take off
take off
አባሪ በሆነው የክፍያ ሰነድ ጥያቄ መሰረት እስከ ዛሬ ድረስ ተëX½ ¡\X‘ SX|/¤dUi‘ –f
As per attached Statement the value of work executed and/or material supplied
to date is Birr #VALUE! .
KY^ }s^Û w` 2354074.22 K=ŸðM S‰K<” “[ÒÓ×K”:: We certify that the contractor is now entitled to
the sum of Birr #VALUE! /One Million One hundred Tweenty Fife Thousand Three Hundred Sixty
Eight & 13/100 only.
I/We ……………….. here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr #VALUE!
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT - PRIMARY HOSPITAL
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 2,078,286.84
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -
I/We …... here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 1,384,560.78
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 777,357.33
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 1,879,704.73
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr #VALUE!
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 985,186.22
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
PROJECT -
LOCATION -
INVESTOR -
CONSULTANT -
CONTRACTOR -
I/We ere by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 962,095.12
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 111,362.11
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 1,114,206.79
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 121,182.53
Contractor________________ Superviser_________________
SUMMARY OF STATEMENT No 04
I/We here by certify that the above figures are correct and that the total
value of work executed and/ or materials to date is Birr 92,157.92
Contractor________________ Superviser_________________
IPD BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 826 832.28 10 8,322.75
1.2 Trench m3 91.97 74.74 45 3,363.12
1.3 -
1.4 Selected borrowed fill m3 22.99 318.75 140 44,625.67
1.5 Cart away m3 316.78 324.42 30 9,732.56
1.6 25 cm thick hard core m2 691 643.60 85 54,705.92
Total to summary - 120,750.01
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 188 154.30 85 13,115.50
2.3 10 cm thick RC floor slab C-20 m 2
691 643.60 400 257,439.60
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 38 31.53 3200 100,896.00
Form work to -
2.7 Grade beam m2 302 224.92 200 44,984.00
2.10 Steps m2 4.5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 2734 2,467.53 46 113,506.32
2.12 Dia. 12mm def. bar kg -
2.13 Dia. 8mm def. bar kg 3000 3396.82 46 156,253.82
2.14 10/2 cm chip wood expansion joint m 485 542.60 48 26,044.80
Total to summary -
3. MASONARY WORK - 712,240.05
3.1 Trychitic or equivalent stone m3 68.98 96.72 1300 125,736.00
3.2 Ditto but above NGL m3 38 38.69 1350 52,228.80
Total to summary - 177,964.80
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 4.9 4.37 3200 13,977.60
1.2 In beam m3 23 20.21 3200 64,684.80
1.3 Lintel m3 1.3 3200 -
Form work to -
1.4 Elevation column m2 118 98.28 200 19,656.00
1.5 Beam m 2
302 281.13 250 70,281.25
1.6 Lintel m2 10.7 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg -
1.8 Dia. 12mm def. bar kg 2809 2,631.64 46 121,055.50
1.9 Dia. 8mm def. bar kg 779 751.72 48 36,082.78
Total to summary 325,737.92
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 538.00 415.26 450 186,867.00
2.2 15 cm thick m² 425.00 405.33 410 166,186.57
Total to summary……………..Birr 353,053.57
Contractor_______________________ Superviser______________________
IPD BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 696.74 784.08 350 274,426.25
Total to summary……………..Birr 274,426.25
Contractor_______________________ Superviser______________________
STAFF RESIDENCE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 154 155.80 10 1,558.00
1.2 Trench m3 39.71 42.48 45 1,911.60
1.3 -
1.4 Selected borrowed fill m3 9.93 42.23 140 5,912.20
1.5 Cart away m3 75.98 89.22 30 2,676.60
1.6 25 cm thick hard core m2 97 89.72 100 8,971.80
Total to summary - 21,030.50
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 42 30.25 85 2,571.25
2.3 10 cm thick RC floor slab C-20 m 2
97 89.72 400 35,887.20
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 11 6.25 3200 20,000.00
Form work to -
2.7 Grade beam m2 45 49.40 3200 158,080.00
2.10 Steps m 2
4 3200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1391 492.37 46 22,649.17
2.13 Dia. 8mm def. bar kg 600 522.98 48 25,103.04
2.15 10/2 cm chip wood expansion joint m 300 174.30 22 3,834.60
Total to summary - 268,125.26
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 29.78 18.00 1300 23,400.00
3.2 Ditto but above NGL m 3
26 9.36 1350 12,636.00
Total to summary - 36,036.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.3 1.09 3200 3,494.40
1.2 In beam m 3
3.6 3.75 3200 12,000.00
1.3 Lintel m3 0.6 -
Form work to -
1.4 Elevation column m2 38 24.57 200 4,914.00
1.5 Beam m 2
60 57.70 250 14,425.00
1.6 Lintel m2 1.5 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg 0 -
1.8 Dia. 12mm def. bar kg 714 401.16 46 18,453.49
1.9 Dia. 8mm def. bar kg 250 151.76 48 7,284.43
1.10 Dia. 6mm plain bar kg -
Total to summary 60,571.32
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 305.00 140.34 450 63151.2
2.2 15 cm thick m² 66.00 75.89 410 31116.54
Total to summary……………..Birr 94,267.74
Contractor_______________________ Superviser______________________
STAFF RESIDENCE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 162 167.44 350 58,604.00
Total to summary……………..Birr 58,604.00
Contractor_______________________ Superviser______________________
SQ BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 91 112.10 10 1,121.00
1.2 Bulk excavation not exceeding 1.5m m3 136.5 34.56 45 1,555.20
1.3 Ditto but exceeding 1.5m & less than 2m m 3
45.5 50 -
1.4 Selected borrowed fill m3 182 24.12 140 3,376.80
1.5 Cart away m3 209.3 68.19 30 2,045.70
1.6 25 cm thick hard core m 2
35 42.50 85 3,612.33
Total to summary - 11,711.03
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 25 24.25 85 2,061.25
2.2 10 cm thick RC floor slab C-20 m2 35 42.50 85 3,612.33
C-25 RC 360kg/m3 -
2.3 In grade beam & step m 3
5 5.10 400 2,040.00
Form work to -
2.4 Grade beam m2 25 40.20 200 8,040.00
2.50 Steps m2 4 200 -
Re. steel bar -
2.6 Dia. 14mm def. bar kg 300 493.10 46 22,682.56
2.7 Dia. 12mm def. bar kg 300 46 -
2.8 Dia. 8mm def. bar kg 300 2.85 48 136.80
2.9 Dia. 6mm plain bar kg -
2.10 10/2 cm chip wood expansion joint m 45 53.10 22 1,168.20
Total to summary - 39,741.14
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 27 15.30 1300 19,890.00
3.2 Ditto but above NGL m3 8.8 7.96 1350 10,740.60
Total to summary - 30,630.60
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 1.2 1.09 3200 3,494.40
1.2 In beam m3 2.5 2.85 3200 9,120.00
Form work to -
1.3 Elevation column m2 21 24.57 200 4,914.00
1.4 Beam m2 30 42.04 250 10,510.00
Re. steel bar -
1.7 Dia. 14mm def. bar kg 0 -
1.8 Dia. 12mm def. bar kg 330 492.59 46 22,659.20
1.9 Dia. 8mm def. bar kg 250 151.76 46 6,980.91
1.10 Dia. 6mm plain bar kg 60 50 -
Total to summary 57,678.52
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 85.00 84.65 450 38091.6
2.2 15 cm thick m² 45.00 21.29 410 8730.54
Total to summary……………..Birr 46,822.14
Contractor_______________________ Superviser______________________
SQ BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 60 65.52 350 22,932.00
Total to summary……………..Birr 22,932.00
Contractor_______________________ Superviser______________________
OR & DELIVERY BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 987.89 773.96 350 270,886.00
Total to summary……………..Birr 270,886.00
Contractor_______________________ Superviser______________________
EMERGENCY & WAITING Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 594.45 465.36 10 4,653.55
1.2 Trench m3 78.02 49.74 45 2,238.30
1.3 -
1.4 Selected borrowed fill m3 19.51 117.15 140 16,401.00
1.5 Cart away m3 236.85 139.61 30 4,188.20
1.6 25 cm thick hard core m2 347 225.31 100 22,530.86
Total to summary - 50,011.91
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 195 102.70 85 8,729.50
2.3 10 cm thick RC floor slab C-20 m 2
347 225.31 400 90,123.44
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 28 21.34 3200 68,272.00
Form work to -
2.7 Grade beam m2 140 281.90 200 56,380.00
2.10 Steps m 2
5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 2000 1,946.44 46 89,536.35
2.12 Dia. 8mm def. bar kg 2300 2,398.93 48 115,148.82
2.14 10/2 cm chip wood expansion joint m 390 234.14 22 5,151.08
Total to summary - 433,341.19
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 58.52 71.61 1300 93,093.00
3.2 Ditto but above NGL m 3
28 28.64 1350 38,669.40
Total to summary - 131,762.40
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 5.62 2.62 3200 8,386.56
1.2 In beam & steps m 3
16.7 9.39 3200 30,048.00
1.3 Lintel m3 1.3 3200 -
Form work to -
1.4 Elevation column m2 113 58.97 200 11,793.60
1.5 Beam m 2
224 71.61 250 17,902.50
1.6 Lintel m2 10.8 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg 1526 46 -
1.8 Dia. 12mm def. bar kg 1358 2,532.72 46 116,505.03
1.9 Dia. 8mm def. bar kg 1227 775.46 48 37,222.27
Total to summary 221,857.96
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 393.00 #VALUE! 450 #VALUE!
2.2 15 cm thick m² 226.00 140.68 410 57,680.85
Total to summary……………..Birr #VALUE!
Contractor_______________________ Superviser______________________
EMERGENCY & WAITING BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 596.38 427.36 350 149,576.00
Total to summary……………..Birr 149,576.00
Contractor_______________________ Superviser______________________
ADMINSTRATION Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 366 373.50 10 3,735.00
1.2 Trench m3 61.22 108.79 45 4,895.64
1.3 -
1.4 Selected borrowed fill m3 15.3 94.89 140 13,284.60
1.5 Cart away m3 155.71 220.84 30 6,625.26
1.6 25 cm thick hard core m2 284 210.63 100 21,062.73
Total to summary - 50,549.46
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 77 73.75 85 6,268.75
2.3 10 cm thick RC floor slab C-20 m 2
284 210.63 400 84,250.92
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 15 15.16 3200 48,512.00
2.5 Infooting pad m3 4 3200 -
2.6 In footing column m3 3.5 3200 -
Form work to -
2.7 Grade beam m2 77 119.08 200 23,816.00
2.10 Steps m2 5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1121 1,213.15 46 55,804.72
2.13 Dia. 8mm def. bar kg 1500 2,737.24 48 131,387.49
2.14 10/2 cm chip wood expansion joint m 221 229.00 22 5,038.00
Total to summary - 355,077.88
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 45.91 44.58 1300 57,954.00
3.2 Ditto but above NGL m3 15 5.94 1350 8,024.40
Total to summary - 65,978.40
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.6 2.18 3200 6,988.80
1.2 In beam & steps m3 9.3 9.16 3200 29,299.20
1.3 Lintel m3 0.75 3200 -
Form work to -
1.4 Elevation column m2 52 49.14 200 9,828.00
1.5 Beam m2 124 114.49 250 28,622.50
1.6 Lintel m2 8 250 -
Re. steel bar -
1.7 Dia. 12mm def. bar kg 1174 1,345.07 46 61,873.28
1.8 Dia. 8mm def. bar kg 325 374.62 48 17,981.66
1.9 Dia. 6mm plain bar kg -
Total to summary 154,593.45
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 250.00 166.50 450 74923.2
2.2 15 cm thick m² 125.00 283.78 410 116351.235
Total to summary……………..Birr 191,274.44
Contractor_______________________ Superviser______________________
ADMINSTRATION BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 342.46 342.22 350 119,777.00
Total to summary……………..Birr 119,777.00
Contractor_______________________ Superviser______________________
DIAGNOSTIC SERVICE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 343 382.98 10 3,829.83
1.2 Trench m3 59.26 90.55 45 4,074.67
1.3 -
1.4 Selected borrowed fill m3 14.82 117.12 140 16,396.98
1.5 Cart away m3 147.35 205.44 30 6,163.29
1.6 25 cm thick hard core m2 213 251.71 100 25,170.86
Total to summary - 55,635.61
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 70 65.48 85 5,565.37
2.3 10 cm thick RC floor slab C-20 m 2
213 251.71 400 100,683.44
C-25 RC 360kg/m3 -
2.4 In grade beam & step m3 22 13.54 3200 43,344.00
Form work to -
2.7 Grade beam m2 70 106.56 200 21,312.00
2.10 Steps m 2
5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1008 988.38 46 45,465.31
2.13 Dia. 8mm def. bar kg 1200 2,700.27 48 129,612.84
2.14 10/2 cm chip wood expansion joint m 208 197.80 22 4,351.60
Total to summary - 350,334.56
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 44.45 39.83 1300 51,772.50
3.2 Ditto but above NGL m 3
14 15.93 1350 21,505.50
Total to summary - 73,278.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.18 1.97 3200 6,289.92
1.2 In beam & steps m 3
8 8.18 3200 26,179.20
1.3 Lintel m3 0.8 3200 -
Form work to -
1.4 Elevation column m2 47 44.23 200 8,845.20
1.5 Beam m 2
111 131.86 250 32,963.75
1.6 Lintel m2 9 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg 0 -
1.8 Dia. 12mm def. bar kg 1028 1,078.41 46 49,607.04
1.9 Dia. 8mm def. bar kg 294 314.97 48 15,118.70
1.10 Dia. 6mm plain bar kg -
Total to summary - 139,003.81
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 146.00 158.53 450 71340.08
2.2 15 cm thick m² 218.00 291.68 410 119590.19
Total to summary……………..Birr 190,930.27
Contractor_______________________ Superviser______________________
DIAGNOSTIC BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 319.41 313.68 350 109,788.88
Total to summary……………..Birr 109,788.88
Contractor_______________________ Superviser______________________
GENERATOR HOUSE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 92 44.03 10 440.30
1.2 Trench m3 30.69 5.05 45 227.21
1.3 -
1.4 (A)Selected borrowed fill from out site m3 7.67 140
(B)Selected borrowed fill from in site m3 7.67 9.71 56.6 549.44
1.5 Cart away m3 50.62 13.21 30 396.27
1.6 25 cm thick hard core m2 88 17.07 100 1,707.24
Total to summary - 3,320.46
2. CONCRETE WORK -
2.1 5 cm thick lean concrete C-7 (150kg/m 3) m2 21 8.40 85 714.00
2.3 10 cm thick RC floor slab C-20 m2 88 17.07 400 6,828.96
C-25 RC 360kg/m3 -
2.4 In grade beam & step m 3
6 1.77 3200 5,664.00
Form work to -
2.7 Grade beam m2 35 14.16 200 2,832.00
2.10 Steps m2 2 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 538.69 46 24,779.83
2.12 Dia. 8mm def. bar kg 300 41.71 48 2,002.18
2.13 10/2 cm chip wood expansion joint m 120 36.30 22 798.60
Total to summary - 43,619.57
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 20 6.00 1300 7,800.00
3.2 Ditto but above NGL m3 6 1.20 1350 1,620.00
Total to summary - 9,420.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 2.18 0.44 3200 1,397.76
1.2 In beam m3 2 1.24 3200 3,955.20
Form work to -
1.3 Elevation column m2 24 9.83 200 1,965.60
1.4 Beam m 2
24 15.02 250 3,753.75
Re. steel bar -
1.5 Dia. 12mm def. bar kg 534 157.25 46 7,233.36
1.6 Dia. 8mm def. bar kg 150 47.48 48 2,278.99
Total to summary 20,584.67
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 163.00 39.52 450 17783.32
Total to summary……………..Birr 17,783.32
Contractor_______________________ Superviser______________________
GENERATOR HOUSE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 114 31.93 350 11,175.50
Total to summary……………..Birr 11,175.50
Contractor_______________________ Superviser______________________
KITCHEN Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 451 506.40 10 5,064.00
1.2 Bulk excavation not exceeding 1.5m m3 67.96 31.72 45 1,427.63
-
1.4 (A)Selected borrowed fill from out site m3 16.99 140
(B)Selected borrowed fill from in site m3 16.99 117.12 56.6 6,629.06
1.5 Cart away m3 186.27 151.92 30 4,557.60
1.6 25 cm thick hard core m 2
288 324.59 100 32,459.44
Total to summary - 50,137.73
2. CONCRETE WORK -
5 cm thick lean concrete C-7 (150kg/m 3) -
2.1 Masonary foundation m2 95 65.48 85 5,565.37
2.3 10 cm thick RC floor slab C-20 m2 288 324.59 400 129,837.76
C-25 RC 360kg/m 3
-
2.4 In grade beam & step m3 19 13.54 3200 43,344.00
Form work to -
2.7 Grade beam m2 153 106.56 200 21,312.00
2.10 Steps m 2
5 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 1381 1,505.58 46 69,256.62
2.13 Dia. 8mm def. bar kg 1500 2,021.25 48 97,020.22
2.14 10/2 cm chip wood expansion joint m 277 282.90 22 6,223.80
Total to summary - 372,559.78
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 50.97 45.14 1300 58,675.50
3.2 Ditto but above NGL m3 19 15.93 1350 21,505.50
Total to summary - 80,181.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 3.2 2.62 3200 8,386.56
1.2 In beam m 3
12 11.12 3200 35,596.80
1.3 Lintel m3 0.9 3200 -
Form work to -
1.4 Elevation column m2 63 58.97 200 11,793.60
1.5 Beam m2 152 156.75 250 39,187.50
1.6 Lintel m 2
9.3 250 -
Re. steel bar -
1.7 Dia. 14mm def. bar kg -
1.8 Dia. 12mm def. bar kg 1432 1,635.66 46 75,240.38
1.9 Dia. 8mm def. bar kg 396 429.21 48 20,601.94
Total to summary 190,806.78
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 313.00 462.90 450 208,304.10
2.2 15 cm thick m² 151.00 10.10 410 4,141.41
Total to summary……………..Birr 212,445.51
Contractor_______________________ Superviser______________________
KITCHEN BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 424.17 423.87 350 148,354.50
Total to summary……………..Birr 148,354.50
Contractor_______________________ Superviser______________________
GUARD HOUSE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 39 36.26 10 362.60
1.2 Trench m3 19.98 4.21 45 189.54
1.3 -
1.4 (A)Selected borrowed fill from out site m3 5 140
(B)Selected borrowed fill from in site m3 5 7.03 56.6 397.90
1.5 Cart away m3 26.69 10.88 30 326.34
1.6 25 cm thick hard core m 2
14 10.29 100 1,029.00
Total to summary - 2,305.38
2. CONCRETE WORK -
5 cm thick lean concrete C-7 (150kg/m 3) -
2.1 Foundation m2 8 7.40 85 629.00
2.2 10 cm thick RC floor slab C-20 m2 14 10.29 400 4,116.00
C-25 RC 360kg/m 3
-
2.3 In grade beam & step m3 2 1.56 3200 4,992.00
Form work to -
2.3 Grade beam m2 15 12.48 200 2,496.00
2.40 Steps m2 2 200 -
Re. steel bar -
2.5 Dia. 14mm def. bar kg 122 545.95 46 25,113.79
2.7 Dia. 8mm def. bar kg 115 110.92 48 5,323.97
2.8 Dia. 6mm plain bar kg -
2.9 10/2 cm chip wood expansion joint m 22 14.60 22 321.20
Total to summary - 42,991.96
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 8 5.10 1300 6,630.00
3.2 Ditto but above NGL m3 3 1.80 1350 2,430.00
Total to summary - 9,060.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 0.55 0.44 3200 1,397.76
1.2 In beam m3 1 0.95 3200 3,033.60
Form work to -
1.3 Elevation column m2 8.72 9.83 200 1,965.60
1.4 Beam m2 16 13.23 250 3,307.50
Re. steel bar -
1.6 Dia. 12mm def. bar kg 72 151.39 46 6,963.77
1.7 Dia. 8mm def. bar kg 55 46.77 48 2,244.86
1.8 Dia. 6mm plain bar kg 3 50 -
Total to summary 18,913.09
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 56.00 69.49 450 31,271.40
2.2 15 cm thick m² 16.00 410 -
Total to summary……………..Birr 31,271.40
Contractor_______________________ Superviser______________________
GUARD HOUSE BLOCK Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
B. SUPER STRUCTURE
3. ROOFING
3.1 G- 28 Roof Covering m² 30 31.93 350 11,175.50
Total to summary……………..Birr 11,175.50
Contractor_______________________ Superviser______________________
MOURGE Quantity Uint Total
Item Description Unit Contract Excuted Rate Sub total Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear of site m2 42 36.26 10 362.60
1.2 Bulk excavation not exceeding 1.5m m3 20.7 4.21 45 189.54
1.3 -
1.4 (A)Selected borrowed fill from out site m3 5.18 140
(B)Selected borrowed fill from in site m3 5.18 7.03 56.6 397.90
1.5 Cart away m3 28.11 10.88 30 326.34
1.6 25 cm thick hard core m2 46 10.29 100 1,029.00
Total to summary - 2,305.38
2. CONCRETE WORK -
5 cm thick lean concrete C-7 (150kg/m 3) -
2.1 Masonary foundation m2 14 7.40 85 629.00
2.3 10 cm thick RC floor slab C-20 m2 46 10.29 400 4,116.00
C-25 RC 360kg/m 3
-
2.4 In grade beam & step m3 6 1.56 3200 4,992.00
Form work to -
2.7 Grade beam m2 32 12.48 200 2,496.00
2.10 Steps m2 2 200 -
Re. steel bar -
2.11 Dia. 14mm def. bar kg 675 423.98 46 19,503.26
2.13 Dia. 8mm def. bar kg 900 110.92 48 5,323.97
2.14 10/2 cm chip wood expansion joint m 120 14.60 22 321.20
Total to summary - 37,381.43
3. MASONARY WORK -
3.1 Trychitic or equivalent stone m3 15.55 4.50 1300 5,850.00
3.2 Ditto but above NGL m3 6 0.60 1350 810.00
Total to summary - 6,660.00
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
RC C-25 with min. cement of 360kg/m3 -
1.1 In elevation column m3 0.98 0.44 3200 1,397.76
1.2 In beam m3 1.98 0.95 3200 3,033.60
Form work to -
1.4 Elevation column m2 19 9.83 200 1,965.60
1.5 Beam m2 25.32 13.23 250 3,307.50
Re. steel bar -
1.7 Dia. 14mm def. bar kg -
1.8 Dia. 12mm def. bar kg 305 147.12 46 6,767.70
1.9 Dia. 8mm def. bar kg 130 43.92 48 2,108.35
Total to summary - 18,580.51
2. BLOCK WORK
Concrete block wall class C
2.1 20 cm thick m² 120.00 34.67 450 15,602.40
2.2 15 cm thick m² 0.00 410 -
Total to summary……………..Birr 15,602.40
Contractor_______________________ Superviser______________________
TAKE OFF SHEET
2.40
7.15 17.16
-8 16.55 2 5.85
0.52 7.15 83.66
0.40 (27.54)
318.75 m3 2 5.85
398.44 add bulckaeg 25 % with mistek 2.45 28.67
(79.69) deduction bulckaeg 25%
318.75 m3 Total 2 5.85
1.5 Cart away excavated 5.80 67.86
materials
1 832.28 2 5.95
0.30 249.68 Item No 1.1 2.33 27.73
74.74 Item No 1.2
324.42 m3
Reinforcement bar
1.8 Dia. 12mm deformation bar
2,631.64 kg
2 15.55 -5 0.90
2.73 84.90 Add for axis Y/01 & Y/08 2.73 -12.29 diduct for door 9
2 38.50 -1 1.30
0.25 19.25 Add for axis x/01- x/04 Above TTB 2.73 -3.55 diduct for door 11
F &R SIDE
1 18.55 -1 2.50
1.85 34.32 Add for axis Y/01 & Y/08 Above 2.73 -6.83 diduct for opening
TTB Gable side 415.26 m2 TOTAL
1 72.10
2.73 196.83 Add for partion wall TL=72.10 2.2 15cm thick HCB
1 155.97 Total length of partition wall= 155.97
Lower =34x1= 34
34 19.75
671.50
1,358.30 ml
Ver.=1.85+2(1.68+1.51+1.34+ 1.18
+1.00+0.84+0.70+0.50+0.35)
34 20.45 =20.45ml
695.30
Diag=2(1.91+1.76+1.62+1.48+1.35
+1.23+1.12+1.03+0.96+0.91)
34 26.68 =26.68ml
907.12
1,602.42 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
A. Sub Structure 2 3.62 1.6 25cm thick hard core
1. Excavation & Earth Work 3.92 28.38
1 34.69 1.1 Site clearing
13.20 457.91 1 3.62
2.35 8.51
457.91 m2
10 4.75
3.92 186.20
1.2 Trench excavation
4 35.60 in ordinary soil 5 4.75
0.90 2.35 55.81
0.30 38.45
2 5.72
8 11.70 3.92 44.84
0.90
0.30 25.27 1 5.72
2.35 13.44
63.72 m3
337.19 m2
1.4 Fill borrowed materials 2. Concrete work
1 35.60 Including 0.25 working space 4 35.20 2.1 50mm thick lean
11.70 both sides 0.50 70.40 concrete.
0.50 208.26
deduction masonary wall 8 9.30
-4 35.10 0.50 37.20
0.50 107.60 m2
0.40 (28.08)
2.3 10cm thick RC floor slab C-20
-8 8.00 Ditto as item 1.6
0.50
0.40 (12.80) 337.19 m2
167.38 m3 Total
209.23 add bulckaeg 25 % with mistek 2.4 In gread beam
(41.85) deduction bulckaeg 25% 4 35.10
167.38 m3 Total 0.40
1.5 Cart away excavated 0.25 14.04
materials
1 457.91 8 10.20
0.30 137.37 Item No 1.1 0.40
56.64 Item No 1.2 0.25 8.16
194.01 m3 22.20 m3
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
3. Masonary Work
2.7 Form work to grade beam 3.1 Stone masonarry work
2 35.10 4 35.10 Foundation wall BNGL
0.40 28.08 0.40
0.75 42.12
6 33.10
0.40 79.44 8 9.60
0.40
2 11.20 0.75 23.04
0.40 8.96 65.16 m3
3,078.57 kg
327.40 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
A. Super Structure
1. Concrete work 2 11.20 ax s Y01 & Y08 external side
32 2.73 1.1 In elevaation Column 0.30 6.72
0.20
0.20 3.49 14 10.40 axis Y01 - Y08 internal side
3.49 m3 0.30 43.68
64 2.73
0.20 34.94
78.62 m2
1.5 In beams
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
2. BLOCK WORK -1 1.60
2.1. 20CM THICK HCB 0.60 -0.96 Diducte for window 7
3 33.50
2.73 274.37 for axisY/01,Y/03&Y/04 -2 1.40
2.73 -7.64 Diducte for door 1
1 13.21 266.28 m2 m2 TOTAL
1.75 23.12 Add for AxisX/01 & X/08 Abave TTB Gable side
2.2 15cm thick HCB
2 35.10 1 33.50
0.25 17.55 Add for AxisY/01 & Y/04 Abave TTB F & R side 2.73 91.46 Add For axis Y/02
-1 2.40
2.73 -6.55 Diducte for waiting room opening
-1 2.90
0.60 -1.74 Diducte for window 25
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
OPD
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 36.30
projection 653.40
36.30
14.41 653.40 ml
523.08
Lower =34x1= 34
30 14.41
432.30
876.90 ml
Ver.=1.63+2(1.53+1.31+1.09+ 0.88
+0.66+0.44+0.22)
30 13.89 =13.89ml
416.70
Diag=2(1.78+1.59+1.42+1.26+1.11+
1+0.93)
30 18.18 =18.18ml
545.40
962.10 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
A. Sub Structure 2 3.92 1.6 25cm thick hard core
1. Excavation & Earth Work 5.70 44.69
1 19.00 1.1 Site clearing
8.20 155.80 2 3.95
155.80 m2 5.70 45.03
89.72 m2
2. Concrete work
1.2 Trench excavation 2 17.00 2.1 50mm thick lean
2 17.50 in ordinary soil 0.50 17.00 concrete.
0.80
0.90 25.20 5 5.30
0.50 13.25
5 4.80 30.25 m2
0.80
0.90 17.28 2.3 10cm thick RC floor slab C-20
Ditto as item 1.6
42.48 m3
89.72 m2
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE A. Super Structure
Reinforcement bar 1. Concrete work
2.11 Dia. 14mm deformation bar 10 2.73 1.1 In elevaation Column
0.20
492.37 kg 0.20 1.09
2.12 Dia. 12mm deformation bar 1.09 m3
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
Reinforcement bar 2.2 15cm thick HCB
1.8 Dia. 12mm deformation bar 4 6.95
401.16 kg 2.73 75.89
75.89 m2 TOTAL
1.9 Dia. 8mm deformation bar
151.76 kg
2. BLOCK WORK
2.1 . 20CM THICK HCB
2 16.00
2.73 87.36 for axis x/01 & x/02
5 5.80
2.73 79.17 Add for axis y/01 - y/05
2 17.00
0.25 8.50 Add for Axis X/01 & X/02 Abave TTB
F & R side
-8 0.90
2.73 -19.66 Diducte for door 6
-4 1.80
1.73 -12.46 Diducte for window 7 opening
-4 1.00
1.73 -6.92 Diducte for window 10 opening
-4 0.90
1.12 -4.032 Diducte for window 11 opening
140.34 m2 TOTAL
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 12 18.20
projection 218.40
18.20
9.20 218.40 ml
167.44
Lower =15x1=15
15 9.20
138.00
279.90 ml
Ver.=1.10+2(0.88+0.67+0.45+0.24)
=5.58ml
15 5.58
83.70
Diag=2(1.26+1.12+1.00+0.93)_
=8.62ml
15 8.62
129.30
213.00 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER
A. Sub Structure 2 3.92 1.6 25cm thick hard core
2.70 21.17
1. Excavation & Earth Work
1 19.00 1.1 Site clearing 2 3.95
5.90 112.10 2.70 21.33
112.10 m2 42.50 m2
1.2 Trench excavation 2. Concrete work
2 17.50 in ordinary soil 2 17.00 2.1 50mm thick lean
0.80 0.50 17.00 concrete.
0.90 25.20
5 2.90
5 2.60 0.50 7.25
0.80 24.25 m2
0.90 9.36
2.2 10cm thick RC floor slab C-20
34.56 m3 Ditto as item 1.6
42.50 m2
1.4 Fill borrowed materials
2.3 In gread beam
1 17.50 Including 0.25 working space 2 17.00
4.40 both sides 0.40
0.45 34.65 0.25 3.40
deduction masonary wall
-2 17.00 5 3.40
0.40 0.40
0.45 (6.12) 0.25 1.70
5.10 m3
-5 4.90 2.4 Form work to grade beam
0.40 2 17.00
0.45 (4.41) 0.40 13.60
24.12
30.15 add bulckaeg 25 % with mistek 2 15.75
(6.03) deduction bulckaeg 25% 0.40 12.60
24.12 m3 Total
1.5 Cart away excavated 2 3.90
materials 0.40 3.12
1 112.10
0.30 33.63 Item No 1.1 8 3.40
34.56 Item No 1.2 0.40 10.88
68.19 m3 40.20 m2
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER A. Super Structure
1. Concrete work
Reinforcement bar 10 2.73 1.1 In elevaation Column
2.6 Dia. 14mm deformation bar 0.20
0.20 1.09
493.10 kg 1.09 m3
2.7 Dia. 12mm deformation bar 1.2 In beams
2 17.00
- kg 0.30
2.8 Dia. 8mm deformation bar 0.20 2.04
302.18 kg 5 2.70
0.30
2.10 10/2cm chip wood expansion joint 0.20 0.81
2.85 m3
2 15.75 31.50 17--(5*0.25)=15.75 FORM WORK TO
20 2.73 1.3 Elevation column
8 2.70 21.60 0.25 13.65
10*2=20
53.10 ml 20 2.73
3. Masonary Work 0.20 10.92
3.1 Stone masonarry work 24.57 m2
2 17.00 Foundation wall BNGL 1.4 In beams
0.40 2 17.00 axis x01& x02 external side
0.75 10.20 0.30 10.20
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER
Reinforcement bar 3 Roofing
1.8 Dia. 12mm deformation bar 3.1 G-28 CIS Roof measured in horizontl
492.59 kg projection
18.20
1.9 Dia. 8mm deformation bar 9.20
167.44
151.76 kg
4 Carpentry & Joinery
4.1 Upper & lower chord dia. 10 - 12 cm
2. BLOCK WORK No of Truss = 15
2.1. 20CM THICK HCB Upper = 15x2 =30
2 16.00
. 3.69
2.73 87.36 for axis x/01 & x/02 30 3.69
110.70
2 2.60 . 3.6
2.73 14.20 Add for axis y/01& y/05
Lower =15x1= 15
1 3.00 Add for AxisY/01 & Y/05 Abave TTB 15 9.20
1.10 3.30 Gable side 138.00
2 17.00 248.70 ml
0.25 8.50 Add for Axis X/01 & X/02 Abave TTB
F & R side 4.2 Vertical & Diagonal dia. 8 - 10 cm
-4 0.90
2.73 -9.83 Diducte for door 6 opening Ver.=0.82+0.62+0.41+0.21
=2.06ml
-4 1.50 15 2.06
1.73 -10.38 Diducte for window 2 opening 30.90
84.65 m2 TOTAL Diag=1.09+0.99+0.92
=3.00ml
2.2 15cm thick HCB 15 3.00
3 2.60 45.00
2.73 21.29
21.29 m2 TOTAL 75.90 ml
182.00 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
A. Sub Structure 1.6 25cm thick hard core
1. Excavation & Earth Work 2 5.72
1 45.85 1.1 Site clearing 7.12 40.73
19.35 887.20
887.20 m2 5.72
1.2 Trench excavation 2.45 14.01
4 43.35 in ordinary soil
0.90 6 5.75
0.90 140.45 7.12 40.94
9 13.25 3 5.75
0.90 2.45 14.09
0.90 96.59
2 4.75
1 45.85 Bulk excavation 7.12 33.82
19.35
0.25 221.80 4.75
458.85 m3 2.45 11.64
-9 14.75 1 4.85
0.40 2.45 11.88
0.65 (34.52)
390.78 2 4.42
494.64 add bulckaeg 25% with mistek 7.12 62.94
(98.92) deduction bulckaeg 25 %
390.78 m3 Total 1 4.42
1.5 Cart away excavated 2.45 10.83
materials
1 887.20 356.83 m2
0.30 266.16
Item No 1.1
266.16 m3 Item No 1.2
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
2. Concrete work Reinforcement bar
4 42.85 2.1 50mm thick lean 2.11 Dia. 14mm deformation bar
0.50 85.70 concrete.
2,481.03 kg
9 14.35 2.12 2.7 Dia. 12mm deformation bar
0.50 64.58
150.28 m2 - kg
2.13 Dia. 8mm deformation bar
2.3 10cm thick RC floor slab C-20
Ditto as item 1.6 3,128.29 kg
356.83 m2
2.10 10/2cm chip wood expansion joint
2.3 In gread beam
4 42.85 6 41.90 251.40 44.15-(9*0.25)=41.90
0.40
0.25 17.14 16 16.70 267.20 17.7-(4*0.25)=16.70
9 15.35 518.60 ml
0.40
0.25 13.82 3. Masonary Work
30.96 m3 3.1 Stone masonarry work
4 42.85 Foundation wall BNGL
0.40
2.7 Form work to grade beam 0.75 51.42
2 42.85
0.40 34.28 9 14.75
0.40
6 40.60 0.75 39.83
0.40 97.44 91.25 m3
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
A. Super Structure
1. Concrete work 2 17.70 axis Y01&Y09 external side
36 2.73 1.1 In elevaation Column 0.30 10.62
0.20
0.20 3.93 16 16.90 axis Y01 to Y09 internal side
3.93 m3 0.30 81.12
72 2.73
0.20 39.31
88.45 m2
1.4 In beams
PROJECT LO T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR -4 0.90
2.73 -9.83 diduct for door 6
2. BLOCK WORK
2.1 20cm thick HCB -2 1.30
2.73 -7.10 diduct for door 3
2 41.1
2.73 224.41 Add for axis x/01- x/04 -2 0.80
2.73 -4.37 diduct for door 10
2 15.55
2.73 84.90 Add for axis Y/01 & Y/09 -1 0.80
2.73 -2.18 diduct for door 14
2 42.90
0.25 21.45 Add for axis x/01- x/04 Above TTB -4 0.90
F &R SIDE 2.73 -9.83 diduct for door 9
1 16.35 402.67 m2 Total
1.85 30.25 Add for axis Y/01 & Y/09 Above
TTB Gable side 2.2 15cm thick HCB
1 33.00 1 169.56 Total length of partition wall= 169.56
2.73 90.09 Add for partion wall 2.73 462.90 Add For partition wall
2 2.50 -6 1.40
2.73 13.65 Add for Corridor wall 2.73 -22.93 diduct for door 2
-1 1.30 -1 1.00
1.73 -2.25 diduct for window 4 2.73 -2.73 diduct for door 5
-2 1.00 -7 0.80
1.73 -3.46 diduct for window 14 2.73 -15.29 diduct for door 7
-5 1.10 -1 1.25
1.73 -9.52 diduct for window 12 0.60 -0.75 diduct for window 9
-1 1.50 -1 1.25
1.73 -2.59 diduct for window 16 1.73 -2.16 diduct for window 8
-4 1.40 -1 1.10
2.73 -15.29 diduct for D1=1 & D2=3 1.73 -1.90 diduct for window
378.64 m2 Total
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 22 44.10
projection 970.20
44.10
17.55 970.20 ml
773.96
Lower =37x1= 37
37 9.20
340.40
1,008.62 ml
Ver.=2.00+2(1.88+1.60+1.45+1.23
+1.00+0.78+0.57+0.36+0.20)
37 20.14 =20.14ml
745.18
Diag=2(2.08+1.89+1.71+1.53+1.41
+1.19+1.06+0.97+0.91)
37 25.50 =25.50ml
943.50
1,688.68 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
A. Sub Structure deduction masonary wall
1. Excavation & Earth Work -4 23.30
1 25.30 1.1 Site clearing 0.40 Emergency
13.35 337.76 0.60 (22.37)
1 10.75 1 4.50
10.10 4.07 18.32
0.60 65.15
1 4.50
2.35 10.58
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
3 10.60
1 4.50 0.50 15.90
3.92 17.64
3 8.10 `
1 3.90 0.50 12.15
4.07 15.87 102.70 m2
1 4.20 6 10.35
2.35 9.87 0.40
0.25 6.21
1 4.20
3.92 16.46 3 10.50
0.40
1 3.47 0.25 3.15
4.07 14.12
3 8.85
1 3.47 0.40
2.35 8.15 0.25 2.66
21.34 m3
1 3.47
3.92 13.60 2.7 Form work to grade beam
2 42.85
225.31 m2 0.40 34.28
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
16 15.35 3. Masonary Work
0.40 98.24 4 23.30 3.1 Stone masonarry work
0.40 Foundation wall BNGL
2 10.50 0.75 27.96
0.40 8.40 6 14.75
0.40
4 10.00 0.75 26.55
0.40 16.00 3 10.60
0.40
1 9.60 0.75 9.54
0.40 3.84 3 8.40
0.40
3 8.85 0.75 7.56
0.40 10.62 71.61 m3
281.90 m2
3.2 ditto but above N.G external
Reinforcement bar 4 23.30 left pointed
2.11 Dia. 14mm deformation bar 0.40
1,946.44 kg 0.30 11.18
2.12 Dia. 8mm deformation bar 6 14.75
2,398.93 kg 0.40
0.30 10.62
2.14 10/2cm chip wood expansion joint 3 10.60
0.40
6 5.72 34.32 0.30 3.82
3 8.40
6 4.50 27.00 0.40
0.3 3.02
6 3.90 23.40 28.64 m3
6 4.20 25.20
6 3.47 20.82
10 4.07 40.70
10 2.35 23.50
10 3.92 39.20
234.14 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
A. Super Structure 2 11.35 axis Y01&Y06 external side
1. Concrete work 0.30 6.81
24 2.73 1.1 In elevaation Column
0.20 10 10.55 axis Y01 to Y06 internal side
0.20 2.62 0.30 31.65
2.62 m3
6 22.10 axis Y01 to Y06 internal sofft side
1.2 In beams 0.25 33.15
4 23.30 71.61 m2
0.30
0.20 5.59 Reinforcement bar
1.8 Dia. 12mm deformation bar
6 10.55 2,532.72 kg
0.30
0.20 3.80 1.9 Dia. 8mm deformation bar
9.39 m3 775.46 kg
FORM WORK TO
1.3 Elevation column
48 2.73
0.25 32.76 24*2=48
48 2.73
0.20 26.21
58.97 m2
1.4 In beams
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
2. BLOCK WORK -9 1.50
2.1 20cm thick HCB Emergency 1.73 -23.36 diduct for window 2
3 22.1 -1 1.00
2.73 181.00 Add for axis x/01 , x/02 & x/04 1.73 -1.73 diduct for window 14
2 10.55 -2 1.30
2.73 57.60 Add for axis Y/01 & Y/07 1.73 -4.50 diduct for window 4
2 42.90 -1 2.85
0.25 21.45 Add for axis x/01- x/04 Above TTB 0.60 -1.71 diduct for window 6
F &R SIDE
1 16.35 -1 1.25
1.85 30.25 Add for axis Y/01 & Y/07 Above 0.60 -0.75 diduct for window 9
TTB Gable side 264.28 m2 Total
5 4.00
2.73 54.60 Add for partion wall 2.2 15cm thick HCB Emergency
1 22.10
-1 4.00 2.73 60.33 Add for axis x/03
1.73 -6.92 diduct for opening waiting area
1 38.05 Total length of partition wall= 38.05
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
2. BLOCK WORK 2.2 15cm thick HCB Waiting
2.1 20cm thick HCB Waiting 1 4.85 Total length of partition wall= 4.85
-2 0.80
2.73 -4.37 diduct for door 10
-1 0.90
2.73 -2.46 diduct for door 9
-1 1.00
1.73 -1.73 diduct for window 14
-1 1.15
1.73 -1.99 diduct for window 21
-1 1.50
1.73 -2.59 diduct for window 2
### m2 sub Total
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 22 44.10
projection 970.20
44.10
17.55 970.20 ml
773.96
1,008.62 ml
Ver.=2.00+2(1.88+1.60+1.45+1.23
+1.00+0.78+0.57+0.36+0.20)
37 20.14 =20.14ml
745.18
Diag=2(2.08+1.89+1.71+1.53+1.41
+1.19+1.06+0.97+0.91)
37 25.50 =25.50ml
943.50
1,688.68 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION 1.6 25cm thick hard core
A. Sub Structure 2 4.92
1. Excavation & Earth Work 5.02 49.40
1 24.90 1.1 Site clearing
15.00 373.50 1 4.92
373.50 m2 1.95 9.59
1.2 Trench excavation
4 23.40 in ordinary soil 2 4.85
0.80 5.02 48.69
0.90 67.39
1 4.85
5 11.50 1.95 9.46
0.80
0.90 41.40 2 7.00
108.79 m3 5.02 70.28
1 7.00
1.95 13.65
2 4.90
1.4 Fill borrowed materials 5.02 49.20
1 23.40 Including 0.25 working space
13.50 both sides 1 4.90
0.37 116.88 1.95 9.56
deduction masonary wall 210.63 m2
-4 22.90 2. Concrete work
0.40 4 23.00 2.1 50mm thick lean
0.37 (13.56) 0.50 46.00 concrete.
-5 11.40 5 11.10
0.40 0.50 27.75
0.37 (8.44) 73.75 m2
94.89 m3 Total
118.61 m3 add bulckaeg 25% 395.71m³ 2.3 10cm thick RC floor slab C-20
(23.72) deduction bulckeg 25 % Ditto as item 1.6
94.89 m3 210.63 m2
1.5 Cart away excavated
materials
1 373.50
0.30 112.05 Item No 1.1
108.79 Item No 1.2
220.84 m3
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION
2.3 In gread beam 3. Masonary Work
4 22.90 3.1 Stone masonarry work
0.40 4 22.90 Foundation wall BNGL
0.25 9.16 0.40
0.75 27.48
5 12.00
0.40 5 11.40
0.25 6.00 0.40
15.16 m3 0.75 17.10
44.58 m3
2.7 Form work to grade beam
2 22.90 3.2 ditto but above N.G external
0.40 18.32 left pointed
6 21.65 4 22.90
0.40 51.96 0.40
0.10 3.66
2 13.00
0.40 10.40 5 11.40
0.40
8 12.00 0.10 2.28
0.40 38.40 5.94 m3
119.08 m2
Reinforcement bar
2.11 2.6 Dia. 14mm deformation bar
1,213.15 kg
2.12 2.7 Dia. 12mm deformation bar
- kg
2.13 2.8 Dia. 8mm deformation bar
2,737.24 kg
8 12.20 97.60
229.00 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION Reinforcement bar
A. Super Structure 1.8 Dia. 12mm deformation bar
1. Concrete work 1,345.07 kg
20 2.73 1.1 In elevaation Column
0.20 1.9 Dia. 8mm deformation bar
0.20 2.18 374.62 kg
2.18 m3 2.1. 20CM THICK HCB
1.2 In beams 2 21.90
4 22.90 2.73 119.57 for axis x/01 & x/04
0.30
0.20 5.50 2 12.20
2.73 66.61 Add for axis y/01 & y/05
5 12.20
0.30 2 22.9 Add for axis X/01 & X/04 Above TTB
0.20 3.66 0.25 11.45 F &R SIDE
9.16 m3
FORM WORK TO 1 13.00 Add for axis Y/01 & Y/05 Above
40 2.73 1.3 Elevation column 1.80 23.40 TTB Gable side
0.25 27.30
24*2=48 -1 1.20
40 2.73 2.73 -3.28 Diducte for door 13
0.20 21.84
49.14 m2 -16 1.50
1.73 -41.52 Diducte for window 2
2 22.90 1.4 In beams
0.30 13.74 axis x01& x04 external side -2 1.20
0.60 -1.44 Diducte for window 20
6 11.90
0.30 21.42 axis x01 - x04 internal side -3 1.60
1.73 -8.30 Diducte for window 1
6 11.90 166.50 m2 TOTAL
0.25 17.85 axis x01 - x04 internal sofft side 2.2 15cm thick HCB
2 27.90
2 13.00 axis Y01&Y05 external side 2.73 152.33 For axis x/02 & x/03
0.30 7.80
1 39.35
8 12.20 axis Y01 to Y05 internal side 2.73 107.43 Add for short side
0.30 29.28
-5 1.40
8 12.20 axis Y01 to Y05 internal sofft side 2.73 -19.11 Diduct for door 2
0.25 24.40
114.49 m2 -2 0.90
2.73 -4.91 Diduct for door 9
283.78 m2 TOTAL
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 24.10
projection 433.80
24.10
14.20 433.80 ml
342.22
Lower =20x1= 20
20 14.20
284.00
575.20 ml
Ver.=1.63+2(1.42+1.21+1.00+0.80
+0.60+0.39+0.18)
20 12.83 =12.83ml
256.60
Diag=2(1.68+1.51+1.35+1.21+1.08
+0.98+0.92)
20 17.46 =17.46ml
349.20
605.80 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
A. Sub Structure 1.6 25cm thick hard core
1. Excavation & Earth Work 1 4.07
1 24.95 1.1 Site clearing 5.72 23.28
15.35 382.98
382.98 m2 1 4.07
1.2 Trench excavation 5.87 23.89
3 22.45 in ordinary soil
0.90 2 4.15
0.30 18.18 5.72 47.48
6 0.15 2 4.15
0.90 5.87 48.72
0.30 0.24
1 2.45
1 22.45 Bulk excavation 5.72 14.01
12.85
0.25 72.12 1 7.00
90.55 m3 1.95 13.65
-6 11.15 251.71 m2
0.40
0.50 (13.38) 2. Concrete work
117.12 m3 Total 3 21.95 2.1 50mm thick lean
146.40 m3 add bulckaeg 25% 395.71m³ 0.50 32.93 concrete.
(29.28) deduction bulckeg 25%
117.12 m3 Total 6 10.85
1.5 Cart away excavated 0.50 32.55
materials 65.48 m2
1 382.98
0.30 114.89 Item No 1.1 2.3 10cm thick RC floor slab C-20
90.55 Item No 1.2 Ditto as item 1.6
205.44 m3 251.71 m2
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
2.4 In gread beam 3. Masonary Work
3 21.95 3.1 Stone masonarry work
0.40 3 21.95 Foundation wall BNGL
0.25 6.58 0.40
0.75 19.76
6 11.60
0.40 6 11.15
0.25 6.96 0.40
13.54 m3 0.75 20.07
2.7 Form work to grade beam 39.83 m3
2 21.95
0.40 17.56 3.2 ditto but above N.G external
left pointed
4 20.45
0.40 32.72 3 21.95
0.40
2 12.35 0.30 7.90
0.40 9.88
6 11.15
10 11.60 0.40
0.40 46.40 0.30 8.03
106.56 m2 15.93 m3
Reinforcement bar
2.11 Dia. 14mm deformation bar
988.38 kg
2.12 Dia. 12mm deformation bar
- kg
2.13 Dia. 8mm deformation bar
2,700.27 kg
10 11.60 116.00
197.80 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
A. Super Structure Reinforcement bar
1. Concrete work 1.8 Dia. 12mm deformation bar
18 2.73 1.1 In elevaation Column 1,078.41 kg
0.20
0.20 1.97 1.9 Dia. 8mm deformation bar
1.97 m3
3 21.95 1.2 In beams 314.97 kg
0.30
0.20 3.95
6 11.75
0.30
0.20 4.23
8.18 m3
FORM WORK TO
1.3 Elevation column
36 2.73
0.25 24.57 18*2=36
36 2.73
0.20 19.66
44.23 m2
1.4 In beams
2 21.95 axis x01& x03 external side
0.30 13.17
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
2.2 15cm thick HCB
2.1. 20CM THICK HCB 1 106.28 Total length of partition wall= 106.28
-2 2.50
2.73 -13.65 Diducte for X/01 & X/03 opening
-6 1.50
1.73 -15.57 Diducte for window 2
-1 1.05
1.73 -1.82 Diducte for window 13
-4 1.20
0.60 -2.88 Diducte for window 26
-1 4.15
0.60 -2.49 Diducte for window 14
158.53 m2 TOTAL
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 23.15
projection 416.70
23.15
13.55 416.70 ml
313.68
Lower =19x1= 20
19 13.55
257.45
521.55 ml
Ver.=1.50+2(1.30+1.10+0.90+0.70
+0.50+0.31)
19 11.12 =11.12ml
211.28
Diag=2(1.58+1.42+1.28+1.14+1.00
+0.95)
19 14.74 =14.74ml
280.06
491.34 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GENERATOR HOUSE 1.6 25cm thick hard core
A. Sub Structure 1 4.92
1. Excavation & Earth Work 3.47 17.07
1 7.40 1.1 Site clearing
5.95 44.03 17.07 m2
44.03 m2
1.2 Trench excavation 2. Concrete work
2 5.90 in ordinary soil 2 5.45 2.1 50mm thick lean
0.90 0.50 5.45 concrete.
0.30 3.19
2 2.95
2 3.45 0.50 2.95
0.90 8.40 m2
0.30 1.86
2.3 10cm thick RC floor slab C-20
5.05 m3 Ditto as item 1.6
17.07 m2
1.4 Fill borrowed materials
Including 0.25 working space 2.4 In gread beam
both sides 2 5.40
0.40
1 5.90 0.25 1.08
4.45
0.50 13.13 2 3.45
deduction masonary wall 0.40
-2 5.40 0.25 0.69
0.40 1.77 m3
0.50 (2.16)
2.7 Form work to grade beam
-2 3.15 2 5.40
0.40 0.40 4.32
0.50 (1.26)
9.71 m3 Total 2 4.90
0.40 3.92
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GENERATOR HOUSE
Reinforcement bar A. Super Structure
2.11 2.6 Dia. 14mm deformation bar 1. Concrete work
4 2.73 1.1 In elevaation Column
538.69 kg 0.20
2.12 2.7 Dia. 12mm deformation bar 0.20 0.44
0.44 m3
- kg
2.13 2.8 Dia. 8mm deformation bar 1.2 In beams
2 5.40
41.71 kg 0.30
0.20 0.65
2.13 10/2cm chip wood expansion joint
6 4.90 29.40 2 4.90
0.30
2 3.45 6.90 0.20 0.59
36.30 ml
1.24 m3
3. Masonary Work FORM WORK TO
3.1 Stone masonarry work 1.4 Elevation column
2 5.40 Foundation wall BNGL 8 2.73
0.40 0.25 5.46 4*2=8
0.75 3.24
8 2.73
2 4.60 0.20 4.37
0.40
0.75 2.76 9.83 m2
6.00 m3
1.5 In beams
3.2 ditto but above N.G external
left pointed 2 5.40 axis x01& x02 external side
0.30 3.24
2 5.40
0.40 2 5.00 axis x01 - x02 internal side
0.15 0.65 0.30 3.00
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GENERATOR HOUSE
2. BLOCK WORK
2 3.95 axis Y01&Y02 external side 2.1 . 20CM THICK HCB
0.30 2.37 2 4.80
2.73 26.21 Add for longer axis
2 3.55 axis Y01 to Y02 internal side
0.30 2.13 2 3.55
2.73 19.38 Add for shortter axis
2 3.55 axis Y01 to Y02 internal sofft side
0.25 1.78 2 5.20 Add for Axis Abave TTB
15.02 m2 0.25 2.60 F & R side
47.48 kg -5 1.10
1.73 -9.52 Diducte for window 7 opening
39.52 m2 TOTAL
Lower =5x1=5
5 5.15
25.75
95.25 ml
Ver.=0.61+2(0.40+0.19 )
5 1.79 =1.79ml
8.95
Diag=2(0.99+0.92 )
5 3.82 =3.82ml
19.10
28.05 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN 1.6 25cm thick hard core
A. Sub Structure 2 5.82
1. Excavation & Earth Work 5.02 58.43
1 31.65 1.1 Site clearing
16.00 506.40 1 5.82
506.40 m2 1.92 11.17
1.2 Trench excavation
4 29.15 in ordinary soil 6 5.75
0.90 5.02 173.19
0.30 31.48
3 5.75
6 0.15 1.92 33.12
0.90
0.30 0.24 2 4.07
5.02 40.86
31.72 m3
1 4.07
1.4 Fill borrowed materials 1.92 7.81
Including 0.25 working space
both sides 324.59 m2
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN
2.7 Form work to grade beam 3. Masonary Work
2 21.95 3.1 Stone masonarry work
0.40 17.56 3 21.95 Foundation wall BNGL
0.40
4 20.45 0.85 22.39
0.40 32.72
6 11.15
2 12.35 0.40
0.40 9.88 0.85 22.75
45.14 m3
10 11.60
0.40 46.40 3.2 ditto but above N.G external
106.56 m2 left pointed
3 21.95
Reinforcement bar 0.40
2.11 2.6 Dia. 14mm deformation bar 0.30 7.90
1,505.58 kg 6 11.15
2.12 2.7 Dia. 12mm deformation bar 0.40
0.30 8.03
- kg 15.93 m3
2.13 2.8 Dia. 8mm deformation bar
2,021.25 kg
10 12.00 120.00
282.90 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN 2. BLOCK WORK
A. Super Structure 4 27.45 2.1. 20cm thick HCB
1. Concrete work 2.73 299.75 Add for axis x/01- x/04
24 2.73 1.1 In elevaation Column
0.20 2 12.20
0.20 2.62 2.73 66.61 Add for axis Y/01 & Y/06
2.62 m3
1.2 In beams 11 5.10
4 28.65 2.73 153.15 Add for axis partition wall
0.30
0.20 6.88 2 28.65 Add for axis X/01 & X/04 Above TTB
0.25 14.33 F &R SIDE
6 11.80
0.30 1 13.00 Add for axis Y/01 & Y/06Above
0.20 4.25 1.80 23.40 TTB Gable side
11.12 m3
FORM WORK TO -4 1.30
1.4 Elevation column 2.73 -14.20 diduct for door 3
48 2.73
0.25 32.76 24*2=48 -2 1.40
2.73 -7.64 diduct for door 2
48 2.73
0.20 26.21 -1 0.90
58.97 m2 2.73 -2.46 diduct for door 6
1.5 In beams
2 28.65 axis x01& x04 external side -6 0.85
0.30 17.19 2.73 -13.92 diduct for door 9
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 18 29.85
projection 537.30
29.85
14.20 537.30 ml
423.87
Lower =25x1= 25
25 14.20
355.00
719.00 ml
Ver.=1.63+2(1.42+1.21+1.00+0.80
+0.60+0.39+0.18)
25 12.83 =12.83ml
320.75
Diag=2(1.68+1.51+1.35+1.21+1.08
+0.98+0.92)
25 17.46 =17.46ml
436.50
757.25 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE 1.6 25cm thick hard core
A. Sub Structure 1 4.90
1. Excavation & Earth Work 2.10 10.29
1 7.40 1.1 Site clearing
4.90 36.26 10.29 m2
36.26 m2
1.2 Trench excavation 2. Concrete work
2 5.90 in ordinary soil 2 5.45 2.1 50mm thick lean
0.90 0.50 5.45 concrete.
0.30 3.19
2 1.95
2 1.90 0.50 1.95
0.90 7.40 m2
0.30 1.03
2.3 10cm thick RC floor slab C-20
4.21 m3 Ditto as item 1.6
10.29 m2
1.4 Fill borrowed materials
Including 0.25 working space 2.4 In gread beam
both sides 2 5.40
0.40
1 5.90 0.25 1.08
3.40
0.50 10.03 2 2.40
deduction masonary wall 0.40
-2 5.40 0.25 0.48
0.40 1.56 m3
0.50 (2.16)
2.7 Form work to grade beam
-2 2.10 2 5.40
0.40 0.40 4.32
0.50 (0.84)
7.03 m3 Total 2 4.90
0.40 3.92
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE
Reinforcement bar A. Super Structure
2.11 2.6 Dia. 14mm deformation bar 1. Concrete work
4 2.73 1.1 In elevaation Column
545.95 kg 0.20
2.12 2.7 Dia. 12mm deformation bar 0.20 0.44
0.44 m3
- kg
2.13 2.8 Dia. 8mm deformation bar 1.2 In beams
2 5.40
110.92 kg 0.30
0.20 0.65
2.13 10/2cm chip wood expansion joint
2 4.90 9.80 2 2.50
0.30
2 2.40 4.80 0.20 0.30
14.60 ml
0.95 m3
3. Masonary Work FORM WORK TO
3.1 Stone masonarry work 1.4 Elevation column
2 5.40 Foundation wall BNGL 8 2.73
0.40 0.25 5.46 4*2=8
0.85 3.67
8 2.73
2 2.10 0.20 4.37
0.40
0.85 1.43 9.83 m2
5.10 m3
1.5 In beams
3.2 ditto but above N.G external
left pointed 2 5.40 axis x01& x02 external side
0.30 3.24
2 5.40
0.40 2 5.00 axis x01 - x02 internal side
0.30 1.30 0.30 3.00
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE
2. BLOCK WORK
2 2.90 axis Y01&Y02 external side 2.1 . 20CM THICK HCB
0.30 1.74 2 5.60
2.73 30.58 Add for longer axis
2 2.50 axis Y01 to Y02 internal side
0.30 1.50 4 3.10
2.73 33.85 Add for shortter axis
2 2.50 axis Y01 to Y02 internal sofft side
0.25 1.25 1 6.00 Add for Axis Abave TTB
13.23 m2 0.25 1.50 Front side
46.77 kg -1 0.90
2.73 -2.46 Diducte for door
-2 0.70
2.73 -3.82 Diducte for door MD10
-1 0.90
1.73 -1.56 Diducte for window
69.49 m2 TOTAL
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-GUARD HOUSE
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 8 6.20
projection 49.60
6.20
5.15 49.60 ml
31.93
Lower =5x1=5
5 5.15
25.75
95.25 ml
Ver.=0.61+2(0.40+0.19 )
5 1.79 =1.79ml
8.95
Diag=2(0.99+0.92 )
5 3.82 =3.82ml
19.10
28.05 ml
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE 1.6 25cm thick hard core
A. Sub Structure 1 4.90
1. Excavation & Earth Work 2.10 10.29
1 7.40 1.1 Site clearing
4.90 36.26 10.29 m2
36.26 m2
1.2 Trench excavation 2. Concrete work
2 5.90 in ordinary soil 2 5.45 2.1 50mm thick lean
0.90 0.50 5.45 concrete.
0.30 3.19
2 1.95
2 1.90 0.50 1.95
0.90 7.40 m2
0.30 1.03
2.3 10cm thick RC floor slab C-20
4.21 m3 Ditto as item 1.6
10.29 m2
1.4 Fill borrowed materials
Including 0.25 working space 2.4 In gread beam
both sides 2 5.40
0.40
1 5.90 0.25 1.08
3.40
0.50 10.03 2 2.40
deduction masonary wall 0.40
-2 5.40 0.25 0.48
0.40 1.56 m3
0.50 (2.16)
2.7 Form work to grade beam
-2 2.10 2 5.40
0.40 0.40 4.32
0.50 (0.84)
7.03 m3 Total 2 4.90
0.40 3.92
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE
Reinforcement bar A. Super Structure
2.11 2.6 Dia. 14mm deformation bar 1. Concrete work
4 2.73 1.1 In elevaation Column
423.98 kg 0.20
2.12 2.7 Dia. 12mm deformation bar 0.20 0.44
0.44 m3
- kg
2.13 2.8 Dia. 8mm deformation bar 1.2 In beams
2 5.40
110.92 kg 0.30
0.20 0.65
2.13 10/2cm chip wood expansion joint
2 4.90 9.80 2 2.50
0.30
2 2.40 4.80 0.20 0.30
14.60 ml
0.95 m3
3. Masonary Work FORM WORK TO
3.1 Stone masonarry work 1.4 Elevation column
2 5.40 Foundation wall BNGL 8 2.73
0.40 0.25 5.46 4*2=8
0.75 3.24
8 2.73
2 2.10 0.20 4.37
0.40
0.75 1.26 9.83 m2
4.50 m3
1.5 In beams
3.2 ditto but above N.G external
left pointed 2 5.40 axis x01& x02 external side
0.30 3.24
2 5.40
0.40 2 5.00 axis x01 - x02 internal side
0.10 0.43 0.30 3.00
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE
2. BLOCK WORK
2 2.90 axis Y01&Y02 external side 2.1 . 20CM THICK HCB
0.30 1.74 2 4.80
2.73 26.21 Add for longer axis
2 2.50 axis Y01 to Y02 internal side
0.30 1.50 2 2.30
2.73 12.56 Add for shortter axis
2 2.50 axis Y01 to Y02 internal sofft side
0.25 1.25 2 5.20 Add for Axis Abave TTB
13.23 m2 0.25 2.60 F & R side
43.92 kg -4 1.10
1.73 -7.61 Diducte for window 2 opening
34.67 m2 TOTAL
PROJECT T.S. No - 04
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-MORGUE
3 Roofing 4.3 Purlin zigba siz 5*7 cm
3.1 G-28 CIS Roof measured in horizon 6 6.20
projection 37.20
6.20
3.90 37.20 ml
24.18
Lower =5x1=5
5 5.15
25.75
45.75 ml
Ver.=0.45+2(0.23)
5 0.91 =0.91ml
4.55
Diag=2(0.93 )
5 1.86 =1.86ml
9.30
13.85 ml
Project -
Location - Block IPD
Bar SUB STRUCTURE Steel Reinforcement
Diamet Schedule
Length of № of Total№
No Location Shape Of bar er Bar № of bars member Bar Total Length (m)
Ф6 Ф8 Ф10 Ф12 Ф14 Ф16 Remark
Slaby/01&y/02,
b/n for axis b/ny/04
x/01&& x/02
y/05 and 8 5.95 31.00 3.00 93.00 553.35
y/06 & y/07 8 5.80 30.00 3.00 90.00 522.00
B/n y/02 & y/03, 8 2.40 13.00 1.00 13.00 31.20
8 5.80 30.00 1.00 30.00 174.00
b/n y/03 & y/04 8 5.85 30.00 2.00 60.00 351.00
and y/05& y/06 8 5.80 30.00 2.00 60.00 348.00
b/n y/07 & y/08 8 4.60 24.00 1.00 24.00 110.40
8 5.80 30.00 1.00 30.00 174.00
Slaby/01&y/02,
b/n for axis b/ny/04
x/02&& x/03 , x/04 & x/05,
y/05 and 8 5.95 31.00 6.00 186.00 1,106.7
y/06 & y/07 8 2.45 13.00 6.00 78.00 191.10
B/n y/02 & y/03, 8 2.40 13.00 2.00 26.00 62.40
8 2.45 13.00 2.00 26.00 63.70
b/n y/03 & y/04 8 5.85 30.00 4.00 120.00 702.00
and y/05& y/06 8 2.45 13.00 4.00 52.00 127.40
b/n y/07 & y/08 8 4.60 24.00 2.00 48.00 220.80
8 2.45 13.00 2.00 26.00 63.70
Slaby/01&y/02,
b/n for axis b/ny/04
x/03&& x/04
y/05 and 8 5.95 31.00 3.00 93.00 553.35
y/06 & y/07 8 7.15 37.00 3.00 111.00 793.65
B/n y/02 & y/03, 8 2.40 13.00 1.00 13.00 31.20
8 7.15 37.00 1.00 37.00 264.55
b/n y/03 & y/04 8 5.85 30.00 2.00 60.00 351.00
and y/05& y/06 8 7.15 37.00 2.00 74.00 529.10
b/n y/07 & y/08 8 4.60 24.00 1.00 24.00 110.40
8 7.15 37.00 1.00 37.00 264.55
Total Length(m) 7699.55
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58
TotalWeight(Kg) 3041.32 -
on axis y/01/y/02,
y/03,y04,y/05,y/06
y/07,y/08,y/09
Stirrup 8 1.20 21.00 16.00 336.00 403.20
8 1.20 13.00 8.00 104.00 124.80
Total Length(m) 1363.20 1,462.92
Weight(Kg/m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47
TotalWeight(Kg) 538.46 1,770.13
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-1 IPD 2. Concrete work
A. Sub Structure 5 38.60 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 96.50 concrete.
41.50 1.1 Site clearing
21.55 894.33 8 14.45
0.50 57.80
894.33 m2 154.30 m2
1.2 Trench excavation 2.4 In gread beam
5 39.00 in ordinary soil 5 38.50
0.90 0.40
0.30 52.65 0.25 19.25
8 14.55
0.90 8 15.35
0.30 31.43 0.40
0.25 12.28
1 39.00 Bulk excavation 31.53 m3
19.05 2.7 Form work to grade beam
0.30 222.89 2 38.50
306.96 m3 0.40 30.80
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
IPD
3. Masonary Work
3.1 Stone masonarry work
5 38.00 Foundation wall BNGL
0.40
0.85 64.60
8 16.55
0.40
0.85 45.02
109.62 m3
5 38.00
0.40
0.30 22.80
8 16.55
0.40
0.30 15.89
38.69 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD 2. Concrete work
A. Sub Structure 4 35.20 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 70.40 concrete.
1 35.60 1.1 Site clearing
14.20 505.52 8 9.30
0.50 37.20
505.52 m2 107.60 m2
2.4 In gread beam
4 35.10
1.2 Trench excavation 0.40
4 35.60 in ordinary soil 0.25 14.04
0.90
0.30 38.45 8 10.20
0.40
8 11.70 0.25 8.16
0.90 22.20 m3
0.30 25.27 2.7 Form work to grade beam
2 35.10
63.72 m3 0.40 28.08
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
Block-0PD
3. Masonary Work
3.1 Stone masonarry work
4 35.10 Foundation wall BNGL
0.40
0.85 47.74
8 9.60
0.40
0.85 26.11
73.85 m3
4 35.10
0.40
0.30 16.85
8 9.60
0.40
0.30 9.22
26.06 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE 2. Concrete work
A. Sub Structure 2 17.00 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 17.00 concrete.
1 20.00 1.1 Site clearing
9.20 184.00 5 5.30
184.00 m2 0.50 13.25
1.2 Trench excavation 30.25 m2
2 17.50 in ordinary soil 2.3 In gread beam
0.90 2 17.00
0.90 28.35 0.40
0.25 3.40
5 4.80
0.90 5 5.70
0.90 19.44 0.40
0.25 2.85
1 20.00 Bulk excavation 6.25 m3
6.90 2.4 Form work to grade beam
0.20 27.60 2 17.00
75.39 m3 0.40 13.60
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-STAFF RESIDENCE
3. Masonary Work
3.1 Stone masonarry work
2 17.00 Foundation wall BNGL
0.40
0.85 11.56
5 5.20
0.40
0.85 8.84
20.40 m3
2 17.00
0.40
0.39 5.30
5 5.20
0.40
0.39 4.06
9.36 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER 2. Concrete work
A. Sub Structure 2 17.00 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 17.00 concrete.
1 20.00 1.1 Site clearing
6.90 138.00 5 2.90
138.00 m2 0.50 7.25
1.2 Trench excavation 24.25 m2
2 17.50 in ordinary soil 2.3 In gread beam
0.90 2 17.00
0.90 28.35 0.40
0.25 3.40
5 2.60
0.90 5 3.40
0.90 10.53 0.40
0.25 1.70
1 20.00 Bulk excavation 5.10 m3
6.90 2.4 Form work to grade beam
0.20 27.60 2 17.00
66.48 m3 0.40 13.60
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-SERVIC QUARTER
3. Masonary Work
3.1 Stone masonarry work
2 17.00 Foundation wall BNGL
0.40
0.85 11.56
5 3.40
0.40
0.85 5.78
17.34 m3
3.2 ditto but above N.G external
left pointed
2 17.00
0.40
0.39 5.30
5 3.40
0.40
0.39 2.65
7.96 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR 2. Concrete work
A. Sub Structure 4 42.85 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 85.70 concrete.
1 45.85 1.1 Site clearing
19.35 887.20 9 14.35
887.20 m2 0.50 64.58
1.2 Trench excavation 150.28 m2
4 43.35 in ordinary soil 2.3 In gread beam
0.90 4 42.85
0.90 140.45 0.40
0.25 17.14
9 13.25
0.90 9 15.35
0.90 96.59 0.40
0.25 13.82
1 45.85 Bulk excavation 30.96 m3
19.35 2.6 Form work to grade beam
0.25 221.80 2 42.85
458.85 m3 0.40 34.28
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-OR
3. Masonary Work
3.1 Stone masonarry work
4 42.85 Foundation wall BNGL
0.40
0.85 58.28
9 14.75
0.40
0.85 45.14
103.41 m3
4 42.85
0.40
0.32 21.94
9 14.75
0.40
0.32 16.99
38.93 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
A. Sub Structure 1 10.75
1. Excavation & Earth Work 10.10
1 26.30 1.1 Site clearing 0.60 65.15
14.35 377.41 deduction masonary wall
-4 23.30
1 12.00 0.40 Emergency
12.60 151.20 0.60 (22.37)
528.61 m2
-6 14.75 Emergency
1.2 Trench excavation 0.40
4 23.80 in ordinary soil 0.60 (21.24)
0.90 Emergency
0.30 25.70 -3 10.50
0.40 Waiting
6 8.25 Emergency 0.60 (7.56)
0.90
0.30 13.37 -3 8.40 Waiting
0.40
1 23.80 Bulk excavation Emergency 0.60 (6.05)
11.85 177.15 m3 Total
0.25 70.51 221.43 m3 add bulckaeg 25% 125.61m³
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-EMERGENCY&WAITING
2.4 In gread beam 3 8.85
4 42.85 0.40 10.62
0.40 281.90 m2
0.25 17.14 Reinforcement bar
2.12 Dia. 14mm deformation bar
9 15.35 1,946.44 kg
0.40 2.13 Dia. 8mm deformation bar
0.25 13.82 590.84 kg
2.14 Dia. 12mm deformation bar
3 10.50 kg
0.40 3. Masonary Work
0.25 3.15 4 23.30 3.1 Stone masonarry work
0.40 Foundation wall BNGL
3 8.85 0.85 31.69
0.40 6 14.75
0.25 2.66 0.40
36.76 m3 0.85 30.09
3 10.60
2.8 Form work to grade beam 0.40
2 42.85 0.85 10.81
0.40 34.28 3 8.40
0.40
6 40.60 0.85 8.57
0.40 97.44 81.16 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION 2. Concrete work
A. Sub Structure 4 23.00 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 46.00 concrete.
1 25.90 1.1 Site clearing
18.00 466.20 5 11.10
466.20 m 2
0.50 27.75
1.2 Trench excavation 73.75 m2
4 23.40 in ordinary soil 2.3 In gread beam
0.90 4 22.90
0.90 75.82 0.40
0.25 9.16
5 11.50
0.90 5 12.00
0.90 46.58 0.40
0.25 6.00
1 23.40 Bulk excavation 15.16 m3
13.50 2.7 Form work to grade beam
0.20 63.18 2 22.90
185.57 m3 0.40 18.32
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-ADMINSTRATION
3. Masonary Work
3.1 Stone masonarry work
4 22.90 Foundation wall BNGL
0.40
0.85 31.14
5 11.40
0.40
0.85 19.38
50.52 m3
4 22.90
0.40
0.10 3.66
5 11.40
0.40
0.10 2.28
5.94 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC 2. Concrete work
A. Sub Structure 3 21.95 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 32.93 concrete.
1 24.95 1.1 Site clearing
15.35 382.98 6 10.85
382.98 m2 0.50 32.55
1.2 Trench excavation 65.48 m2
3 22.45 in ordinary soil 2.4 In gread beam
0.90 3 21.95
0.30 18.18 0.40
0.25 6.58
6 0.15
0.90 6 11.60
0.30 0.24 0.40
0.25 6.96
1 22.45 Bulk excavation 13.54 m3
12.85 2.7 Form work to grade beam
0.25 72.12 2 21.95
90.55 m3 0.40 17.56
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-DIAGNOSTIC
3. Masonary Work
3.1 Stone masonarry work
3 21.95 Foundation wall BNGL
0.40
0.85 22.39
6 11.15
0.40
0.85 22.75
45.14 m3
3 21.95
0.40
0.30 7.90
6 11.15
0.40
0.30 8.03
15.93 m3
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN 2. Concrete work
A. Sub Structure 3 21.95 2.1 50mm thick lean
1. Excavation & Earth Work 0.50 32.93 concrete.
1 31.65 1.1 Site clearing
16.00 506.40 6 10.85
506.40 m 2
0.50 32.55
1.2 Trench excavation 65.48 m2
4 29.15 in ordinary soil 2.4 In gread beam
0.90 3 21.95
0.30 31.48 0.40
0.25 6.58
6 0.15
0.90 6 11.60
0.30 0.24 0.40
0.25 6.96
1 22.45 Bulk excavation 13.54 m3
12.85 2.7 Form work to grade beam
0.25 72.12 2 21.95
103.85 m3 0.40 17.56
PROJECT T.S. No - 01
CLIENT DATE - PAGE -
No Factor Amount Descriptions No Factor Amount Descriptions
BLOCK-KITCHEN
3. Masonary Work
3.1 Stone masonarry work
3 21.95 Foundation wall BNGL
0.40
0.85 22.39
6 11.15
0.40
0.85 22.75
45.14 m3
3 21.95
0.40
0.30 7.90
6 11.15
0.40
0.30 8.03