2.2 15 cm thick m² 151.00 10.10 410 4,141.41
Total to summary……………..Birr 212,445.51

Contractor_______________________ Superviser______________________
KITCHEN BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 424.17 423.87 350 148,354.50
Total to summary……………..Birr 148,354.50

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 558.2 719.00 30 21,570.00
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 346 757.25 22 16,659.50
4.3 Purlin Zigba size 5/7 cm m 477.6 537.30 40 21,492.00
Total to summary……………..Birr 59,721.50

Contractor_______________________ Superviser______________________
GUARD HOUSE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 39 36.26 10 362.60
1.2 Trench m3 19.98 4.21 45 189.54
1.3 -
1.4 (A)Selected borrowed fill from out site m3 5 140
(B)Selected borrowed fill from in site m3 5 7.03 56.6 397.90
1.5 Cart away m3 26.69 10.88 30 326.34
1.6 25 cm thick hard core m 2
14 10.29 100 1,029.00
Total to summary - 2,305.38
2. CONCRETE WORK -
5 cm thick lean concrete C-7 (150kg/m 3) -
2.1 Foundation m2 8 7.40 85 629.00
2.2 10 cm thick RC floor slab C-20 m2 14 10.29 400 4,116.00
C-25 RC 360kg/m 3
-
2.3 In grade beam & step m3 2 1.56 3200 4,992.00
Form work to -
2.3 Grade beam m2 15 12.48 200 2,496.00
2.40 Steps m2 2 200 -
Re. steel bar -
2.5 Dia. 14mm def. bar kg 122 545.95 46 25,113.79
2.7 Dia. 8mm def. bar kg 115 110.92 48 5,323.97
2.8 Dia. 6mm plain bar kg -
2.9 10/2 cm chip wood expansion joint m 22 14.60 22 321.20
Total to summary - 42,991.96
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 8 5.10 1300 6,630.00
3.2 Ditto but above NGL m3 3 1.80 1350 2,430.00
Total to summary - 9,060.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 0.55 0.44 3200 1,397.76
1.2 In beam m3 1 0.95 3200 3,033.60
Form work to -
1.3 Elevation column m2 8.72 9.83 200 1,965.60
1.4 Beam m2 16 13.23 250 3,307.50
Re. steel bar -
1.6 Dia. 12mm def. bar kg 72 151.39 46 6,963.77
1.7 Dia. 8mm def. bar kg 55 46.77 48 2,244.86
1.8 Dia. 6mm plain bar kg 3 50 -
Total to summary 18,913.09
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 56.00 69.49 450 31,271.40
2.2 15 cm thick m² 16.00 410 -
Total to summary……………..Birr 31,271.40

Contractor_______________________ Superviser______________________
GUARD HOUSE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 30 31.93 350 11,175.50
Total to summary……………..Birr 11,175.50

4. CARPENTRY & JOINERY


Carpentry Swan eucalyptus truss
4.1 Upper & lower chord size - diameter 10 - 12 cm m 44 95.25 30 2,857.50
4.2 Vertical & Diagonal members Size -diameter 8-10 cm m 27 28.35 22 623.70
4.3 Purlin Zigba size 5/7 cm m 47 49.60 40 1,984.00
Total to summary……………..Birr 5,465.20

Contractor_______________________ Superviser______________________
MOURGE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 42 36.26 10 362.60
1.2 Bulk excavation not exceeding 1.5m m3 20.7 4.21 45 189.54
1.3 -
1.4 (A)Selected borrowed fill from out site m3 5.18 140
(B)Selected borrowed fill from in site m3 5.18 7.03 56.6 397.90
1.5 Cart away m3 28.11 10.88 30 326.34
1.6 25 cm thick hard core m2 46 10.29 100 1,029.00
Total to summary - 2,305.38
2. CONCRETE WORK -
5 cm thick lean concrete C-7 (150kg/m 3) -
2.1 Masonary foundation m2 14 7.40 85 629.00
2.3 10 cm thick RC floor slab C-20 m2 46 10.29 400 4,116.00
C-25 RC 360kg/m 3
-
2.4 In grade beam & step m3 6 1.56 3200 4,992.00
Form work to -
2.7 Grade beam m2 32 12.48 200 2,496.00
2.10 Steps m2 2 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 675 423.98 46 19,503.26
2.13 Dia. 8mm def. bar kg 900 110.92 48 5,323.97
2.14 10/2 cm chip wood expansion joint m 120 14.60 22 321.20
Total to summary - 37,381.43
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 15.55 4.50 1300 5,850.00
3.2 Ditto but above NGL m3 6 0.60 1350 810.00
Total to summary - 6,660.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 0.98 0.44 3200 1,397.76
1.2 In beam m3 1.98 0.95 3200 3,033.60
Form work to -
1.4 Elevation column m2 19 9.83 200 1,965.60
1.5 Beam m2 25.32 13.23 250 3,307.50
Re. steel bar -
1.7 Dia. 14mm def. bar kg -
1.8 Dia. 12mm def. bar kg 305 147.12 46 6,767.70
1.9 Dia. 8mm def. bar kg 130 43.92 48 2,108.35
Total to summary - 18,580.51
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 120.00 34.67 450 15,602.40
2.2 15 cm thick m² 0.00 410 -
Total to summary……………..Birr 15,602.40

Contractor_______________________ Superviser______________________
TAKE OFF SHEET

PROJECT LOCATION - T.S. No - 04


CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-1 IPD
A. Sub Structure 1.6 25cm thick hard core
1. Excavation & Earth Work 5.83
40.50 1.1 Site clearing 2.33 13.58
20.55 832.28
5.83
832.28 m2 7.15 41.68
1.2 Trench excavation
5 39.00 in ordinary soil 5.83
0.80 2.45 14.28
0.30 46.80
8 14.55 5.83
0.80 5.80 33.81
0.30 27.94
74.74 m3 2.40
2.33 5.59

2.40
7.15 17.16

1.4 Fill borrowed materials 2.40


1 39.00 Including 0.25 working space 2.45 5.88
19.05 both sides
0.52 386.33 2.40
deduction masonary wall 5.80 13.92
-5 38.50
0.52 2 5.85
0.40 (40.04) 2.33 27.26

-8 16.55 2 5.85
0.52 7.15 83.66
0.40 (27.54)
318.75 m3 2 5.85
398.44 add bulckaeg 25 % with mistek 2.45 28.67
(79.69) deduction bulckaeg 25%
318.75 m3 Total 2 5.85
1.5 Cart away excavated 5.80 67.86
materials
1 832.28 2 5.95
0.30 249.68 Item No 1.1 2.33 27.73
74.74 Item No 1.2
324.42 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT LOCATION - T.S. No - 04


CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
IPD
2 5.95 2.4 In gread beam
7.15 85.09 5 38.50
0.40
2 5.95 0.25 19.25
2.45 29.16
8 15.35
2 5.95 0.40
5.80 69.02 0.25 12.28
31.53 m3
4.47 2.7 Form work to grade beam
2.33 10.42 2 38.50
0.40 30.80
4.47
7.15 31.96 6 34.50
0.40 82.80
4.47
2.45 10.95 2 16.35
0.40 13.08
4.47
5.80 25.93 16 15.35
643.60 m2 0.40 98.24
224.92 m2
Reinforcement bar
2. Concrete work 2.11 Dia. 14mm deformation bar
5 38.60 2.1 50mm thick lean
0.50 96.50 concrete. 2,467.53 kg
2.12 Dia. 12mm deformation bar
8 14.45
0.50 57.80 - kg
154.30 m2 2.13 Dia. 8mm deformation bar

2.3 10cm thick RC floor slab C-20 3,396.82 kg


Ditto as item 1.6

643.60 m2 2.14 10/2cm chip wood expansion joint


8 36.50 292.00 38.5-(8*0.25)=36.5

14 17.90 250.60 19.15-(5*0.25)=17.90


542.60 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT LOCATION - T.S. No - 04


CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
IPD A. Super Structure
3. Masonary Work 1. Concrete work
3.1 Stone masonarry work 40 2.73 1.1 In elevaation Column
5 38.00 Foundation wall BNGL 0.20
0.40 0.20 4.37
0.75 57.00 4.37 m3
5 38.50 1.2 In beams
8 16.55 0.30
0.40 0.20 11.55
0.75 39.72
96.72 m3 8 18.05
0.30
3.2 ditto but above N.G external 0.20 8.66
left pointed 20.21 m3
FORM WORK TO
5 38.00 80 2.73 1.4 Elevation column
0.40 0.25 54.60 40*2=80
0.30 22.80
80 2.73
8 16.55 0.20 43.68
0.40 98.28 m2
0.30 15.89 1.5 In beams
38.69 m3 2 38.50 axis x01&x05 external side
0.30 23.10

8 36.90 axis x01 - x05 internal side


0.30 88.56

5 36.90 axis x01 - x05 internal sofft side


0.25 46.13

2 19.05 axis y01 & y08 external side


0.30 11.43

14 18.05 axis y01- y08 internal side


0.30 75.81

8 18.05 axis y01- y08 internal sofft side


0.25 36.10
281.13 m2

Reinforcement bar
1.8 Dia. 12mm deformation bar
2,631.64 kg

1.9 Dia. 8mm deformation bar


751.72 kg

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT LOCATION - T.S. No - 04


CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
IPD -2 4.30
2. BLOCK WORK 1.73 -14.88 diduct for window WD4
2.1 20cm thick HCB
2 36.90 -5 0.80
2.73 201.47 Add for axis x/01 &- x/04 2.73 -10.92 diduct for door 10

2 15.55 -5 0.90
2.73 84.90 Add for axis Y/01 & Y/08 2.73 -12.29 diduct for door 9

2 38.50 -1 1.30
0.25 19.25 Add for axis x/01- x/04 Above TTB 2.73 -3.55 diduct for door 11
F &R SIDE
1 18.55 -1 2.50
1.85 34.32 Add for axis Y/01 & Y/08 Above 2.73 -6.83 diduct for opening
TTB Gable side 415.26 m2 TOTAL
1 72.10
2.73 196.83 Add for partion wall TL=72.10 2.2 15cm thick HCB
1 155.97 Total length of partition wall= 155.97

-3 1.30 2.73 425.80 Add For partition wall


1.73 -6.75 diduct for window 4
5 4.80
-2 1.20 1.73 41.52 Add For partition wall WD1
0.60 -1.44 diduct for window 20
-1 1.60
-12 1.50 1.73 -2.77 Add For partition wall WD9
1.73 -31.14 diduct for window 2
-3 0.90
-7 1.30 2.73 -7.37 Diducte for door 9
0.60 -5.46 diduct for window 15
-9 0.80
-1 0.90 2.73 -19.66 Diducte for door 7
0.60 -0.54 diduct for window 7
-4 1.00
-1 0.75 2.73 -10.92 Diducte for door 5
1.73 -1.30 diduct for window 5
-10 0.70
-1 6.00 2.73 -19.11 Diducte for door 8
0.60 -3.60 diduct for window 18
-4 0.90
-3 4.40 0.60 -2.16 diduct for window 7
1.73 -22.84 diduct for window WD3 405.33 m2 TOTAL

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT LOCATION - T.S. No - 04


CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
IPD
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 24 39.70
projection 952.80
39.70
19.75 952.80 ml
784.08

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss = 34
Upper = 34x2 =68

68 10.10 . 10.10 10.10


686.80
19.75

Lower =34x1= 34
34 19.75
671.50

1,358.30 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=1.85+2(1.68+1.51+1.34+ 1.18
+1.00+0.84+0.70+0.50+0.35)
34 20.45 =20.45ml
695.30
Diag=2(1.91+1.76+1.62+1.48+1.35
+1.23+1.12+1.03+0.96+0.91)
34 26.68 =26.68ml
907.12

1,602.42 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
A. Sub Structure 2 3.62 1.6 25cm thick hard core
1. Excavation & Earth Work 3.92 28.38
1 34.69 1.1 Site clearing
13.20 457.91 1 3.62
2.35 8.51
457.91 m2
10 4.75
3.92 186.20
1.2 Trench excavation
4 35.60 in ordinary soil 5 4.75
0.90 2.35 55.81
0.30 38.45
2 5.72
8 11.70 3.92 44.84
0.90
0.30 25.27 1 5.72
2.35 13.44
63.72 m3
337.19 m2
1.4 Fill borrowed materials 2. Concrete work
1 35.60 Including 0.25 working space 4 35.20 2.1 50mm thick lean
11.70 both sides 0.50 70.40 concrete.
0.50 208.26
deduction masonary wall 8 9.30
-4 35.10 0.50 37.20
0.50 107.60 m2
0.40 (28.08)
2.3 10cm thick RC floor slab C-20
-8 8.00 Ditto as item 1.6
0.50
0.40 (12.80) 337.19 m2
167.38 m3 Total
209.23 add bulckaeg 25 % with mistek 2.4 In gread beam
(41.85) deduction bulckaeg 25% 4 35.10
167.38 m3 Total 0.40
1.5 Cart away excavated 0.25 14.04
materials
1 457.91 8 10.20
0.30 137.37 Item No 1.1 0.40
56.64 Item No 1.2 0.25 8.16
194.01 m3 22.20 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
3. Masonary Work
2.7 Form work to grade beam 3.1 Stone masonarry work
2 35.10 4 35.10 Foundation wall BNGL
0.40 28.08 0.40
0.75 42.12
6 33.10
0.40 79.44 8 9.60
0.40
2 11.20 0.75 23.04
0.40 8.96 65.16 m3

14 10.20 3.2 Ditto but above N.G.L left for


0.40 57.12 pointed
173.60 m2
Reinforcement bar 4 35.10
2.11 Dia. 14mm deformation bar 0.40
0.30 16.85
1,770.13 kg
2.12 Dia. 12mm deformation bar 8 9.60
0.40
- kg 0.30 9.22
2.13 Dia. 8mm deformation bar 26.06 m3

3,078.57 kg

2.14 10/2cm chip wood expansion joint

6 33.10 198.60 35.10-(8*0.25)=33.10

14 9.20 128.80 11.20-(8*0.25)=9.20

327.40 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
A. Super Structure
1. Concrete work 2 11.20 ax s Y01 & Y08 external side
32 2.73 1.1 In elevaation Column 0.30 6.72
0.20
0.20 3.49 14 10.40 axis Y01 - Y08 internal side
3.49 m3 0.30 43.68

1.2 In beams 14 10.40 axis Y01 to Y08 internal sofft side


4 35.10 0.25 36.40
0.30
0.20 8.42 201.66 m2

8 10.40 Reinforcement bar


0.30 1.8 Dia. 12mm deformation bar
0.20 4.99 1,531.09 kg

13.42 m3 1.9 Dia. 8mm deformation bar


FORM WORK TO
1.4 Elevation column 527.72 kg
64 2.73
0.25 43.68 32*2=64

64 2.73
0.20 34.94

78.62 m2

1.5 In beams

2 35.10 axis x01& x04 external side


0.30 21.06

6 33.50 axis x01 - x04 internal side


0.30 60.30

4 33.50 axis x01 - x04 internal sofft side


0.25 33.50

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
2. BLOCK WORK -1 1.60
2.1. 20CM THICK HCB 0.60 -0.96 Diducte for window 7
3 33.50
2.73 274.37 for axisY/01,Y/03&Y/04 -2 1.40
2.73 -7.64 Diducte for door 1
1 13.21 266.28 m2 m2 TOTAL
1.75 23.12 Add for AxisX/01 & X/08 Abave TTB Gable side
2.2 15cm thick HCB
2 35.10 1 33.50
0.25 17.55 Add for AxisY/01 & Y/04 Abave TTB F & R side 2.73 91.46 Add For axis Y/02

1 12.41 Total length of partition wall= 57.07


2.73 33.88 Add for AxisX/01 & X/08 1 91.70
2.73 250.34 Add For partition wall
-13 1.50
1.73 -33.74 Diducte for window 2 -11 0.90
2.73 -27.03 Diducte for door 9
-5 1.30
1.73 -11.25 Diducte for window 4 -4 0.80
2.73 -8.74 Diducte for door 7
-1 1.20
1.73 -2.08 Diducte for window 9 -1 1.00
2.73 -2.73 Diducte for door 5
-1 1.80
1.73 -3.11 Diducte for window 23 opening -4 0.70
2.73 -7.64 Diducte for door 8
-5 0.90
2.73 -12.29 Diducte for Door 9 -1 1.25
0.60 -0.75 Diducte for window 9
-1 1.20 294.91 m2 TOTAL
2.73 -3.28 Diducte for Door 11

-1 2.40
2.73 -6.55 Diducte for waiting room opening

-1 2.90
0.60 -1.74 Diducte for window 25

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
OPD
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 36.30
projection 653.40
36.30
14.41 653.40 ml
523.08

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss = 30
Upper = 30x2 =60

60 7.41 . 7.41 7.41


444.60
14.41

Lower =34x1= 34
30 14.41
432.30

876.90 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=1.63+2(1.53+1.31+1.09+ 0.88
+0.66+0.44+0.22)
30 13.89 =13.89ml
416.70
Diag=2(1.78+1.59+1.42+1.26+1.11+
1+0.93)
30 18.18 =18.18ml
545.40

962.10 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
A. Sub Structure 2 3.92 1.6 25cm thick hard core
1. Excavation & Earth Work 5.70 44.69
1 19.00 1.1 Site clearing
8.20 155.80 2 3.95
155.80 m2 5.70 45.03
89.72 m2
2. Concrete work
1.2 Trench excavation 2 17.00 2.1 50mm thick lean
2 17.50 in ordinary soil 0.50 17.00 concrete.
0.80
0.90 25.20 5 5.30
0.50 13.25
5 4.80 30.25 m2
0.80
0.90 17.28 2.3 10cm thick RC floor slab C-20
Ditto as item 1.6
42.48 m3
89.72 m2

1.4 Fill borrowed materials 2.4 In gread beam


1 17.50 Including 0.25 working space 2 17.00
6.70 both sides 0.40
0.45 52.76 0.25 3.40
deduction masonary wall
-2 17.00 5 5.70
0.40 0.40
0.45 (6.12) 0.25 2.85
6.25 m3
-5 4.90 2.7 Form work to grade beam
0.40 2 17.00
0.45 (4.41) 0.40 13.60
42.23 m3 Total
52.79 add bulckaeg 25% with mistek 2 15.75
(10.56) deduction bulckaeg 25% 0.40 12.60
42.23 m3 Total
1.5 Cart away excavated 2 6.20
materials 0.40 4.96
1 155.80
0.30 46.74 Item No 1.1 8 5.70
42.48 Item No 1.2 0.40 18.24
89.22 m3 49.40 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE A. Super Structure
Reinforcement bar 1. Concrete work
2.11 Dia. 14mm deformation bar 10 2.73 1.1 In elevaation Column
0.20
492.37 kg 0.20 1.09
2.12 Dia. 12mm deformation bar 1.09 m3

- kg 2 17.00 1.2 In beams


2.13 Dia. 8mm deformation bar 0.30
0.20 2.04
522.98 kg
5 5.70
2.15 10/2cm chip wood expansion joint 0.30
0.20 1.71
6 15.75 94.50 17--(5*0.25)=15.75 3.75 m3
FORM WORK TO
14 5.70 79.80 6.2-(2*0.25)=5.7 20 2.73 1.4 Elevation column
0.25 13.65
174.30 ml 10*2=20
3. Masonary Work 20 2.73
3.1 Stone masonarry work 0.20 10.92
2 17.00 Foundation wall BNGL 24.57 m2
0.40 1.5 In beams
0.75 10.20 2 17.00 axis x01& x02 external side
0.30 10.20
5 5.20
0.40 2 16.60 axis x01 - x02 internal side
0.75 7.80 0.30 9.96
18.00 m3
2 16.60 axis x01 - x02 internal sofft side
0.25 8.30
3.2 Ditto but above N.G.L left for
pointed 2 6.20 axis Y01&Y05 external side
2 17.00 0.30 3.72
0.40
0.39 5.30 8 5.80 axis Y01 to Y05 internal side
0.30 13.92
5 5.20
0.40 8 5.80 axis Y01 to Y05 internal sofft side
0.39 4.06 0.25 11.60
9.36 m3 57.70 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
Reinforcement bar 2.2 15cm thick HCB
1.8 Dia. 12mm deformation bar 4 6.95
401.16 kg 2.73 75.89
75.89 m2 TOTAL
1.9 Dia. 8mm deformation bar

151.76 kg

2. BLOCK WORK
2.1 . 20CM THICK HCB
2 16.00
2.73 87.36 for axis x/01 & x/02

5 5.80
2.73 79.17 Add for axis y/01 - y/05

1 6.20 Add for AxisY/01 & Y/05 Abave TTB


1.35 8.37 Gable side

2 17.00
0.25 8.50 Add for Axis X/01 & X/02 Abave TTB
F & R side
-8 0.90
2.73 -19.66 Diducte for door 6

-4 1.80
1.73 -12.46 Diducte for window 7 opening

-4 1.00
1.73 -6.92 Diducte for window 10 opening

-4 0.90
1.12 -4.032 Diducte for window 11 opening
140.34 m2 TOTAL

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 12 18.20
projection 218.40
18.20
9.20 218.40 ml
167.44

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss = 15
Upper = 15x2 =30

30 4.73 . 4.73 4.73


141.90
9.20

Lower =15x1=15
15 9.20
138.00

279.90 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=1.10+2(0.88+0.67+0.45+0.24)
=5.58ml
15 5.58
83.70
Diag=2(1.26+1.12+1.00+0.93)_
=8.62ml
15 8.62
129.30

213.00 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER
A. Sub Structure 2 3.92 1.6 25cm thick hard core
2.70 21.17
1. Excavation & Earth Work
1 19.00 1.1 Site clearing 2 3.95
5.90 112.10 2.70 21.33
112.10 m2 42.50 m2
1.2 Trench excavation 2. Concrete work
2 17.50 in ordinary soil 2 17.00 2.1 50mm thick lean
0.80 0.50 17.00 concrete.
0.90 25.20
5 2.90
5 2.60 0.50 7.25
0.80 24.25 m2
0.90 9.36
2.2 10cm thick RC floor slab C-20
34.56 m3 Ditto as item 1.6

42.50 m2
1.4 Fill borrowed materials
2.3 In gread beam
1 17.50 Including 0.25 working space 2 17.00
4.40 both sides 0.40
0.45 34.65 0.25 3.40
deduction masonary wall
-2 17.00 5 3.40
0.40 0.40
0.45 (6.12) 0.25 1.70
5.10 m3
-5 4.90 2.4 Form work to grade beam
0.40 2 17.00
0.45 (4.41) 0.40 13.60
24.12
30.15 add bulckaeg 25 % with mistek 2 15.75
(6.03) deduction bulckaeg 25% 0.40 12.60
24.12 m3 Total
1.5 Cart away excavated 2 3.90
materials 0.40 3.12
1 112.10
0.30 33.63 Item No 1.1 8 3.40
34.56 Item No 1.2 0.40 10.88
68.19 m3 40.20 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER A. Super Structure
1. Concrete work
Reinforcement bar 10 2.73 1.1 In elevaation Column
2.6 Dia. 14mm deformation bar 0.20
0.20 1.09
493.10 kg 1.09 m3
2.7 Dia. 12mm deformation bar 1.2 In beams
2 17.00
- kg 0.30
2.8 Dia. 8mm deformation bar 0.20 2.04

302.18 kg 5 2.70
0.30
2.10 10/2cm chip wood expansion joint 0.20 0.81
2.85 m3
2 15.75 31.50 17--(5*0.25)=15.75 FORM WORK TO
20 2.73 1.3 Elevation column
8 2.70 21.60 0.25 13.65
10*2=20
53.10 ml 20 2.73
3. Masonary Work 0.20 10.92
3.1 Stone masonarry work 24.57 m2
2 17.00 Foundation wall BNGL 1.4 In beams
0.40 2 17.00 axis x01& x02 external side
0.75 10.20 0.30 10.20

5 3.40 2 16.00 axis x01 - x02 internal side


0.40 0.30 9.60
0.75 5.10
15.30 m3 2 16.00 axis x01 - x02 internal sofft side
0.25 8.00
3.2 Ditto but above N.G.L left for
pointed 2 3.20 axis Y01&Y05 external side
2 17.00 0.30 1.92
0.40
0.39 5.30 8 2.80 axis Y01 to Y05 internal side
0.30 6.72
5 3.40
0.40 8 2.80 axis Y01 to Y05 internal sofft side
0.39 2.65 0.25 5.60
7.96 m3 42.04 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER
Reinforcement bar 3 Roofing
1.8 Dia. 12mm deformation bar 3.1 G-28 CIS Roof measured in horizontl
492.59 kg projection
18.20
1.9 Dia. 8mm deformation bar 9.20
167.44
151.76 kg
4 Carpentry & Joinery
4.1 Upper & lower chord dia. 10 - 12 cm
2. BLOCK WORK No of Truss = 15
2.1. 20CM THICK HCB Upper = 15x2 =30
2 16.00
. 3.69
2.73 87.36 for axis x/01 & x/02 30 3.69
110.70
2 2.60 . 3.6
2.73 14.20 Add for axis y/01& y/05
Lower =15x1= 15
1 3.00 Add for AxisY/01 & Y/05 Abave TTB 15 9.20
1.10 3.30 Gable side 138.00

2 17.00 248.70 ml
0.25 8.50 Add for Axis X/01 & X/02 Abave TTB
F & R side 4.2 Vertical & Diagonal dia. 8 - 10 cm
-4 0.90
2.73 -9.83 Diducte for door 6 opening Ver.=0.82+0.62+0.41+0.21
=2.06ml
-4 1.50 15 2.06
1.73 -10.38 Diducte for window 2 opening 30.90
84.65 m2 TOTAL Diag=1.09+0.99+0.92
=3.00ml
2.2 15cm thick HCB 15 3.00
3 2.60 45.00
2.73 21.29
21.29 m2 TOTAL 75.90 ml

4.3 Purlin zigba siz 5*7 cm


10 18.20
182.00

182.00 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
A. Sub Structure 1.6 25cm thick hard core
1. Excavation & Earth Work 2 5.72
1 45.85 1.1 Site clearing 7.12 40.73
19.35 887.20
887.20 m2 5.72
1.2 Trench excavation 2.45 14.01
4 43.35 in ordinary soil
0.90 6 5.75
0.90 140.45 7.12 40.94

9 13.25 3 5.75
0.90 2.45 14.09
0.90 96.59
2 4.75
1 45.85 Bulk excavation 7.12 33.82
19.35
0.25 221.80 4.75
458.85 m3 2.45 11.64

1.4 Fill borrowed materials 2 4.90


1 42.90 Including 0.25 working space 7.12 34.89
16.85 both sides
0.65 469.86 4.90
deduction masonary wall 2.45 12.01
-4 42.85
0.40 2 4.85
0.65 (44.56) 7.12 69.06

-9 14.75 1 4.85
0.40 2.45 11.88
0.65 (34.52)
390.78 2 4.42
494.64 add bulckaeg 25% with mistek 7.12 62.94
(98.92) deduction bulckaeg 25 %
390.78 m3 Total 1 4.42
1.5 Cart away excavated 2.45 10.83
materials
1 887.20 356.83 m2
0.30 266.16
Item No 1.1
266.16 m3 Item No 1.2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
2. Concrete work Reinforcement bar
4 42.85 2.1 50mm thick lean 2.11 Dia. 14mm deformation bar
0.50 85.70 concrete.
2,481.03 kg
9 14.35 2.12 2.7 Dia. 12mm deformation bar
0.50 64.58
150.28 m2 - kg
2.13 Dia. 8mm deformation bar
2.3 10cm thick RC floor slab C-20
Ditto as item 1.6 3,128.29 kg
356.83 m2
2.10 10/2cm chip wood expansion joint
2.3 In gread beam
4 42.85 6 41.90 251.40 44.15-(9*0.25)=41.90
0.40
0.25 17.14 16 16.70 267.20 17.7-(4*0.25)=16.70

9 15.35 518.60 ml
0.40
0.25 13.82 3. Masonary Work
30.96 m3 3.1 Stone masonarry work
4 42.85 Foundation wall BNGL
0.40
2.7 Form work to grade beam 0.75 51.42
2 42.85
0.40 34.28 9 14.75
0.40
6 40.60 0.75 39.83
0.40 97.44 91.25 m3

2 16.35 3.2 Ditto but above N.G.L left for


0.40 13.08 pointed
4 42.85
16 15.35 0.40
0.40 98.24 0.32 21.94
243.04 m2
9 14.75
0.40
0.32 16.99
38.93 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
A. Super Structure
1. Concrete work 2 17.70 axis Y01&Y09 external side
36 2.73 1.1 In elevaation Column 0.30 10.62
0.20
0.20 3.93 16 16.90 axis Y01 to Y09 internal side
3.93 m3 0.30 81.12

1.2 In beams 16 16.90 axis Y01 to Y09 internal sofft side


4 44.15 0.25 67.60
0.30 304.41 m2
0.20 10.60
Reinforcement bar
9 16.90 1.8 Dia. 12mm deformation bar
0.30 2,532.72 kg
0.20 9.13
1.9 Dia. 8mm deformation bar
19.72 m3
FORM WORK TO 775.46 kg
1.3 Elevation column
72 2.73
0.25 49.14 36*2=72

72 2.73
0.20 39.31

88.45 m2

1.4 In beams

2 44.15 axis x01& x04 external side


0.30 26.49

6 42.35 axis x01 - x04 internal side


0.30 76.23

4 42.35 axis x01 - x04 internal sofft side


0.25 42.35

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT LO T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR -4 0.90
2.73 -9.83 diduct for door 6
2. BLOCK WORK
2.1 20cm thick HCB -2 1.30
2.73 -7.10 diduct for door 3
2 41.1
2.73 224.41 Add for axis x/01- x/04 -2 0.80
2.73 -4.37 diduct for door 10
2 15.55
2.73 84.90 Add for axis Y/01 & Y/09 -1 0.80
2.73 -2.18 diduct for door 14
2 42.90
0.25 21.45 Add for axis x/01- x/04 Above TTB -4 0.90
F &R SIDE 2.73 -9.83 diduct for door 9
1 16.35 402.67 m2 Total
1.85 30.25 Add for axis Y/01 & Y/09 Above
TTB Gable side 2.2 15cm thick HCB
1 33.00 1 169.56 Total length of partition wall= 169.56

2.73 90.09 Add for partion wall 2.73 462.90 Add For partition wall

2 12.20 -11 0.90


2.73 66.61 Add for axis y/01 & y/06 2.73 -27.03 diduct for door 9

2 2.50 -6 1.40
2.73 13.65 Add for Corridor wall 2.73 -22.93 diduct for door 2

-24 1.50 -6 0.70


1.73 -62.28 diduct for window 2 2.73 -11.47 diduct for door 8

-1 1.30 -1 1.00
1.73 -2.25 diduct for window 4 2.73 -2.73 diduct for door 5

-2 1.00 -7 0.80
1.73 -3.46 diduct for window 14 2.73 -15.29 diduct for door 7

-5 1.10 -1 1.25
1.73 -9.52 diduct for window 12 0.60 -0.75 diduct for window 9

-1 1.50 -1 1.25
1.73 -2.59 diduct for window 16 1.73 -2.16 diduct for window 8

-4 1.40 -1 1.10
2.73 -15.29 diduct for D1=1 & D2=3 1.73 -1.90 diduct for window
378.64 m2 Total

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 22 44.10
projection 970.20
44.10
17.55 970.20 ml
773.96

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =37
Upper =37x2 =74

74 9.03 . 9.03 9.03


668.22
18.40

Lower =37x1= 37
37 9.20
340.40

1,008.62 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=2.00+2(1.88+1.60+1.45+1.23
+1.00+0.78+0.57+0.36+0.20)
37 20.14 =20.14ml
745.18
Diag=2(2.08+1.89+1.71+1.53+1.41
+1.19+1.06+0.97+0.91)
37 25.50 =25.50ml
943.50

1,688.68 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
A. Sub Structure deduction masonary wall
1. Excavation & Earth Work -4 23.30
1 25.30 1.1 Site clearing 0.40 Emergency
13.35 337.76 0.60 (22.37)

1 11.00 -6 14.75 Emergency


11.60 127.60 0.40
465.36 m2 0.60 (21.24)
-3 10.50
1.2 Trench excavation 0.40 Waiting
4 23.80 in ordinary soil 0.60 (7.56)
0.80 Emergency -3 8.40 Waiting
0.30 22.85 0.40
0.60 (6.05)
6 8.25 Emergency 177.15 m3 Total
0.80 221.44 m3 add bulckaeg 25% 125.61m³
0.30 11.88 (44.29) dudaction bulckeg 25%
177.15 m3
3 10.75 Waiting
0.80 1.5 Cart away excavated
0.30 7.74 materials
1 465.36
3 10.10 Waiting 0.30 139.61 Item No 1.1
0.80 139.61 m3
0.30 7.27
1.6 25cm thick hard core
49.74 m3 1 5.72
4.07 23.28

1.4 Fill from site excavated materials 5.72


2.35 13.44
1 23.80
11.85 1 5.72
0.60 169.22 3.92 22.42

1 10.75 1 4.50
10.10 4.07 18.32
0.60 65.15
1 4.50
2.35 10.58

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
3 10.60
1 4.50 0.50 15.90
3.92 17.64
3 8.10 `
1 3.90 0.50 12.15
4.07 15.87 102.70 m2

1 3.90 2.3 10cm thick RC floor slab C-20


2.35 9.17 Ditto as item 1.6
225.31 m2
1 3.90
3.92 15.29 2.4 In gread beam
4 23.30
1 4.20 0.40
4.07 17.09 0.25 9.32

1 4.20 6 10.35
2.35 9.87 0.40
0.25 6.21
1 4.20
3.92 16.46 3 10.50
0.40
1 3.47 0.25 3.15
4.07 14.12
3 8.85
1 3.47 0.40
2.35 8.15 0.25 2.66
21.34 m3
1 3.47
3.92 13.60 2.7 Form work to grade beam
2 42.85
225.31 m2 0.40 34.28

2 Concrete work 6 40.60


4 23.30 2.1 50mm thick lean 0.40 97.44
0.50 46.60 concrete.
2 16.35
6 9.35 0.40 13.08
0.50 28.05

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
16 15.35 3. Masonary Work
0.40 98.24 4 23.30 3.1 Stone masonarry work
0.40 Foundation wall BNGL
2 10.50 0.75 27.96
0.40 8.40 6 14.75
0.40
4 10.00 0.75 26.55
0.40 16.00 3 10.60
0.40
1 9.60 0.75 9.54
0.40 3.84 3 8.40
0.40
3 8.85 0.75 7.56
0.40 10.62 71.61 m3
281.90 m2
3.2 ditto but above N.G external
Reinforcement bar 4 23.30 left pointed
2.11 Dia. 14mm deformation bar 0.40
1,946.44 kg 0.30 11.18
2.12 Dia. 8mm deformation bar 6 14.75
2,398.93 kg 0.40
0.30 10.62
2.14 10/2cm chip wood expansion joint 3 10.60
0.40
6 5.72 34.32 0.30 3.82
3 8.40
6 4.50 27.00 0.40
0.3 3.02
6 3.90 23.40 28.64 m3

6 4.20 25.20

6 3.47 20.82

10 4.07 40.70

10 2.35 23.50

10 3.92 39.20
234.14 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
A. Super Structure 2 11.35 axis Y01&Y06 external side
1. Concrete work 0.30 6.81
24 2.73 1.1 In elevaation Column
0.20 10 10.55 axis Y01 to Y06 internal side
0.20 2.62 0.30 31.65
2.62 m3
6 22.10 axis Y01 to Y06 internal sofft side
1.2 In beams 0.25 33.15
4 23.30 71.61 m2
0.30
0.20 5.59 Reinforcement bar
1.8 Dia. 12mm deformation bar
6 10.55 2,532.72 kg
0.30
0.20 3.80 1.9 Dia. 8mm deformation bar

9.39 m3 775.46 kg
FORM WORK TO
1.3 Elevation column
48 2.73
0.25 32.76 24*2=48

48 2.73
0.20 26.21

58.97 m2

1.4 In beams

2 23.30 axis x01& x04 external side


0.30 13.98

6 22.10 axis x01 - x04 internal side


0.30 39.78

6 22.10 axis x01 - x04 internal sofft side


0.25 33.15

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
2. BLOCK WORK -9 1.50
2.1 20cm thick HCB Emergency 1.73 -23.36 diduct for window 2

3 22.1 -1 1.00
2.73 181.00 Add for axis x/01 , x/02 & x/04 1.73 -1.73 diduct for window 14

2 10.55 -2 1.30
2.73 57.60 Add for axis Y/01 & Y/07 1.73 -4.50 diduct for window 4

2 42.90 -1 2.85
0.25 21.45 Add for axis x/01- x/04 Above TTB 0.60 -1.71 diduct for window 6
F &R SIDE
1 16.35 -1 1.25
1.85 30.25 Add for axis Y/01 & Y/07 Above 0.60 -0.75 diduct for window 9
TTB Gable side 264.28 m2 Total
5 4.00
2.73 54.60 Add for partion wall 2.2 15cm thick HCB Emergency
1 22.10
-1 4.00 2.73 60.33 Add for axis x/03
1.73 -6.92 diduct for opening waiting area
1 38.05 Total length of partition wall= 38.05

-1 1.75 2.73 103.88 Add For partition wall


1.73 -3.03 diduct for opening waiting area
-2 1.20
-1 2.95 2.73 -6.55 diduct for door 4
2.73 -8.05 diduct for opening waiting area
-2 1.00
-1 1.20 2.73 -5.46 diduct for opening
2.73 -3.28 diduct for opening waiting area
-2 1.00
-2 1.40 2.73 -5.46 diduct for door 5
2.73 -7.64 diduct for door 1
-3 0.80
-6 0.90 2.73 -6.55 diduct for door 7
2.73 -14.74 diduct for door 6
-5 0.70
-2 0.90 2.73 -9.56 diduct for door 8
2.73 -4.91 diduct for door 9
-1 1.20
0.06 -0.07 diduct for window 9
130.56 m2 Total

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
2. BLOCK WORK 2.2 15cm thick HCB Waiting
2.1 20cm thick HCB Waiting 1 4.85 Total length of partition wall= 4.85

3 3.90 2.73 13.24 Add For partition wall


2.73 31.94 Add for axis Y/01 , Y/03 & Y/04
-2 0.90
1 3.60 1.73 -3.11 diduct for window
2.73 9.83 Add for axis X/03 10.13 m2 sub Total

2 2.95 GRAND TOTAL FOR EMERGENCY & WAITING


2.75 16.23 Add for axis X/04
264.28 2.2 20cm thick HCB Emergency
1 2.95 #VALUE! 2.2 20cm thick HCB Waiting
1.10 3.25 Add for axis X/02 #VALUE! m2 Gande Total

1 3.40 130.56 2.2 15cm thick HCB Emergency


2.73 9.28 Add for axis X/02 10.13 2.2 15cm thick HCB Waiting
140.68 m2 Gande Total
2 4.00
1.10 8.80 Add for axis Y/01 & Y/04

\ 10.50 Add for axis Y/01- Y/04 Above TTB


0.25 ### F &R SIDE

1 9.60 Add for axis X/02 & X/04 Above


1.80 17.28 TTB Gable side

-2 0.80
2.73 -4.37 diduct for door 10

-1 0.90
2.73 -2.46 diduct for door 9

-1 1.00
1.73 -1.73 diduct for window 14

-1 1.15
1.73 -1.99 diduct for window 21

-1 1.50
1.73 -2.59 diduct for window 2
### m2 sub Total

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 22 44.10
projection 970.20
44.10
17.55 970.20 ml
773.96

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =37
Upper =37x2 =74

74 9.03 . 9.03 9.03


668.22
18.40
18.4
Lower =37x1= 37
37 9.20
340.40 8.78

1,008.62 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=2.00+2(1.88+1.60+1.45+1.23
+1.00+0.78+0.57+0.36+0.20)
37 20.14 =20.14ml
745.18
Diag=2(2.08+1.89+1.71+1.53+1.41
+1.19+1.06+0.97+0.91)
37 25.50 =25.50ml
943.50

1,688.68 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION 1.6 25cm thick hard core
A. Sub Structure 2 4.92
1. Excavation & Earth Work 5.02 49.40
1 24.90 1.1 Site clearing
15.00 373.50 1 4.92
373.50 m2 1.95 9.59
1.2 Trench excavation
4 23.40 in ordinary soil 2 4.85
0.80 5.02 48.69
0.90 67.39
1 4.85
5 11.50 1.95 9.46
0.80
0.90 41.40 2 7.00
108.79 m3 5.02 70.28

1 7.00
1.95 13.65

2 4.90
1.4 Fill borrowed materials 5.02 49.20
1 23.40 Including 0.25 working space
13.50 both sides 1 4.90
0.37 116.88 1.95 9.56
deduction masonary wall 210.63 m2
-4 22.90 2. Concrete work
0.40 4 23.00 2.1 50mm thick lean
0.37 (13.56) 0.50 46.00 concrete.

-5 11.40 5 11.10
0.40 0.50 27.75
0.37 (8.44) 73.75 m2
94.89 m3 Total
118.61 m3 add bulckaeg 25% 395.71m³ 2.3 10cm thick RC floor slab C-20
(23.72) deduction bulckeg 25 % Ditto as item 1.6
94.89 m3 210.63 m2
1.5 Cart away excavated
materials
1 373.50
0.30 112.05 Item No 1.1
108.79 Item No 1.2
220.84 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION
2.3 In gread beam 3. Masonary Work
4 22.90 3.1 Stone masonarry work
0.40 4 22.90 Foundation wall BNGL
0.25 9.16 0.40
0.75 27.48
5 12.00
0.40 5 11.40
0.25 6.00 0.40
15.16 m3 0.75 17.10
44.58 m3
2.7 Form work to grade beam
2 22.90 3.2 ditto but above N.G external
0.40 18.32 left pointed

6 21.65 4 22.90
0.40 51.96 0.40
0.10 3.66
2 13.00
0.40 10.40 5 11.40
0.40
8 12.00 0.10 2.28
0.40 38.40 5.94 m3
119.08 m2
Reinforcement bar
2.11 2.6 Dia. 14mm deformation bar

1,213.15 kg
2.12 2.7 Dia. 12mm deformation bar

- kg
2.13 2.8 Dia. 8mm deformation bar

2,737.24 kg

2.14 10/2cm chip wood expansion joint


6 21.90 131.40

8 12.20 97.60
229.00 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION Reinforcement bar
A. Super Structure 1.8 Dia. 12mm deformation bar
1. Concrete work 1,345.07 kg
20 2.73 1.1 In elevaation Column
0.20 1.9 Dia. 8mm deformation bar
0.20 2.18 374.62 kg
2.18 m3 2.1. 20CM THICK HCB
1.2 In beams 2 21.90
4 22.90 2.73 119.57 for axis x/01 & x/04
0.30
0.20 5.50 2 12.20
2.73 66.61 Add for axis y/01 & y/05
5 12.20
0.30 2 22.9 Add for axis X/01 & X/04 Above TTB
0.20 3.66 0.25 11.45 F &R SIDE
9.16 m3
FORM WORK TO 1 13.00 Add for axis Y/01 & Y/05 Above
40 2.73 1.3 Elevation column 1.80 23.40 TTB Gable side
0.25 27.30
24*2=48 -1 1.20
40 2.73 2.73 -3.28 Diducte for door 13
0.20 21.84
49.14 m2 -16 1.50
1.73 -41.52 Diducte for window 2
2 22.90 1.4 In beams
0.30 13.74 axis x01& x04 external side -2 1.20
0.60 -1.44 Diducte for window 20
6 11.90
0.30 21.42 axis x01 - x04 internal side -3 1.60
1.73 -8.30 Diducte for window 1
6 11.90 166.50 m2 TOTAL
0.25 17.85 axis x01 - x04 internal sofft side 2.2 15cm thick HCB
2 27.90
2 13.00 axis Y01&Y05 external side 2.73 152.33 For axis x/02 & x/03
0.30 7.80
1 39.35
8 12.20 axis Y01 to Y05 internal side 2.73 107.43 Add for short side
0.30 29.28
-5 1.40
8 12.20 axis Y01 to Y05 internal sofft side 2.73 -19.11 Diduct for door 2
0.25 24.40
114.49 m2 -2 0.90
2.73 -4.91 Diduct for door 9
283.78 m2 TOTAL

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 24.10
projection 433.80
24.10
14.20 433.80 ml
342.22

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =20
Upper =20x2 =40

40 7.28 . 7.28 7.28


291.20
14.20

Lower =20x1= 20
20 14.20
284.00

575.20 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=1.63+2(1.42+1.21+1.00+0.80
+0.60+0.39+0.18)
20 12.83 =12.83ml
256.60
Diag=2(1.68+1.51+1.35+1.21+1.08
+0.98+0.92)
20 17.46 =17.46ml
349.20

605.80 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
A. Sub Structure 1.6 25cm thick hard core
1. Excavation & Earth Work 1 4.07
1 24.95 1.1 Site clearing 5.72 23.28
15.35 382.98
382.98 m2 1 4.07
1.2 Trench excavation 5.87 23.89
3 22.45 in ordinary soil
0.90 2 4.15
0.30 18.18 5.72 47.48

6 0.15 2 4.15
0.90 5.87 48.72
0.30 0.24
1 2.45
1 22.45 Bulk excavation 5.72 14.01
12.85
0.25 72.12 1 7.00
90.55 m3 1.95 13.65

1.4 Fill borrowed materials 1 2.45


1 22.45 Including 0.25 working space 5.87 14.38
12.85 both sides
0.50 144.24 1 5.72
deduction masonary wall 5.72 32.72
-3 22.90
0.40 1 5.72
0.50 (13.74) 5.87 33.58

-6 11.15 251.71 m2
0.40
0.50 (13.38) 2. Concrete work
117.12 m3 Total 3 21.95 2.1 50mm thick lean
146.40 m3 add bulckaeg 25% 395.71m³ 0.50 32.93 concrete.
(29.28) deduction bulckeg 25%
117.12 m3 Total 6 10.85
1.5 Cart away excavated 0.50 32.55
materials 65.48 m2
1 382.98
0.30 114.89 Item No 1.1 2.3 10cm thick RC floor slab C-20
90.55 Item No 1.2 Ditto as item 1.6
205.44 m3 251.71 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
2.4 In gread beam 3. Masonary Work
3 21.95 3.1 Stone masonarry work
0.40 3 21.95 Foundation wall BNGL
0.25 6.58 0.40
0.75 19.76
6 11.60
0.40 6 11.15
0.25 6.96 0.40
13.54 m3 0.75 20.07
2.7 Form work to grade beam 39.83 m3
2 21.95
0.40 17.56 3.2 ditto but above N.G external
left pointed
4 20.45
0.40 32.72 3 21.95
0.40
2 12.35 0.30 7.90
0.40 9.88
6 11.15
10 11.60 0.40
0.40 46.40 0.30 8.03
106.56 m2 15.93 m3
Reinforcement bar
2.11 Dia. 14mm deformation bar

988.38 kg
2.12 Dia. 12mm deformation bar

- kg
2.13 Dia. 8mm deformation bar

2,700.27 kg

2.14 10/2cm chip wood expansion joint


4 20.45 81.80

10 11.60 116.00
197.80 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
A. Super Structure Reinforcement bar
1. Concrete work 1.8 Dia. 12mm deformation bar
18 2.73 1.1 In elevaation Column 1,078.41 kg
0.20
0.20 1.97 1.9 Dia. 8mm deformation bar
1.97 m3
3 21.95 1.2 In beams 314.97 kg
0.30
0.20 3.95

6 11.75
0.30
0.20 4.23
8.18 m3
FORM WORK TO
1.3 Elevation column
36 2.73
0.25 24.57 18*2=36

36 2.73
0.20 19.66
44.23 m2
1.4 In beams
2 21.95 axis x01& x03 external side
0.30 13.17

4 20.75 axis x01 - x03 internal side


0.30 24.90

4 21.75 axis x01 - x03 internal sofft side


0.25 21.75

2 12.35 axis Y01&Y06 external side


0.30 7.41

10 11.75 axis Y01 to Y06 internal side


0.30 35.25

10 11.75 axis Y01 to Y06 internal sofft side


0.25 29.38
131.86 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
2.2 15cm thick HCB
2.1. 20CM THICK HCB 1 106.28 Total length of partition wall= 106.28

2 20.75 2.73 290.14 Add For partition wall


2.73 113.30 for axis x/01 & x/03
-9 0.90
1 11.75 2.73 -22.11 Diduct for door 7
2.73 32.08 Add for axis y/01
-12 0.70
1 5.95 2.73 -22.93 Diduct for door 8
2.75 16.36 Add for axis y/06
-1 1.20
2 21.95 Add for axis X/01 & X/04 Above TTB 0.60 -0.72 Diducte for window 20
0.25 10.98 F &R SIDE 291.68 m2 TOTAL

1 12.35 Add for axis Y/01 & Y/05 Above


1.80 22.23 TTB Gable side

-2 2.50
2.73 -13.65 Diducte for X/01 & X/03 opening

-6 1.50
1.73 -15.57 Diducte for window 2

-1 1.05
1.73 -1.82 Diducte for window 13

-4 1.20
0.60 -2.88 Diducte for window 26

-1 4.15
0.60 -2.49 Diducte for window 14
158.53 m2 TOTAL

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 23.15
projection 416.70
23.15
13.55 416.70 ml
313.68

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =19
Upper =19x2 =38

38 6.95 . 6.95 6.95


264.10
13.55

Lower =19x1= 20
19 13.55
257.45

521.55 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=1.50+2(1.30+1.10+0.90+0.70
+0.50+0.31)
19 11.12 =11.12ml
211.28
Diag=2(1.58+1.42+1.28+1.14+1.00
+0.95)
19 14.74 =14.74ml
280.06

491.34 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GENERATOR HOUSE 1.6 25cm thick hard core
A. Sub Structure 1 4.92
1. Excavation & Earth Work 3.47 17.07
1 7.40 1.1 Site clearing
5.95 44.03 17.07 m2
44.03 m2
1.2 Trench excavation 2. Concrete work
2 5.90 in ordinary soil 2 5.45 2.1 50mm thick lean
0.90 0.50 5.45 concrete.
0.30 3.19
2 2.95
2 3.45 0.50 2.95
0.90 8.40 m2
0.30 1.86
2.3 10cm thick RC floor slab C-20
5.05 m3 Ditto as item 1.6
17.07 m2
1.4 Fill borrowed materials
Including 0.25 working space 2.4 In gread beam
both sides 2 5.40
0.40
1 5.90 0.25 1.08
4.45
0.50 13.13 2 3.45
deduction masonary wall 0.40
-2 5.40 0.25 0.69
0.40 1.77 m3
0.50 (2.16)
2.7 Form work to grade beam
-2 3.15 2 5.40
0.40 0.40 4.32
0.50 (1.26)
9.71 m3 Total 2 4.90
0.40 3.92

1.5 Cart away excavated 2 3.95


materials 0.40 3.16
1 44.03
0.30 13.21 Item No 1.1 2 3.45
Item No 1.2 0.40 2.76
13.21 m3 14.16 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GENERATOR HOUSE
Reinforcement bar A. Super Structure
2.11 2.6 Dia. 14mm deformation bar 1. Concrete work
4 2.73 1.1 In elevaation Column
538.69 kg 0.20
2.12 2.7 Dia. 12mm deformation bar 0.20 0.44
0.44 m3
- kg
2.13 2.8 Dia. 8mm deformation bar 1.2 In beams
2 5.40
41.71 kg 0.30
0.20 0.65
2.13 10/2cm chip wood expansion joint
6 4.90 29.40 2 4.90
0.30
2 3.45 6.90 0.20 0.59
36.30 ml
1.24 m3
3. Masonary Work FORM WORK TO
3.1 Stone masonarry work 1.4 Elevation column
2 5.40 Foundation wall BNGL 8 2.73
0.40 0.25 5.46 4*2=8
0.75 3.24
8 2.73
2 4.60 0.20 4.37
0.40
0.75 2.76 9.83 m2
6.00 m3
1.5 In beams
3.2 ditto but above N.G external
left pointed 2 5.40 axis x01& x02 external side
0.30 3.24
2 5.40
0.40 2 5.00 axis x01 - x02 internal side
0.15 0.65 0.30 3.00

2 4.60 2 5.00 axis x01 - x02 internal sofft side


0.40 0.25 2.50
0.15 0.55
1.20 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GENERATOR HOUSE
2. BLOCK WORK
2 3.95 axis Y01&Y02 external side 2.1 . 20CM THICK HCB
0.30 2.37 2 4.80
2.73 26.21 Add for longer axis
2 3.55 axis Y01 to Y02 internal side
0.30 2.13 2 3.55
2.73 19.38 Add for shortter axis
2 3.55 axis Y01 to Y02 internal sofft side
0.25 1.78 2 5.20 Add for Axis Abave TTB
15.02 m2 0.25 2.60 F & R side

Reinforcement bar 1 3.95 Add for Axis Abave TTB


1.8 Dia. 12mm deformation bar 1.25 4.94 Gable side
157.25 kg
-1 1.50
1.9 Dia. 8mm deformation bar 2.73 -4.10 Diducte for door 3

47.48 kg -5 1.10
1.73 -9.52 Diducte for window 7 opening
39.52 m2 TOTAL

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT LOCATION - T.S. No - 04


CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GENERATOR HOUSE
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 8 6.20
projection 49.60
6.20
5.15 49.60 ml
31.93

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =5
Upper =5x2 =10

10 6.95 . 2.95 2.95


69.50
5.15

Lower =5x1=5
5 5.15
25.75

95.25 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=0.61+2(0.40+0.19 )

5 1.79 =1.79ml
8.95
Diag=2(0.99+0.92 )

5 3.82 =3.82ml
19.10

28.05 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN 1.6 25cm thick hard core
A. Sub Structure 2 5.82
1. Excavation & Earth Work 5.02 58.43
1 31.65 1.1 Site clearing
16.00 506.40 1 5.82
506.40 m2 1.92 11.17
1.2 Trench excavation
4 29.15 in ordinary soil 6 5.75
0.90 5.02 173.19
0.30 31.48
3 5.75
6 0.15 1.92 33.12
0.90
0.30 0.24 2 4.07
5.02 40.86
31.72 m3
1 4.07
1.4 Fill borrowed materials 1.92 7.81
Including 0.25 working space
both sides 324.59 m2

1 22.45 2. Concrete work


12.85 3 21.95 2.1 50mm thick lean
0.50 144.24 0.50 32.93 concrete.
deduction masonary wall
-3 22.90 6 10.85
0.40 0.50 32.55
0.50 (13.74) 65.48 m2

-6 11.15 2.3 10cm thick RC floor slab C-20


0.40 Ditto as item 1.6
0.50 (13.38) 324.59 m2
117.12 m3 Total
2.4 In gread beam
3 21.95
1.5 Cart away excavated 0.40
materials 0.25 6.58
1 506.40
0.30 151.92 Item No 1.1 6 11.60
Item No 1.2 0.40
151.92 m3 0.25 6.96
13.54 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN
2.7 Form work to grade beam 3. Masonary Work
2 21.95 3.1 Stone masonarry work
0.40 17.56 3 21.95 Foundation wall BNGL
0.40
4 20.45 0.85 22.39
0.40 32.72
6 11.15
2 12.35 0.40
0.40 9.88 0.85 22.75
45.14 m3
10 11.60
0.40 46.40 3.2 ditto but above N.G external
106.56 m2 left pointed

3 21.95
Reinforcement bar 0.40
2.11 2.6 Dia. 14mm deformation bar 0.30 7.90

1,505.58 kg 6 11.15
2.12 2.7 Dia. 12mm deformation bar 0.40
0.30 8.03
- kg 15.93 m3
2.13 2.8 Dia. 8mm deformation bar

2,021.25 kg

2.14 10/2cm chip wood expansion joint


6 27.15 162.90

10 12.00 120.00
282.90 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN 2. BLOCK WORK
A. Super Structure 4 27.45 2.1. 20cm thick HCB
1. Concrete work 2.73 299.75 Add for axis x/01- x/04
24 2.73 1.1 In elevaation Column
0.20 2 12.20
0.20 2.62 2.73 66.61 Add for axis Y/01 & Y/06
2.62 m3
1.2 In beams 11 5.10
4 28.65 2.73 153.15 Add for axis partition wall
0.30
0.20 6.88 2 28.65 Add for axis X/01 & X/04 Above TTB
0.25 14.33 F &R SIDE
6 11.80
0.30 1 13.00 Add for axis Y/01 & Y/06Above
0.20 4.25 1.80 23.40 TTB Gable side
11.12 m3
FORM WORK TO -4 1.30
1.4 Elevation column 2.73 -14.20 diduct for door 3
48 2.73
0.25 32.76 24*2=48 -2 1.40
2.73 -7.64 diduct for door 2
48 2.73
0.20 26.21 -1 0.90
58.97 m2 2.73 -2.46 diduct for door 6
1.5 In beams
2 28.65 axis x01& x04 external side -6 0.85
0.30 17.19 2.73 -13.92 diduct for door 9

6 27.45 axis x01 - x04 internal side -2 1.30


0.30 49.41 2.73 -7.10 diduct for door 11

4 27.45 axis x01 - x04 internal sofft side -4 0.80


0.25 27.45 2.73 -8.74 diduct for door 7

2 13.00 axis Y01&Y06 external side -12 1.50


0.30 7.80 1.73 -31.14 diduct for Window 2

10 12.20 axis Y01 to Y06 internal side -4 1.30


0.30 36.60 1.73 -9.00 diduct for Window 4

6 12.20 axis Y01 to Y06 internal sofft side -2 1.3


0.25 18.30 0.06 -0.16 diduct for Window 15
156.75 m2 462.90 m2 Total
2.2. 15cm thick HCB wall
Reinforcement bar 1 6.50
1.8 Dia. 12mm deformation bar 2.73 17.75 Add for toilet partion wall
1,635.66 kg
1.9 Dia. 8mm deformation bar -4 0.70
429.21 kg 2.73 -7.64 diduct for door 8
10.10 m2 Total

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 29.85
projection 537.30
29.85
14.20 537.30 ml
423.87

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =25
Upper =25x2 =50

50 7.28 . 7.28 7.28


364.00
14.20

Lower =25x1= 25
25 14.20
355.00

719.00 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=1.63+2(1.42+1.21+1.00+0.80
+0.60+0.39+0.18)
25 12.83 =12.83ml
320.75
Diag=2(1.68+1.51+1.35+1.21+1.08
+0.98+0.92)
25 17.46 =17.46ml
436.50

757.25 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE 1.6 25cm thick hard core
A. Sub Structure 1 4.90
1. Excavation & Earth Work 2.10 10.29
1 7.40 1.1 Site clearing
4.90 36.26 10.29 m2
36.26 m2
1.2 Trench excavation 2. Concrete work
2 5.90 in ordinary soil 2 5.45 2.1 50mm thick lean
0.90 0.50 5.45 concrete.
0.30 3.19
2 1.95
2 1.90 0.50 1.95
0.90 7.40 m2
0.30 1.03
2.3 10cm thick RC floor slab C-20
4.21 m3 Ditto as item 1.6
10.29 m2
1.4 Fill borrowed materials
Including 0.25 working space 2.4 In gread beam
both sides 2 5.40
0.40
1 5.90 0.25 1.08
3.40
0.50 10.03 2 2.40
deduction masonary wall 0.40
-2 5.40 0.25 0.48
0.40 1.56 m3
0.50 (2.16)
2.7 Form work to grade beam
-2 2.10 2 5.40
0.40 0.40 4.32
0.50 (0.84)
7.03 m3 Total 2 4.90
0.40 3.92

1.5 Cart away excavated 2 2.90


materials 0.40 2.32
1 36.26
0.30 10.88 Item No 1.1 2 2.40
Item No 1.2 0.40 1.92
10.88 m3 12.48 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE
Reinforcement bar A. Super Structure
2.11 2.6 Dia. 14mm deformation bar 1. Concrete work
4 2.73 1.1 In elevaation Column
545.95 kg 0.20
2.12 2.7 Dia. 12mm deformation bar 0.20 0.44
0.44 m3
- kg
2.13 2.8 Dia. 8mm deformation bar 1.2 In beams
2 5.40
110.92 kg 0.30
0.20 0.65
2.13 10/2cm chip wood expansion joint
2 4.90 9.80 2 2.50
0.30
2 2.40 4.80 0.20 0.30
14.60 ml
0.95 m3
3. Masonary Work FORM WORK TO
3.1 Stone masonarry work 1.4 Elevation column
2 5.40 Foundation wall BNGL 8 2.73
0.40 0.25 5.46 4*2=8
0.85 3.67
8 2.73
2 2.10 0.20 4.37
0.40
0.85 1.43 9.83 m2
5.10 m3
1.5 In beams
3.2 ditto but above N.G external
left pointed 2 5.40 axis x01& x02 external side
0.30 3.24
2 5.40
0.40 2 5.00 axis x01 - x02 internal side
0.30 1.30 0.30 3.00

2 2.10 2 5.00 axis x01 - x02 internal sofft side


0.40 0.25 2.50
0.30 0.50
1.80 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE
2. BLOCK WORK
2 2.90 axis Y01&Y02 external side 2.1 . 20CM THICK HCB
0.30 1.74 2 5.60
2.73 30.58 Add for longer axis
2 2.50 axis Y01 to Y02 internal side
0.30 1.50 4 3.10
2.73 33.85 Add for shortter axis
2 2.50 axis Y01 to Y02 internal sofft side
0.25 1.25 1 6.00 Add for Axis Abave TTB
13.23 m2 0.25 1.50 Front side

Reinforcement bar 1 6.00 Add for Axis Abave TTB


1.8 Dia. 12mm deformation bar 1.20 7.20 Rear side
151.39 kg
1 3.50 Add for Axis Abave TTB
1.9 Dia. 8mm deformation bar 1.20 4.20 Gable side

46.77 kg -1 0.90
2.73 -2.46 Diducte for door

-2 0.70
2.73 -3.82 Diducte for door MD10

-1 0.90
1.73 -1.56 Diducte for window
69.49 m2 TOTAL

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 8 6.20
projection 49.60
6.20
5.15 49.60 ml
31.93

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =5
Upper =5x2 =10

10 6.95 . 2.95 2.95


69.50
5.15

Lower =5x1=5
5 5.15
25.75

95.25 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=0.61+2(0.40+0.19 )

5 1.79 =1.79ml
8.95
Diag=2(0.99+0.92 )

5 3.82 =3.82ml
19.10

28.05 ml

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE 1.6 25cm thick hard core
A. Sub Structure 1 4.90
1. Excavation & Earth Work 2.10 10.29
1 7.40 1.1 Site clearing
4.90 36.26 10.29 m2
36.26 m2
1.2 Trench excavation 2. Concrete work
2 5.90 in ordinary soil 2 5.45 2.1 50mm thick lean
0.90 0.50 5.45 concrete.
0.30 3.19
2 1.95
2 1.90 0.50 1.95
0.90 7.40 m2
0.30 1.03
2.3 10cm thick RC floor slab C-20
4.21 m3 Ditto as item 1.6
10.29 m2
1.4 Fill borrowed materials
Including 0.25 working space 2.4 In gread beam
both sides 2 5.40
0.40
1 5.90 0.25 1.08
3.40
0.50 10.03 2 2.40
deduction masonary wall 0.40
-2 5.40 0.25 0.48
0.40 1.56 m3
0.50 (2.16)
2.7 Form work to grade beam
-2 2.10 2 5.40
0.40 0.40 4.32
0.50 (0.84)
7.03 m3 Total 2 4.90
0.40 3.92

1.5 Cart away excavated 2 2.90


materials 0.40 2.32
1 36.26
0.30 10.88 Item No 1.1 2 2.40
Item No 1.2 0.40 1.92
10.88 m3 12.48 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE
Reinforcement bar A. Super Structure
2.11 2.6 Dia. 14mm deformation bar 1. Concrete work
4 2.73 1.1 In elevaation Column
423.98 kg 0.20
2.12 2.7 Dia. 12mm deformation bar 0.20 0.44
0.44 m3
- kg
2.13 2.8 Dia. 8mm deformation bar 1.2 In beams
2 5.40
110.92 kg 0.30
0.20 0.65
2.13 10/2cm chip wood expansion joint
2 4.90 9.80 2 2.50
0.30
2 2.40 4.80 0.20 0.30
14.60 ml
0.95 m3
3. Masonary Work FORM WORK TO
3.1 Stone masonarry work 1.4 Elevation column
2 5.40 Foundation wall BNGL 8 2.73
0.40 0.25 5.46 4*2=8
0.75 3.24
8 2.73
2 2.10 0.20 4.37
0.40
0.75 1.26 9.83 m2
4.50 m3
1.5 In beams
3.2 ditto but above N.G external
left pointed 2 5.40 axis x01& x02 external side
0.30 3.24
2 5.40
0.40 2 5.00 axis x01 - x02 internal side
0.10 0.43 0.30 3.00

2 2.10 2 5.00 axis x01 - x02 internal sofft side


0.40 0.25 2.50
0.10 0.17
0.60 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE
2. BLOCK WORK
2 2.90 axis Y01&Y02 external side 2.1 . 20CM THICK HCB
0.30 1.74 2 4.80
2.73 26.21 Add for longer axis
2 2.50 axis Y01 to Y02 internal side
0.30 1.50 2 2.30
2.73 12.56 Add for shortter axis
2 2.50 axis Y01 to Y02 internal sofft side
0.25 1.25 2 5.20 Add for Axis Abave TTB
13.23 m2 0.25 2.60 F & R side

Reinforcement bar 1 2.70 Add for Axis Abave TTB


1.8 Dia. 12mm deformation bar 1.25 3.38 Gable side
147.12 kg
-1 0.90
1.9 Dia. 8mm deformation bar 2.73 -2.46 Diducte for door 1

43.92 kg -4 1.10
1.73 -7.61 Diducte for window 2 opening
34.67 m2 TOTAL

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 6 6.20
projection 37.20
6.20
3.90 37.20 ml
24.18

4 Carpentry & Joinery


4.1 Upper & lower chord dia. 10 - 12 cm
No of Truss =5
Upper =5x2 =10

10 2.00 . 2.00 2.00


20.00
3.90

Lower =5x1=5
5 5.15
25.75

45.75 ml

4.2 Vertical & Diagonal dia. 8 - 10 cm

Ver.=0.45+2(0.23)

5 0.91 =0.91ml
4.55
Diag=2(0.93 )

5 1.86 =1.86ml
9.30

13.85 ml

Contractor ……………………… Supervisor…………………………..


Project Primary hospital Page No……………..
Location Block IPD
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
G.Beam 14 11.45 3.00 5.00 15.00 171.75
for long axis 14 10.90 3.00 5.00 15.00 163.50
on axis x/01,x/02, 14 9.70 3.00 5.00 15.00 145.50
x/03,x/04,x/05 14 9.03 3.00 5.00 15.00 135.45
14 7.05 3.00 5.00 15.00 105.75
14 11.05 3.00 5.00 15.00 165.75
14 9.65 3.00 5.00 15.00 144.75
14 9.97 3.00 5.00 15.00 149.55
Stirrup 8 1.20 30 25.00 750.00 900.00
8 1.20 13 5.00 65.00 78.00
8 1.20 24 5.00 120.00 144.00
G.Beam 14 8.18 3.00 8.00 24.00 196.32
for short axis 14 9.53 3.00 8.00 24.00 228.72
on axis y/01/y/02, 14 9.38 3.00 8.00 24.00 225.12
y/03,y04,y/05,y/06 14 8.63 3.00 8.00 24.00 207.12
y/07,y/08
Stirrup 8 1.20 30.00 8.00 240.00 288.00
8 1.20 13.00 16.00 208.00 249.60
8 1.20 37.00 8.00 296.00 355.20
Total Length(m) 900.00 2,039.28
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47
TotalWeight(Kg) 355.50 2,467.53

Contractor _______________________________ Supervisor__________________________


Page No……………..

Project -
Location - Block IPD
Bar SUB STRUCTURE Steel Reinforcement
Diamet Schedule
Length of № of Total№
No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slaby/01&y/02,
b/n for axis b/ny/04
x/01&& x/02
y/05 and 8 5.95 31.00 3.00 93.00 553.35
y/06 & y/07 8 5.80 30.00 3.00 90.00 522.00
B/n y/02 & y/03, 8 2.40 13.00 1.00 13.00 31.20
8 5.80 30.00 1.00 30.00 174.00
b/n y/03 & y/04 8 5.85 30.00 2.00 60.00 351.00
and y/05& y/06 8 5.80 30.00 2.00 60.00 348.00
b/n y/07 & y/08 8 4.60 24.00 1.00 24.00 110.40
8 5.80 30.00 1.00 30.00 174.00
Slaby/01&y/02,
b/n for axis b/ny/04
x/02&& x/03 , x/04 & x/05,
y/05 and 8 5.95 31.00 6.00 186.00 1,106.7
y/06 & y/07 8 2.45 13.00 6.00 78.00 191.10
B/n y/02 & y/03, 8 2.40 13.00 2.00 26.00 62.40
8 2.45 13.00 2.00 26.00 63.70
b/n y/03 & y/04 8 5.85 30.00 4.00 120.00 702.00
and y/05& y/06 8 2.45 13.00 4.00 52.00 127.40
b/n y/07 & y/08 8 4.60 24.00 2.00 48.00 220.80
8 2.45 13.00 2.00 26.00 63.70
Slaby/01&y/02,
b/n for axis b/ny/04
x/03&& x/04
y/05 and 8 5.95 31.00 3.00 93.00 553.35
y/06 & y/07 8 7.15 37.00 3.00 111.00 793.65
B/n y/02 & y/03, 8 2.40 13.00 1.00 13.00 31.20
8 7.15 37.00 1.00 37.00 264.55
b/n y/03 & y/04 8 5.85 30.00 2.00 60.00 351.00
and y/05& y/06 8 7.15 37.00 2.00 74.00 529.10
b/n y/07 & y/08 8 4.60 24.00 1.00 24.00 110.40
8 7.15 37.00 1.00 37.00 264.55
Total Length(m) 7699.55
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58
TotalWeight(Kg) 3041.32 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block IPD
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 40 160 588.8

Elev. Col. stirrup 8 0.70 14 40 560 392

T.T.Beam Top 12 11.35 5.00 4.00 20.00 227.00

for long axis on 12 10.90 5.00 4.00 20.00 218.00

axis x/01 to x/05 12 9.70 5.00 4.00 20.00 194.00

12 8.93 5.00 4.00 20.00 178.60

T.T.Beam Bottom 12 7.05 5.00 3.00 15.00 105.75

12 11.05 5.00 3.00 15.00 165.75

12 9.65 5.00 3.00 15.00 144.75

12 9.97 5.00 3.00 15.00 149.55

Stirrup 8 0.90 30.00 15.00 450 405.00

8 0.90 13.00 5.00 65 58.50

8 0.90 30.00 10.00 300 270.00

8 0.90 24.00 5.00 120 108.00

on axis y/01 to y/09 12 8.08 4.00 8.00 32 258.56

T.T. Beam 12 9.43 4.00 8.00 32 301.76

for short axis 12 9.33 3.00 8.00 24 223.92

12 8.63 3.00 8.00 24 207.12

Stirrup 8 0.90 30.00 8.00 240 216.00

8 0.90 13.00 16.00 208 187.20

8 0.90 37.00 8.00 296 266.40

Total Length(m) 1,903.10 2,963.56 - -


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 751.72 - 2,631.64 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block OPD
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
G.Beam 14 11.88 3.00 4.00 12.00 142.56
for long axis 14 10.60 3.00 4.00 12.00 127.20
striups on axis 14 7.98 3.00 4.00 12.00 95.76
x/01,x/04 14 7.17 3.00 4.00 12.00 86.04
striups on axis 14 10.10 3.00 4.00 12.00 121.20
x/02,x/03 14 10.60 3.00 4.00 12.00 127.20
14 7.98 3.00 4.00 12.00 95.76
14 9.20 3.00 4.00 12.00 110.40
Stirrup 8 1.20 19.00 4.00 76.00 91.20
8 1.20 25.00 20.00 500.00 600.00
8 1.20 30.00 4.00 120.00 144.00
G.Beam 14 11.95 3.00 8.00 24.00 286.80
for short axis 14 11.25 3.00 8.00 24.00 270.00

on axis y/01/y/02,
y/03,y04,y/05,y/06
y/07,y/08,y/09
Stirrup 8 1.20 21.00 16.00 336.00 403.20
8 1.20 13.00 8.00 104.00 124.80
Total Length(m) 1363.20 1,462.92
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47
TotalWeight(Kg) 538.46 1,770.13

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block OPD
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slab for axis b/n x/01 & x/02 ,x/03 & x/04
b/n y/01 to y/02 8 3.57 21.00 2.00 42.00 149.94
8 3.87 19.00 2.00 38.00 147.06
b/n y/02 & y/07 8 4.70 21.00 10.00 210.00 987.00
8 3.87 25.00 10.00 250.00 967.50
b/n y/07 & y/08 8 5.67 21.00 2.00 42.00 238.14
8 3.87 30.00 2.00 60.00 232.20
Slab for axis b/n x/02 & x/03
b/n y/01 to y/02 8 3.57 13.00 1.00 13.00 46.41
8 2.30 19.00 1.00 19.00 43.70
b/n y/02 & y/07 8 4.70 13.00 5.00 65.00 305.50
8 2.30 25.00 5.00 125.00 287.50
b/n y/07 & y/08 8 5.67 13.00 1.00 13.00 73.71
8 2.30 30.00 1.00 30.00 69.00

Total Length(m) 3547.66


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47
TotalWeight(Kg) 2540.11

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block OPD
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 32 128 471.04

Elev. Col. stirrup 8 0.70 14 32 448 313.6

T.T.Beam Top 12 11.78 3.00 4.00 12.00 141.36

for long axis on 12 10.60 3.00 4.00 12.00 127.20

axis x/01 to x/05 12 7.98 3.00 4.00 12.00 95.76

T.T.Beam Bottom 12 10.10 3.00 4.00 12.00 121.20

12 10.60 3.00 4.00 12.00 127.20

12 7.37 3.00 4.00 12.00 88.44

Stirrup 8 0.90 19.00 4.00 76 68.40

8 0.90 25.00 20.00 500 450.00

8 0.90 30.00 4.00 120 108.00

on axis y/01 to y/09 12 11.75 3.00 8.00 24 282.00

T.T. Beam 12 11.25 3.00 8.00 24 270.00

for short axis -

Stirrup 8 0.90 21.00 16.00 336.00 302.40

8 0.90 13.00 8.00 104.00 93.60

Total Length(m) 1,336.00 1,724.20 - -


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 527.72 - 1,531.09 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block STAFF RESIDENC
SUB STRUCTURE

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Staff Residence
G.Beam 14 11.23 3.00 2.00 6.00 67.38
for long axis 14 7.03 3.00 2.00 6.00 42.18
on axis x/01,x/02 14 8.53 3.00 2.00 6.00 51.18
14 8.53 3.00 2.00 6.00 51.18
Stirrup 8 1.20 22.00 8.00 176.00 211.20
G.Beam 14 6.85 3.00 5.00 15.00 102.75
for short axis 14 6.15 3.00 5.00 15.00 92.25
on axis y/01,y/02
y/03,y/04,y/05
Stirrup 8 1.20 30.00 5.00 150 180.00
Slab for axis b/n x/01 & x/02
b/n y/01 to y/05 8 3.95 29.00 4.00 116.00 458.20
8 5.65 21.00 4.00 84.00 474.60
Total Length(m) 1,324.00 406.92
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 522.98 492.37

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block STAFF RESIDENC
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 10 40 147.2

Elev. Col. stirrup 8 0.70 14 10 140 98

T.T.Beam Top 12 11.23 3.00 2.00 6.00 67.38

for long axis on 12 7.03 3.00 2.00 6.00 42.18

axis x/01 to x/05 12 8.58 3.00 2.00 6.00

12 8.58 3.00 2.00 6.00

Stirrup 8 0.90 21.00 8.00 168.00 151.20

T.T.Beam Bottom 12 6.85 3.00 5.00 15.00 102.75

12 6.15 3.00 5.00 15.00 92.25

Stirrup 8 0.90 30.00 5.00 150 135.00


Total Length(m) 384.20 451.76 - -
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 151.76 - 401.16 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block SERVIC Q.
SUB STRUCTURE

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Staff Residence
G.Beam 14 11.23 3.00 2.00 6.00 67.38
for long axis 14 7.03 3.00 2.00 6.00 42.18
on axis x/01,x/02 14 8.58 3.00 2.00 6.00 51.48
14 8.58 3.00 2.00 6.00 51.48
Stirrup 8 1.20 22.00 8.00 176.00 211.20
G.Beam 14 6.85 3.00 5.00 15.00 102.75
for short axis 14 6.15 3.00 5.00 15.00 92.25
on axis y/01,y/02
y/03,y/04,y/05
Stirrup 8 1.20 15.00 5.00 75 90.00
Slab for axis b/n x/01 & x/02
b/n y/01 to y/05 8 3.95 15.00 4.00 60.00 237.00
8 2.70 21.00 4.00 84.00 226.80
Total Length(m) 765.00 407.52
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 302.18 493.10

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block SERVIC Q.
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 10 40 147.2

Elev. Col. stirrup 8 0.70 14 10 140 98.00

T.T.Beam Top 12 11.23 3.00 2.00 6.00 67.38

for long axis on 12 7.03 3.00 2.00 6.00 42.18

axis x/01 to x/05 12 8.58 3.00 2.00 6.00 51.48

12 8.58 3.00 2.00 6.00 51.48

Stirrup 8 0.90 21.00 8.00 168.00 151.20

T.T.Beam Bottom 12 6.85 3.00 5.00 15.00 102.75

12 6.15 3.00 5.00 15.00 92.25

Stirrup 8 0.90 30.00 5.00 150 135.00


Total Length(m) 384.20 554.72 - -
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 151.76 - 492.59 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block OR
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
G.Beam 14 11.90 3.00 4.00 12.00 142.80
for long axis 14 11.75 3.00 4.00 12.00 141.00
on axis x/01,x/02 14 11.65 3.00 4.00 12.00 139.80
x/03,x/04 14 10.45 3.00 4.00 12.00 125.40
14 10.70 3.00 4.00 12.00 128.40
14 11.85 3.00 4.00 12.00 142.20
14 11.55 3.00 4.00 12.00 138.60
14 10.65 3.00 4.00 12.00 127.80

Stirrup 8 1.20 30.00 16.00 480.00 576.00

8 1.20 25.00 12.00 300.00 360.00

8 1.20 24.00 4.00 96.00 115.20


G.Beam 14 8.18 3.00 9.00 27.00 220.86
for short axis 14 9.53 3.00 9.00 27.00 257.31
on axis y/01,y/02 14 9.38 3.00 9.00 27.00 253.26
y/03,y/04,y/05,y/06 14 8.63 3.00 9.00 27.00 233.01
y/07,y/08,y/09
Stirrup 8 1.20 30 9.00 270.00 324.00
8 1.20 13 9.00 117.00 140.40
8 1.20 37 9.00 333.00 399.60
Total Length(m) 1915.20 2,050.44
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47
TotalWeight(Kg) 756.50 2,481.03

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block OR
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slab for axis b/n x/01 & x/02 ,x/03 & x/04
b/n y/01 to y/05 8 5.70 37.00 4.00 148.00 843.60
8 7.07 30.00 4.00 120.00 848.40
B/n y/05 & y/06, 8 4.70 37.00 2.00 74.00 347.80
8 7.07 25.00 2.00 50.00 353.50
b/n y/06 & y/07 8 4.85 37.00 2.00 74.00 358.90
8 7.07 25.00 2.00 50.00 353.50
b/n y/07 & y/08 8 4.80 37.00 2.00 74.00 355.20
8 7.07 25.00 2.00 50.00 353.50
b/n y/08 & y/09 8 4.37 37.00 2.00 74.00 323.38
8 7.07 23.00 2.00 46.00 325.22
Slab for axis b/n x/02 & x/03
b/n y/01 to y/05 8 5.70 13.00 4.00 52.00 296.40
8 2.40 30.00 4.00 120.00 288.00
B/n y/05 & y/06, 8 4.70 13.00 2.00 26.00 122.20
8 2.40 25.00 2.00 50.00 120.00
b/n y/06 & y/07 8 4.85 13.00 2.00 26.00 126.10
8 2.40 25.00 2.00 50.00 120.00
b/n y/07 & y/08 8 4.80 13.00 2.00 26.00 124.80
8 2.40 25.00 2.00 50.00 120.00
b/n y/08 & y/09 8 4.37 13.00 2.00 26.00 113.62
8 2.40 23.00 2.00 46.00 110.40

Total Length(m) 6004.52


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58
TotalWeight(Kg) 2371.79 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block OR
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 36 144 529.92

Elev. Col. stirrup 8 0.70 14 36 504 352.8

T.T.Beam Top 12 11.80 3.00 4.00 12.00 141.60

for long axis on 12 11.75 3.00 4.00 12.00 141.00

axis x/01 to x/04 12 11.65 3.00 4.00 12.00 139.80

12 10.35 3.00 4.00 12.00 124.20

T.T.Beam Bottom 12 10.70 3.00 4.00 12.00 128.40

12 11.85 3.00 4.00 12.00 142.20

12 11.55 3.00 4.00 12.00 138.60

12 10.55 3.00 4.00 12.00 126.60

Stirrup 8 0.90 23.00 8.00 184 165.60

8 0.90 30.00 12.00 360 324.00

8 0.90 25.00 4.00 100 90.00

8 0.90 26.00 8.00 208 187.20

on axis y/01 to y/09 12 8.08 3.00 10.00 30 242.40

12 9.43 3.00 10.00 30 282.90

T.T. Beam 12 9.38 3.00 10.00 30 281.40

for short axis 12 8.63 3.00 10.00 30 258.90

Stirrup 8 0.90 30.00 10.00 300 270.00

8 0.90 13.00 10.00 130 117.00

8 0.90 37.00 10.00 370 333.00

Total Length(m) 1,839.60 2,677.92 - -


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 726.64 - 2,377.99 -
Contractor _______________________________ Supervisor__________________________
Project - Page No……………..
Location - Block EMERGENCE
SUB STRUCTURE

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
G.Beam 14 11.95 3.00 4.00 12.00 143.40
for long axis 14 8.40 3.00 4.00 12.00 100.80
on axis x/01,x/02 14 4.95 3.00 4.00 12.00 59.40
x/03,x/04 14 11.35 3.00 4.00 12.00 136.20
14 7.50 3.00 4.00 12.00 90.00
14 6.70 3.00 4.00 12.00 80.40
Stirrup 8 1.20 30.00 4.00 120.00 144.00
8 1.20 24.00 4.00 96.00 115.20
8 1.20 21.00 4.00 84.00 100.80
8 1.20 22.00 4.00 88.00 105.60
8 1.20 19.00 4.00 76.00 91.20
G.Beam 14 6.13 3.00 6.00 18.00 110.34
for short axis 14 6.58 3.00 6.00 18.00 118.44
on axis y/01,y/02 14 11.40 3.00 6.00 18.00 205.20
y/03,y/04,y/05,y/06 - -
Stirrup 8 1.20 22.00 6.00 132.00 158.40
8 1.20 13.00 6.00 78.00 93.60
8 1.20 21.00 6.00 126.00 151.20
Total Length(m) 960.000 1,044.18
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 379.200 1,263.46

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block EMERGENCE
Bar SUB STRUCTURE Steel Reinforcement
Diamet Schedule
Length of № of Total№
No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slab for axis b/n x/01 & x/02
b/n y/01 to y/02 8 5.67 21.00 1.00 21.00 119.07
8 4.02 30.00 1.00 30.00 120.60
b/n y/02 t0 y/03 8 4.45 21.00 1.00 21.00 93.45
8 4.02 23.00 1.00 23.00 92.46
b/n y/03 to y/04 8 3.85 21.00 1.00 21.00 80.85
8 4.02 21.00 1.00 21.00 84.42
b/n y/04 to y/05 8 4.15 21.00 1.00 21.00 87.15
8 4.02 22.00 1.00 22.00 88.44
b/n y/05 to y/06 8 3.42 21.00 1.00 21.00 71.82
8 4.02 18.00 1.00 18.00 72.36
Slab for axis b/n x/02 & x/03
b/n y/01 to y/02 8 5.67 13.00 1.00 13.00 73.71
8 2.30 30.00 1.00 30.00 69.00
b/n y/02 t0 y/03 8 4.45 13.00 2.00 26.00 115.70
8 2.30 23.00 2.00 46.00 105.80
b/n y/03 to y/04 8 3.85 13.00 2.00 26.00 100.10
8 2.30 21.00 2.00 42.00 96.60
b/n y/04 to y/05 8 4.15 13.00 2.00 26.00 107.90
8 2.30 22.00 2.00 44.00 101.20
b/n y/05 to y/06 8 3.42 13.00 2.00 26.00 88.92
8 2.30 18.00 2.00 36.00 82.80
Slab for axis b/n x/03 & x/04
b/n y/01 to y/02 8 5.67 21.00 1.00 21.00 119.07
8 3.87 30.00 1.00 30.00 116.10
b/n y/02 t0 y/03 8 4.45 21.00 2.00 42.00 186.90
8 3.87 23.00 2.00 46.00 178.02
b/n y/03 to y/04 8 3.85 21.00 2.00 42.00 161.70
8 3.87 21.00 2.00 42.00 162.54
b/n y/04 to y/05 8 4.15 21.00 2.00 42.00 174.30
8 3.87 22.00 2.00 44.00 170.28
b/n y/05 to y/06 8 3.42 21.00 2.00 42.00 143.64
8 3.87 18.00 2.00 36.00 139.32
Total Length(m) 3404.22
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58
TotalWeight(Kg) 1344.667

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block EMERGENCE
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 24 96 353.28

Elev. Col. stirrup 8 0.70 15 24 360 252

T.T.Beam Top 12 11.85 4.00 4.00 16.00 189.60

for long axis on 12 8.40 3.00 4.00 12.00 100.80

axis x/01 to x/05 12 4.85 3.00 4.00 12.00 58.20

T.T.Beam Bottom 12 11.35 3.00 4.00 12.00 136.20

12 7.50 3.00 4.00 12.00 90.00

12 6.70 3.00 4.00 12.00 80.40

Stirrup 8 0.90 35.00 4.00 140 126.00

8 0.90 24.00 4.00 96 86.40

8 0.90 21.00 4.00 84 75.60

8 0.90 22.00 4.00 88 79.20

8 0.90 19.00 4.00 76 68.40

on axis y/01 to y/09 12 11.8 3.00 6.00 18 212.40

T.T. Beam 12 11.40 3.00 6.00 18 205.20

for short axis -

Stirrup 8 0.90 22.00 6.00 132.00 118.80

8 0.90 13.00 6.00 78.00 70.20


8 0.90 21.00 6.00 126.00 113.40
Total Length(m) 990.00 1,426.08 - -
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 391.05 - 1,266.36 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block Waiting
SUB STRUCTURE

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
G.Beam 14 11.20 3.00 4.00 12.00 134.40
for long axis 14 10.65 3.00 4.00 12.00 127.80
on axis x/01,x/02 -
x/03,x/04 -
Stirrup 8 1.20 52.50 4.00 210.00 252.00
G.Beam 14 10.35 3.00 5.00 15.00 155.25
for short axis 14 9.80 3.00 5.00 15.00 147.00
on axis y/01,y/02 -
y/03,y/04,y/05,y/06 - -
Stirrup 8 1.20 48.00 5.00 240.00 288.00
Total Length(m) 540.000 564.45
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 213.30 682.98

Contractor _______________________________ Supervisor__________________________


Project Primary hospital Page No……………..
Location Block Waiting
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slab for axis b/n x/01 & x/02
b/n y/01 to y/02 8 5.67 21.00 1.00 21.00 119.07
8 4.02 30.00 1.00 30.00 120.60
b/n y/02 t0 y/03 8 4.45 21.00 1.00 21.00 93.45
8 4.02 23.00 1.00 23.00 92.46
b/n y/03 to y/04 8 3.85 21.00 1.00 21.00 80.85
8 4.02 21.00 1.00 21.00 84.42
b/n y/04 to y/05 8 4.15 21.00 1.00 21.00 87.15
8 4.02 22.00 1.00 22.00 88.44
b/n y/05 to y/06 8 3.42 21.00 1.00 21.00 71.82
8 4.02 18.00 1.00 18.00 72.36
Slab for axis b/n x/02 & x/03
b/n y/01 to y/02 8 5.67 13.00 1.00 13.00 73.71
8 2.30 30.00 1.00 30.00 69.00
b/n y/02 t0 y/03 8 4.45 13.00 2.00 26.00 115.70
Total Length(m) 1169.03
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58
TotalWeight(Kg) 461.767
Project Primary hospital Page No……………..
Location Block Waiting
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 24 96 353.28

Elev. Col. stirrup 8 0.70 14 24 336 235.2

T.T.Beam Top 12 11.85 4.00 4.00 16.00 189.60

for long axis on 12 8.40 3.00 4.00 12.00 100.80

axis x/01 to x/05 12 4.85 3.00 4.00 12.00 58.20

T.T.Beam Bottom 12 11.35 3.00 4.00 12.00 136.20

12 7.50 3.00 4.00 12.00 90.00

12 6.70 3.00 4.00 12.00 80.40

Stirrup 8 0.90 35.00 4.00 140 126.00

8 0.90 24.00 4.00 96 86.40

8 0.90 21.00 4.00 84 75.60

8 0.90 22.00 4.00 88 79.20

8 0.90 19.00 4.00 76 68.40

on axis y/01 to y/09 12 11.8 3.00 6.00 18 212.40

T.T. Beam 12 11.40 3.00 6.00 18 205.20

for short axis -

Stirrup 8 0.90 22.00 6.00 132.00 118.80

8 0.90 13.00 6.00 78.00 70.20


8 0.90 21.00 6.00 126.00 113.40
Total Length(m) 973.20 1,426.08 - -
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 384.41 - 1,266.36 -
Project - l Page No……………..
Location - Block ADMINSTRATION
SUB STRUCTURE
Total Length (m)
Bar Diamet Length of № of Total№
No Location Shape Of bar er Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

G.Beam 14 8.22 3.00 4.00 12.00 98.64

for long axis 14 7.38 3.00 4.00 12.00 88.56

on axis x/01,x/04 & 14 9.25 3.00 4.00 12.00 111.00

on axis x/02,x/03 14 11.70 3.00 4.00 12.00 140.40

14 11.85 3.00 4.00 12.00 142.20

Stirrup 8 1.20 26.00 12.00 312.00 374.40

8 1.20 36.00 4.00 144.00 172.80

G.Beam 14 7.16 3.00 5.00 15.00 107.40

for short axis 14 7.20 3.00 5.00 15.00 108.00

on axis y/01,y/05 14 7.91 3.00 5.00 15.00 118.65

on axis y/02,y03 & y/04 14 5.85 3.00 5.00 15.00 87.75

Stirrup 8 1.20 26.00 10.00 260 312.00

8 1.20 11.00 5.00 55 66.00

Total Length(m) 925.20 1,002.60


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 365.45 1,213.15

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block ADMINSTRATION
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slab for axis b/n x/01 & x/02 ,x/03 & x/04
b/n y/01 to y/05 8 5.70 37.00 4.00 148.00 843.60
8 7.07 30.00 4.00 120.00 848.40
B/n y/05 & y/06, 8 4.70 37.00 2.00 74.00 347.80
8 7.07 25.00 2.00 50.00 353.50
b/n y/06 & y/07 8 4.85 37.00 2.00 74.00 358.90
8 7.07 25.00 2.00 50.00 353.50
b/n y/07 & y/08 8 4.80 37.00 2.00 74.00 355.20
8 7.07 25.00 2.00 50.00 353.50
b/n y/08 & y/09 8 4.37 37.00 2.00 74.00 323.38
8 7.07 23.00 2.00 46.00 325.22
Slab for axis b/n x/02 & x/03
b/n y/01 to y/05 8 5.70 13.00 4.00 52.00 296.40
8 2.40 30.00 4.00 120.00 288.00
B/n y/05 & y/06, 8 4.70 13.00 2.00 26.00 122.20
8 2.40 25.00 2.00 50.00 120.00
b/n y/06 & y/07 8 4.85 13.00 2.00 26.00 126.10
8 2.40 25.00 2.00 50.00 120.00
b/n y/07 & y/08 8 4.80 13.00 2.00 26.00 124.80
8 2.40 25.00 2.00 50.00 120.00
b/n y/08 & y/09 8 4.37 13.00 2.00 26.00 113.62
8 2.40 23.00 2.00 46.00 110.40

Total Length(m) 6004.52


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58
TotalWeight(Kg) 2371.79

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block ADMINSTRATION
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 20 80 294.4

Elev. Col. stirrup 8 0.70 14 20 280 196

Top Tie Beam 12 8.12 3.00 4.00 12 97.44

for long axis on 12 13.03 4.00 4.00 16 208.48

axis x/01 to x/04 12 11.70 3.00 4.00 12 140.40

12 11.85 3.00 4.00 12 142.20

8 0.90 26.00 12.00 312 280.80

8 0.90 36.00 4.00 144 129.60

on axis y/01,y/02 & 12 7.08 3 10 30 212.40

on axis x/03,x/04 12 7.10 3 10 30 213.00

Top Tie Beam 12 7.91 3 5 15 118.65

for short axis 12 5.85 3 5 15 87.75

8 0.90 27.00 10.00 270 243.00

8 0.90 11.00 10.00 110 99.00

Total Length(m) 948.40 1,514.72 - -


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 374.62 - 1,345.07 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block DIGNOSTIC
SUB STRUCTURE
Total Length (m)
Bar Diamet Length of № of Total№
No Location Shape Of bar er Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
G.Beam 14 10.83 3.00 3.00 9.00 97.47
for long axis 14 10.83 3.00 3.00 9.00 97.47
on axis x/01,x/02 14 11.65 3.00 3.00 9.00 104.85
x/03 14 9.55 3.00 3.00 9.00 85.95
Stirrup 8 1.20 22.00 9.00 198.00 237.60
8 1.20 13.00 3.00 39.00 46.80
8 1.20 30.00 3.00 90.00 108.00
G.Beam 14 5.85 3.00 6.00 18.00 105.30
for short axis 14 7.05 3.00 6.00 18.00 126.90
on axis y/01,y/02 14 11.05 3.00 6.00 18.00 198.90
,/03,y/04,y/05
Stirrup 8 1.20 30.00 6.00 180.00 216.00
8 1.20 31.00 6.00 186.00 223.20

Total Length(m) 831.60 816.84


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 328.48 988.38

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block DIGNOSTIC
SUB STRUCTURE Steel Reinforcement Schedule

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slab for axis b/n x/01 & x/02 ,x/03 & x/04
b/n y/01 to y/05 8 5.70 37.00 4.00 148.00 843.60
8 7.07 30.00 4.00 120.00 848.40
B/n y/05 & y/06, 8 4.70 37.00 2.00 74.00 347.80
8 7.07 25.00 2.00 50.00 353.50
b/n y/06 & y/07 8 4.85 37.00 2.00 74.00 358.90
8 7.07 25.00 2.00 50.00 353.50
b/n y/07 & y/08 8 4.80 37.00 2.00 74.00 355.20
8 7.07 25.00 2.00 50.00 353.50
b/n y/08 & y/09 8 4.37 37.00 2.00 74.00 323.38
8 7.07 23.00 2.00 46.00 325.22
Slab for axis b/n x/02 & x/03

Total Length(m) 6004.52


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47
TotalWeight(Kg) 2371.79

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block DIGNOSTIC
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 18 72 264.96

Elev. Col. stirrup 8 0.70 14 18 252 176.4

Top Tie Beam 12 11.85 3.00 3.00 9 106.65

for long axis on 12 11.45 3.00 3.00 9 103.05

axis x/01 to x/03 12 11.65 3.00 3.00 9 104.85

12 11.20 3.00 3.00 9 100.80

Stirrup 8 0.90 22.00 9.00 198 178.20

8 0.90 14.00 3.00 42 37.80

8 0.90 30.00 3.00 90 81.00

on axis y/01,y/02 & 12 6.68 4.00 6.00 24 160.32

on axis x/03,x/04 12 6.95 4.00 6.00 24 166.80

Top Tie Beam 12 11.5 3.00 6.00 18 207.00

for short axis -

Stirrup 8 0.90 30.00 12.00 360 324.00

Total Length(m) 797.40 1,214.43 - -


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 314.97 - 1,078.41 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block GENARATOR
SUB STRUCTURE

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Staff Residence
G.Beam 14 6.05 3.00 2.00 6.00 36.30
for long axis 14 5.35 3.00 2.00 6.00 32.10
on axis x/01,x/02 -
Stirrup 8 1.20 26.00 2.00 52.00 62.40
G.Beam 14 4.40 3.00 2.00 6.00 26.40
for short axis 14 3.90 3.00 2.00 6.00 23.40
on axis y/01,y/02
Stirrup 8 1.20 18.00 2.00 36 43.20
Slab for axis b/n x/01 & x/02
b/n y/01 to y/05 8 4.55 18.00 2.00 36.00 163.80
8 3.40 24.00 2.00 48.00 163.20
Total Length(m) 105.60 445.20
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 41.71 538.69

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block GENARATOR
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 4 16 58.88

Elev. Col. stirrup 8 0.70 14 4 56 39.20

T.T.Beam Top 12 6.05 3.00 2.00 6.00 36.30

for long axis on 12 5.35 3.00 2.00 6.00 32.10

axis x/01 to x/02

Stirrup 8 0.90 26.00 2.00 52.00 46.80

T.T.Beam Bottom 12 4.40 3.00 2.00 6.00 26.40

12 3.90 3.00 2.00 6.00 23.40

Stirrup 8 0.90 19.00 2.00 38 34.20


Total Length(m) 120.20 177.08 - -
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 47.48 - 157.25 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block KITCHEN
SUB STRUCTURE Steel Reinforcement Schedule

Total Length (m)


Bar Length of № of Total№
No Location Shape Of bar Dia Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
G.Beam 14 9.88 3.00 4.00 12.00 118.56
for long axis 14 11.48 3.00 4.00 12.00 137.76
14 9.25 3.00 4.00 12.00 111.00
14 10.10 3.00 4.00 12.00 121.20
14 9.45 3.00 4.00 12.00 113.40
14 11.35 3.00 4.00 12.00 136.20
Stirrup 8 1.20 30.00 16.00 480.00 576.00
8 1.20 22.00 4.00 88.00 105.60
G.Beam 14 7.16 3.00 6.00 18.00 128.88
for short axis 14 7.20 3.00 6.00 18.00 129.60
14 7.91 3.00 6.00 18.00 142.38
14 5.85 3.00 6.00 18.00 105.30
Stirrup 8 1.20 27.00 16.00 432.00 518.40
8 1.20 11.00 6.00 66.00 79.20
Slab For axis b/n x/01 & x/02 and x/03 & x/04
slab b/n axis 8 5.85 31.00 2.00 62.00 362.70
y/01 & y/02 8 5.05 27.00 2.00 54.00 272.70
b/n y/02&y03 8 5.75 30.00 6.00 180.00 1,035.0
Y/03 & y/04 and
y/04&y/05 8 5.05 27.00 6.00 162.00 818.10
b/n y/05&y06 8 4.10 22.00 2.00 44.00 180.40
8 5.05 27.00 2.00 54.00 272.70
For axis b/n y/02 & Y/03
slab b/n axis 8 5.85 31.00 1.00 31.00 181.35
y/01 & y/02 8 1.95 11.00 1.00 11.00 21.45
b/n y/02&y03 8 5.75 30.00 3.00 90.00 517.50
Y/03 & y/04 and
y/04&y/05 8 1.95 11.00 3.00 33.00 64.35
b/n y/05&y06 8 4.10 22.00 1.00 22.00 90.20
8 1.95 11.00 1.00 11.00 21.45
Total Length(m) 5,117.1 1,244.28
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 2,021.25 1,505.58

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block KITCHEN
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 24 96 353.28

Elev. Col. stirrup 8 0.70 14 24 336 235.2

Top Tie Beam 12 9.78 4.00 4.00 16 156.48

for long axis on Top 12 11.48 4.00 4.00 16 183.68

axis x/01,02,03&04 12 9.12 4.00 4.00 16 145.92

Bottom 12 10.10 3.00 4.00 12 121.20

12 9.45 3.00 4.00 12 113.40

12 11.35 3.00 4.00 12 136.20

Stirrup 8 0.90 30.00 4.00 120 108.00

8 0.90 30.00 12.00 360 324.00

8 0.90 22.00 4.00 88 79.20

on axis y/01,02,03,04, 12 7.08 3 10 30 212.40

05 &06 12 7.10 3 10 30 213.00

Top Tie Beam 12 7.91 3 5 15 118.65

for short axis 12 5.85 3 5 15 87.75

Stirrup 8 0.90 26.00 12.00 312 280.80

8 0.90 11.00 6.00 66 59.40

Total Length(m) 1,086.60 1,841.96 - -


Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 429.21 - 1,635.66 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block GUARD HOUSE
SUB STRUCTURE

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Staff Residence
G.Beam 14 6.25 3.00 2.00 6.00 37.50
for long axis 14 5.95 3.00 2.00 6.00 35.70
on axis x/01,x/02 -
Stirrup 8 1.20 26.00 8.00 208.00 249.60
G.Beam 14 3.55 3.00 2.00 6.00 21.30
for short axis 14 2.85 3.00 2.00 6.00 17.10
on axis y/01,y/02
Stirrup 8 1.20 13.00 2.00 26 31.20
Slab for axis b/n x/01 & x/02
b/n y/01 to y/05 8 5.45 16.00 2.00 32.00 174.40
8 2.95 28.00 2.00 56.00 165.20
Total Length(m) 280.80 451.20
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 110.92 545.95

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block GUARD HOUSE
SUPER STRUCTURE
Total Length (m)
Bar Length of № of Total№
No Location Shape Of bar Dia. Bar № of bars member Bar Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark

Elev. column 12 3.68 4 4 16 58.88

Elev. Col. stirrup 8 0.70 14 4 56 39.20

T.T.Beam Top 12 6.25 3.00 2.00 6.00 37.50

for long axis on 12 5.95 3.00 2.00 6.00 35.70

axis x/01 to x/02

Stirrup 8 0.90 30.00 2.00 60.00 54.00

T.T.Beam Bottom 12 3.55 3.00 2.00 6.00 21.30

12 2.85 3.00 2.00 6.00 17.10

Stirrup 8 0.90 14.00 2.00 28 25.20


Total Length(m) 118.40 170.48 - -
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 46.77 - 151.39 -

Contractor _______________________________ Supervisor__________________________


Project - Page No……………..
Location - Block MORUGU
SUB STRUCTURE

Bar Diamet Length of № of Total№


No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Staff Residence
G.Beam 14 6.05 3.00 2.00 6.00 36.30
for long axis 14 5.35 3.00 2.00 6.00 32.10
on axis x/01,x/02 -
Stirrup 8 1.20 26.00 8.00 208.00 249.60
G.Beam 14 3.55 3.00 2.00 6.00 21.30
for short axis 14 2.85 3.00 2.00 6.00 17.10
on axis y/01,y/02
Stirrup 8 1.20 13.00 2.00 26 31.20
Slab for axis b/n x/01 & x/02
b/n y/01 to y/05 8 4.85 13.00 2.00 26.00 126.10
8 2.35 25.00 2.00 50.00 117.50
Total Length(m) 280.80 350.40
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.580
TotalWeight(Kg) 110.92 423.98

Contractor _______________________________ Supervisor__________________________


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-1 IPD 2. Concrete work
A. Sub Structure 5 38.60 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 96.50 concrete.
41.50 1.1 Site clearing
21.55 894.33 8 14.45
0.50 57.80
894.33 m2 154.30 m2
1.2 Trench excavation 2.4 In gread beam
5 39.00 in ordinary soil 5 38.50
0.90 0.40
0.30 52.65 0.25 19.25
8 14.55
0.90 8 15.35
0.30 31.43 0.40
0.25 12.28
1 39.00 Bulk excavation 31.53 m3
19.05 2.7 Form work to grade beam
0.30 222.89 2 38.50
306.96 m3 0.40 30.80

1.4 Fill borrowed materials 6 34.50


1 39.00 Including 0.25 working space 0.40 82.80
19.05 both sides
0.52 386.33 2 16.35
deduction masonary wall 0.40 13.08
-5 38.50
0.52 16 15.35
0.40 (40.04) 0.40 98.24
224.92 m2
-8 16.55 Reinforcement bar
0.52 2.11 Dia. 14mm deformation bar
0.40 (27.54)
318.75 m3 Total 2,467.53 kg
398.44 m3 add bulckaeg 25% 453.91m³ 2.12 Dia. 12mm deformation bar

1.5 Cart away excavated nill kg


materials 2.13 Dia. 8mm deformation bar
1 894.33
0.30 268.30 Item No 1.1 762.90 kg
306.96 Item No 1.2
575.26 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
IPD
3. Masonary Work
3.1 Stone masonarry work
5 38.00 Foundation wall BNGL
0.40
0.85 64.60

8 16.55
0.40
0.85 45.02
109.62 m3

3.2 ditto but above N.G external


left pointed

5 38.00
0.40
0.30 22.80

8 16.55
0.40
0.30 15.89
38.69 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD 2. Concrete work
A. Sub Structure 4 35.20 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 70.40 concrete.
1 35.60 1.1 Site clearing
14.20 505.52 8 9.30
0.50 37.20
505.52 m2 107.60 m2
2.4 In gread beam
4 35.10
1.2 Trench excavation 0.40
4 35.60 in ordinary soil 0.25 14.04
0.90
0.30 38.45 8 10.20
0.40
8 11.70 0.25 8.16
0.90 22.20 m3
0.30 25.27 2.7 Form work to grade beam
2 35.10
63.72 m3 0.40 28.08

1.4 Fill borrowed materials 6 33.10


1 35.60 Including 0.25 working space 0.40 79.44
11.70 both sides
0.50 208.26 2 11.20
deduction masonary wall 0.40 8.96
-4 35.10
0.50 14 10.20
0.40 (28.08) 0.40 57.12
173.60 m2
-8 8.00 Reinforcement bar
0.50 2.11 Dia. 14mm deformation bar
0.40 (12.80)
167.38 m3 Total 1,770.13 kg
209.22 m3 add bulckaeg 25% 318.75m³ 2.12 Dia. 12mm deformation bar

1.5 Cart away excavated kg


materials 2.13 Dia. 8mm deformation bar
1 505.52
0.30 151.66 Item No 1.1 444.60 kg
63.72 Item No 1.2
215.38 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
3. Masonary Work
3.1 Stone masonarry work
4 35.10 Foundation wall BNGL
0.40
0.85 47.74

8 9.60
0.40
0.85 26.11
73.85 m3

3.2 ditto but above N.G external


left pointed

4 35.10
0.40
0.30 16.85

8 9.60
0.40
0.30 9.22
26.06 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE 2. Concrete work
A. Sub Structure 2 17.00 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 17.00 concrete.
1 20.00 1.1 Site clearing
9.20 184.00 5 5.30
184.00 m2 0.50 13.25
1.2 Trench excavation 30.25 m2
2 17.50 in ordinary soil 2.3 In gread beam
0.90 2 17.00
0.90 28.35 0.40
0.25 3.40
5 4.80
0.90 5 5.70
0.90 19.44 0.40
0.25 2.85
1 20.00 Bulk excavation 6.25 m3
6.90 2.4 Form work to grade beam
0.20 27.60 2 17.00
75.39 m3 0.40 13.60

1.4 Fill borrowed materials 2 15.75


1 17.50 Including 0.25 working space 0.40 12.60
6.70 both sides
0.45 52.76 2 6.20
deduction masonary wall 0.40 4.96
-2 17.00
0.40 8 5.70
0.45 (6.12) 0.40 18.24
49.40 m2
-5 4.90 Reinforcement bar
0.40 2.6 Dia. 14mm deformation bar
0.45 (4.41)
42.23 m3 Total 361.88 kg
52.79 m3 add bulckaeg 25% 42.23m³ 2.6 Dia. 12mm deformation bar

1.5 Cart away excavated nill kg


materials 2.7 Dia. 8mm deformation bar
1 184.00
0.30 55.20 Item No 1.1 150.73 kg
75.39 Item No 1.2
130.59 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
3. Masonary Work
3.1 Stone masonarry work
2 17.00 Foundation wall BNGL
0.40
0.85 11.56

5 5.20
0.40
0.85 8.84
20.40 m3

3.2 ditto but above N.G external


left pointed

2 17.00
0.40
0.39 5.30

5 5.20
0.40
0.39 4.06
9.36 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER 2. Concrete work
A. Sub Structure 2 17.00 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 17.00 concrete.
1 20.00 1.1 Site clearing
6.90 138.00 5 2.90
138.00 m2 0.50 7.25
1.2 Trench excavation 24.25 m2
2 17.50 in ordinary soil 2.3 In gread beam
0.90 2 17.00
0.90 28.35 0.40
0.25 3.40
5 2.60
0.90 5 3.40
0.90 10.53 0.40
0.25 1.70
1 20.00 Bulk excavation 5.10 m3
6.90 2.4 Form work to grade beam
0.20 27.60 2 17.00
66.48 m3 0.40 13.60

1.4 Fill borrowed materials 2 15.75


1 17.50 Including 0.25 working space 0.40 12.60
4.40 both sides
0.45 34.65 2 3.90
deduction masonary wall 0.40 3.12
-2 17.00
0.40 8 3.40
0.45 (6.12) 0.40 10.88
40.20 m2
-5 4.90 Reinforcement bar
0.40 2.6 Dia. 14mm deformation bar
0.45 (4.41)
24.12 m3 Total 493.10 kg
30.15 m3 add bulckaeg 25% 24.12m³ 2.6 Dia. 12mm deformation bar

1.5 Cart away excavated kg


materials 2.7 Dia. 8mm deformation bar
1 138.00
0.30 41.40 Item No 1.1 115.18 kg
66.48 Item No 1.2
107.88 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER
3. Masonary Work
3.1 Stone masonarry work
2 17.00 Foundation wall BNGL
0.40
0.85 11.56

5 3.40
0.40
0.85 5.78
17.34 m3
3.2 ditto but above N.G external
left pointed

2 17.00
0.40
0.39 5.30

5 3.40
0.40
0.39 2.65
7.96 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR 2. Concrete work
A. Sub Structure 4 42.85 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 85.70 concrete.
1 45.85 1.1 Site clearing
19.35 887.20 9 14.35
887.20 m2 0.50 64.58
1.2 Trench excavation 150.28 m2
4 43.35 in ordinary soil 2.3 In gread beam
0.90 4 42.85
0.90 140.45 0.40
0.25 17.14
9 13.25
0.90 9 15.35
0.90 96.59 0.40
0.25 13.82
1 45.85 Bulk excavation 30.96 m3
19.35 2.6 Form work to grade beam
0.25 221.80 2 42.85
458.85 m3 0.40 34.28

1.4 Fill borrowed materials 6 40.60


1 43.35 Including 0.25 working space 0.40 97.44
16.85 both sides
0.65 474.79 2 16.35
deduction masonary wall 0.40 13.08
-4 42.85
0.40 16 15.35
0.65 (44.56) 0.40 98.24
243.04 m2
-9 14.75 Reinforcement bar
0.40 2.6 Dia. 14mm deformation bar
0.65 (34.52)
395.71 m3 Total 2,351.37 kg
494.64 m3 add bulckaeg 25% 395.71m³ 2.7 Dia. 12mm deformation bar

1.5 Cart away excavated nill kg


materials 2.8 Dia. 8mm deformation bar
1 887.20
0.30 266.16 Item No 1.1 759.35 kg
458.85 Item No 1.2
725.01 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
3. Masonary Work
3.1 Stone masonarry work
4 42.85 Foundation wall BNGL
0.40
0.85 58.28

9 14.75
0.40
0.85 45.14
103.41 m3

3.2 ditto but above N.G external


left pointed

4 42.85
0.40
0.32 21.94

9 14.75
0.40
0.32 16.99
38.93 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
A. Sub Structure 1 10.75
1. Excavation & Earth Work 10.10
1 26.30 1.1 Site clearing 0.60 65.15
14.35 377.41 deduction masonary wall
-4 23.30
1 12.00 0.40 Emergency
12.60 151.20 0.60 (22.37)
528.61 m2
-6 14.75 Emergency
1.2 Trench excavation 0.40
4 23.80 in ordinary soil 0.60 (21.24)
0.90 Emergency
0.30 25.70 -3 10.50
0.40 Waiting
6 8.25 Emergency 0.60 (7.56)
0.90
0.30 13.37 -3 8.40 Waiting
0.40
1 23.80 Bulk excavation Emergency 0.60 (6.05)
11.85 177.15 m3 Total
0.25 70.51 221.43 m3 add bulckaeg 25% 125.61m³

3 10.75 Waiting 1.5 Cart away excavated


0.90 materials
0.30 8.71 1 528.61
0.30 158.58 Item No 1.1
3 10.10 Waiting 153.61 Item No 1.2
0.90 312.19 m3
0.30 8.18 2. Concrete work
4 23.30 2.1 50mm thick lean
1 10.75 Bulk excavation Waiting 0.50 46.60 concrete.
10.10
0.25 27.14 6 9.35
153.61 m3 0.50 28.05

1.4 Fill borrowed materials 3 10.60


1 23.80 Including 0.25 working space 0.50 15.90
11.85 both sides
0.60 169.22 3 8.10 `
0.50 12.15
102.70 m2

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
2.4 In gread beam 3 8.85
4 42.85 0.40 10.62
0.40 281.90 m2
0.25 17.14 Reinforcement bar
2.12 Dia. 14mm deformation bar
9 15.35 1,946.44 kg
0.40 2.13 Dia. 8mm deformation bar
0.25 13.82 590.84 kg
2.14 Dia. 12mm deformation bar
3 10.50 kg
0.40 3. Masonary Work
0.25 3.15 4 23.30 3.1 Stone masonarry work
0.40 Foundation wall BNGL
3 8.85 0.85 31.69
0.40 6 14.75
0.25 2.66 0.40
36.76 m3 0.85 30.09
3 10.60
2.8 Form work to grade beam 0.40
2 42.85 0.85 10.81
0.40 34.28 3 8.40
0.40
6 40.60 0.85 8.57
0.40 97.44 81.16 m3

2 16.35 3.2 ditto but above N.G external


0.40 13.08 4 23.30 left pointed
0.40
16 15.35 0.30 11.18
0.40 98.24 6 14.75
0.40
2 10.50 0.30 10.62
0.40 8.40 3 10.60
0.40
4 10.00 0.30 3.82
0.40 16.00 3 8.40
0.40
1 9.60 0.3 3.02
0.40 3.84 28.64 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION 2. Concrete work
A. Sub Structure 4 23.00 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 46.00 concrete.
1 25.90 1.1 Site clearing
18.00 466.20 5 11.10
466.20 m 2
0.50 27.75
1.2 Trench excavation 73.75 m2
4 23.40 in ordinary soil 2.3 In gread beam
0.90 4 22.90
0.90 75.82 0.40
0.25 9.16
5 11.50
0.90 5 12.00
0.90 46.58 0.40
0.25 6.00
1 23.40 Bulk excavation 15.16 m3
13.50 2.7 Form work to grade beam
0.20 63.18 2 22.90
185.57 m3 0.40 18.32

1.4 Fill borrowed materials 6 21.65


1 23.40 Including 0.25 working space 0.40 51.96
13.50 both sides
0.37 116.88 2 13.00
deduction masonary wall 0.40 10.40
-4 22.90
0.40 8 12.00
0.37 (13.56) 0.40 38.40
119.08 m2
-5 11.40 Reinforcement bar
0.40 2.6 Dia. 14mm deformation bar
0.37 (8.44)
94.89 m3 Total 1,111.07 kg
118.61 m3 add bulckaeg 25% 395.71m³ 2.7 Dia. 12mm deformation bar

1.5 Cart away excavated kg


materials 2.8 Dia. 8mm deformation bar
1 466.20
0.30 139.86 Item No 1.1 336.54 kg
185.57 Item No 1.2
325.43 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION
3. Masonary Work
3.1 Stone masonarry work
4 22.90 Foundation wall BNGL
0.40
0.85 31.14

5 11.40
0.40
0.85 19.38
50.52 m3

3.2 ditto but above N.G external


left pointed

4 22.90
0.40
0.10 3.66

5 11.40
0.40
0.10 2.28
5.94 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC 2. Concrete work
A. Sub Structure 3 21.95 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 32.93 concrete.
1 24.95 1.1 Site clearing
15.35 382.98 6 10.85
382.98 m2 0.50 32.55
1.2 Trench excavation 65.48 m2
3 22.45 in ordinary soil 2.4 In gread beam
0.90 3 21.95
0.30 18.18 0.40
0.25 6.58
6 0.15
0.90 6 11.60
0.30 0.24 0.40
0.25 6.96
1 22.45 Bulk excavation 13.54 m3
12.85 2.7 Form work to grade beam
0.25 72.12 2 21.95
90.55 m3 0.40 17.56

1.4 Fill borrowed materials 4 20.45


1 22.45 Including 0.25 working space 0.40 32.72
12.85 both sides
0.50 144.24 2 12.35
deduction masonary wall 0.40 9.88
-3 22.90
0.40 10 11.60
0.50 (13.74) 0.40 46.40
106.56 m2
-6 11.15 Reinforcement bar
0.40 2.6 Dia. 14mm deformation bar
0.50 (13.38)
117.12 m3 Total 798.93 kg
146.40 m3 add bulckaeg 25% 395.71m³ 2.7 Dia. 12mm deformation bar

1.5 Cart away excavated kg


materials 2.8 Dia. 8mm deformation bar
1 382.98
0.30 114.89 Item No 1.1 298.60 kg
90.55 Item No 1.2
205.44 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
3. Masonary Work
3.1 Stone masonarry work
3 21.95 Foundation wall BNGL
0.40
0.85 22.39

6 11.15
0.40
0.85 22.75
45.14 m3

3.2 ditto but above N.G external


left pointed

3 21.95
0.40
0.30 7.90

6 11.15
0.40
0.30 8.03
15.93 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN 2. Concrete work
A. Sub Structure 3 21.95 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 32.93 concrete.
1 31.65 1.1 Site clearing
16.00 506.40 6 10.85
506.40 m 2
0.50 32.55
1.2 Trench excavation 65.48 m2
4 29.15 in ordinary soil 2.4 In gread beam
0.90 3 21.95
0.30 31.48 0.40
0.25 6.58
6 0.15
0.90 6 11.60
0.30 0.24 0.40
0.25 6.96
1 22.45 Bulk excavation 13.54 m3
12.85 2.7 Form work to grade beam
0.25 72.12 2 21.95
103.85 m3 0.40 17.56

1.4 Fill borrowed materials 4 20.45


1 22.45 Including 0.25 working space 0.40 32.72
12.85 both sides
0.50 144.24 2 12.35
deduction masonary wall 0.40 9.88
-3 22.90
0.40 10 11.60
0.50 (13.74) 0.40 46.40
106.56 m2
-6 11.15 Reinforcement bar
0.40 2.6 Dia. 14mm deformation bar
0.50 (13.38)
117.12 m3 Total kg
146.40 m3 add bulckaeg 25% 395.71m³ 2.7 Dia. 12mm deformation bar

1.5 Cart away excavated kg


materials 2.8 Dia. 8mm deformation bar
1 506.40
0.30 151.92 Item No 1.1 kg
103.85 Item No 1.2
255.77 m3

Contractor ……………………… Supervisor…………………………..


TAKE OFF SHEET

PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN
3. Masonary Work
3.1 Stone masonarry work
3 21.95 Foundation wall BNGL
0.40
0.85 22.39

6 11.15
0.40
0.85 22.75
45.14 m3

3.2 ditto but above N.G external


left pointed

3 21.95
0.40
0.30 7.90

6 11.15
0.40
0.30 8.03
15.93 m3

Contractor ……………………… Supervisor…………………………..