The document outlines the construction specifications for a two-storey residential unit, detailing earthwork, concrete works, masonry works, reinforcement, formworks, and roofing. It includes measurements for excavation, concrete footings, columns, beams, and various materials required for the project. Additionally, it provides quantities and rates for different construction elements, ensuring a comprehensive overview of the building process.

Uploaded by

jayrmn27
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views23 pages

Group-1-QS

The document outlines the construction specifications for a two-storey residential unit, detailing earthwork, concrete works, masonry works, reinforcement, formworks, and roofing. It includes measurements for excavation, concrete footings, columns, beams, and various materials required for the project. Additionally, it provides quantities and rates for different construction elements, ensuring a comprehensive overview of the building process.

Uploaded by

jayrmn27
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

2 STOREY RESIDENTIAL UNIT

ITEMS DESCRIPTION
EARTHWORK
Length Width Depth
Excavation
Bulk Excavation Foundation 1.6 1.5 1.5
Septic Tank 2.35 3 2.5
Trimming 14.3 0.8 1.2

FTB 3.6 0.2 0.3


3.8 0.2 0.3
4 0.2 0.3
2.9 0.2 0.3

WALL FOOTING 2.9 0.4 0.2


3.4 0.4 0.2

Backfill and Compaction


Gravel Bedding FOUNDATION 1.6 1.5 1
WALL FOOTING 2.9 0.4 0.1
3.4 0.4 0.1
SLAB ON GRAD 12 10 0.1
FOUNDATION

1) Concrete Works Length Width Depth


(a) Footing F1 1.6 1.6 0.3
F2 1.6 1.6 0.35
(b) Column - Up to Ground Level C1 0.4 0.25 1.2
C2 0.4 0.25 1.2

(c) Footing Tie Beam FTB 3.35 0.2 0.3


FTB 2.1 0.2 0.3
FTB 3 0.2 0.3
FTB 3.3 0.2 0.3
FTB 3.5 0.2 0.3
Cement
Sand
Gravel
2) Masonry Works
(a) Septic Tank Length Depth
CHB 13.5 2.5
Mortar
Cement
Sand
(c) Plastering
Cement
Sand
3) Reinforcemenet
(a) Footing
16 mm dia. Steel Bar Length Qty. in L Qty. in W
F1 1.45 8 8
F2 1.45 8 11
F3 1.45 11 8
F4 1.45 11 11
F5 1.45 11 8
Tie Wire Qty. in L Qty. in W
8 8
(b) Columns Qty. of Colu# of Main Bar
Qty. of Bar
16 mm dia. Steel Bar C1 3 8 24
C2 10 8 80

Qty. of Ties Qty. of Col Total Ties


10 mm dia. Steel Bar C1 10 3 30
C2 10 10 100
Tie Wire Qty. of Qty.
Barsof Lateral Ties
8 20
(c) Footing Tie Beam L Bot Bar Top Bar
16 mm dia. Steel Bar FTB 3.93 3 3
2.68 3 3
4.13 3 3
3.58 3 3
4.33 3 3
12 mm dia. Steel Bar 3.6 1 1
2.9 1 1
3.8 1 1
3.8 1 1
4 1 1
10 mm dia. Steel Bar Total Stir
532

4) Formworks Length Width Height


(a) Footing 1.6 1.6 0.35
(b) Columns C1 & C2 0.4 0.25 1.5
(c) FTB FTB 3.35 0.2 0.3
FTB 2.1 0.2 0.3
FTB 3 0.2 0.3
FTB 3.3 0.2 0.3
FTB 3.5 0.2 0.3

GROUNDFLOOR

1) Concrete Works Length Width Depth


(a) Column - Up to Ground Level C1 0.4 0.25 3.4
C2 0.4 0.25 3.4

(b) Beam G1 5.45 0.2 0.4


G2 6.75 0.2 0.4
B1 3.2 0.2 0.35
B1 5.8 0.2 0.35
B2 7.35 0.2 0.4
B3 1.475 0.2 0.3
CB1 1 0.2 0.4
(c) Slab SLAB ON GRAD 12 10 0.05
S1 3.35 3 0.1
S1 1.925 3.3 0.1
S1 1.475 1.75 0.1
S2 3.35 3 0.1
S2 2.1 3.3 0.1
S3 2.1 3.75 0.1
S4 2.325 3.75 0.1
S5 1.225 4 0.1
S6 6.7 1 0.1
(d) Stair RISE 1 0.2 0.25
LANDING 1 1 0.15
Cement
Sand
Gravel

(e) Plastering Total Area


Cement 210
Sand 210

2) Reimforcement
(a) Column Qty. of Colu# of Main Bar
Qty. of Bar
16 mm dia. Steel Bar C1 3 8 24
C2 10 8 80
10 mm dia. Steel Bar Qty. of Ties Qty. of Col Total Ties
C1 26 3 78
C2 26 10 260
(b) Beam L of Main Bot Bar Top Bar
16 mm dia. Steel Bar G1 2.68 3 5
3.58 3 5
3.93 3 5
4.33 3 5
G2 4.13 6 5
3.58 6 5
4.33 6 5
B1 3.88 3 2
3.48 3 2
4.38 3 2
B3 1.905 3 2
CB1 1.58 3 2
12 mm dia. Steel Bar G1 2.9 1 1
3.8 1 1
3.6 1 1
4 1 1
G2 3.8 1 1
3.8 1 1
4 1 1
10 mm dia. Steel Bar Total Stir
G1 282
G2 298
B1 100
B3 12
CB1 8

(c) Slab On Grade Length Qty. of RebarPcs/Reba


10 mm dia. Steel Bar 12 40 1
10 33 1
(d) Slab

(e) Stairs

3) Formworks Length Width Height


(a) Columns C1 & C2 0.4 0.25 3.7
(b) Beam G1 18.3 0.2 0.3
G2 15.75 0.2 0.3
B1 9.3 0.2 0.3
B2 6.6 0.2 0.3
B3 1.975 0.2 0.3

Masonry Works Length Width Total Area


4) (a) CHB Interior 20.85 3.7 77.145
Exterior 27.95 3.7 103.415
(b) Mortar 180.56
Cement
Sand
28.44032

Tile Work FLOOR AREATILE AREA


5) (a) Qty of Tiles 103 0.36
(b) Cement Mortar
Cement
Sand
(c) Cement Filler

Paint Work Total Area


4 (a) Wall Paint 210
Neutralizer
Concrete Primer
Acrylic Latyx Paint
(b) Roof Paint

SECOND FLOOR

Concrete Works Length Width Depth


1) (a) Column - Up to Ground Level C1 0.4 0.25 2.4
C2 0.4 0.25 2.4
C2 0.3 0.2 1.6
PC 0.3 0.2 1.6

(b) Beam RG1 6.5 0.2 0.3


RG1 2.325 0.2 0.3
RG1 3.8 0.2 0.3
RG1 4 0.2 0.4
RB1 2.325 0.2 0.3
RC1 2.4 0.2 0.4
(c) Plastering Total Area
Cement 217
Sand 217

Reimforcement
2) (a) Column Qty. of Colu# of Main Bar
Qty. of Bar
16 mm dia. Steel Bar C1 3 8 24
C2 10 8 80
C2 10 6 60
PC 3 6 18
10 mm dia. Steel Bar Qty. of Ties Qty. of Col Total Ties
C1 26 3 78
C2 26 10 260
C2 16 10 160
PC 16 10 160
(b) Beam L of Main Bot Bar Top Bar
16 mm dia. Steel Bar RG1 2.68 3 3
3.58 3 3
3.93 3 3
4.33 3 3
RG1 4.13 3 3
2.105 3 3
2.18 3 3
4.33 3 3
RB1 3.88 3 2
3.48 3 2
4.38 3 2

12 mm dia. Steel Bar RRG1 2.68 1 1


3.58 1 1
3.93 1 1
4.33 1 1
4.13 1 1
2.105 1 1

10 mm dia. Steel Bar Total Stir


RG1 428
RC1 13

Formworks Length Width Height


3) (a) Column C1 & C2 0.4 0.25 3.7
(b) Beams RG1 18.3 0.2 0.3
RG2 15.75 0.2 0.3
RB1 9.3 0.2 0.3

Masonry Works Length Width Total Area


4) (a) CHB Interior 20.5 2.7 55.35
Exterior 37.85 2.7 102.195
(b) Mortar 157.545
Cement
Sand

Tile Work FLOOR AREATILE AREA


5) (a) Qty of Tiles 98 0.36
(b) Cement Mortar
Cement
Sand
(c) Cement Filler

Paint Work Total Area


6) (a) Wall Paint 217
Neutralizer
Concrete Primer
Acrylic Latyx Paint
(b) Roof Paint

ROOFING
(a) Longspan Rib Type Roof Length Width
Main Roof
Secondary Roof 8.15 8.85
2.75 7.75
(b) Polycarbonate Sheet 3.65 0.6

(c) Rafters Spacing


Length of Rafters
Width
[in m]
[of roof]
Main Roof 0.6 141.6 8.85
Secondary Roof 0.6 105.7 7.55

(d) Purlins Spacing


Length of Purlins [m]
Upper Roof 0.6 8.15
Lower Roof 0.6 2.75

(e) Sag Rod


Upper Roof
Lower Roof

(f) Gutter Length Width


Main Roof 8.15 8.85
Secondary Roof 2.75 7.75

(g) Downspouts
Ground Floor
1st Floor
Roof
UNIT QTY RATE

# Total

13 46.8 m3 64.425
1 17.625
17 233.376
m3 4.23
3 0.648
7 1.596
4 0.96
3 0.522

1 0.232
1 0.272

13 31.2 m3 31.452
1 0.116
1 0.136
1 12

Qty Total
4 3.072 m3 13.824 4,563.96
12 10.752
3 0.36 m3 1.56 4,563.96
10 1.2

6 1.206 m3 3.18 4,563.96


3 0.378
2 0.36
2 0.396
4 0.84
167.076 bags 180
9.282 m3 10
18.564 m3 19

Area Qty
33.75 421.875 pcs 430 15
33.75
7.29 bags 8
0.405 m3 0.5

33.75 4.86 bags 4


33.75 0.405 m3 0.5
Qty. of FoTotal Qty.Pcs/6M Qty. of 6 Total kg 540.36 45
6 96 4 23 57
3 57 4 14
2 38 4 9
1 22 4 5
1 19 4 5
Qty. of FoLength ofTotal KL kg 5 80
13 249.6 5
Length/pcTotal Qty.Pcs/6M Qty. of 6 Total
1.917 3.12989 3 8 35 kg 328.64
1.917 3.12989 3 27

Rebar LenPc/6m Qty. of 6m Rebar Total


1.3 4.615385 8 33 kg 120.315
1.3 4.615385 25
Qty. of C Length ofTotal KL kg 16 80
13 832 16
Qty. of B Total Mai PC/9m QTY. OF Total
3 18 2.290076 9 48 kg 682.56 45
3 18 3.358209 6 45
3 18 2.179177 9
4 24 2.513966 12
4 24 2.078522 12
3 6 2.5 3 16 kg 128.16 45
3 6 3.103448 2
3 6 2.368421 3
4 8 2.368421 4
4 8 2.25 4
Rebar LenPc/6m Qty. of 6m Rebar Total kg 590.8392 45
1.2 5 106 106

Qty Area of Forms


52 29.12 m2 29.12
13 29.25 10.15625 m2 29.25 45
6 16.08 5.583333 m2 42.4
3 5.04 1.75
2 4.8 1.666667
2 5.28 1.833333
4 11.2 3.888889

Qty Total
3 1.02 m3 4.42
10 3.4

3 1.308 m3 6.861
5 2.7
2 0.448
2 0.812
2 1.176
2 0.177
3 0.24
1 6 m3 13.42075
2 2.01
1 0.63525
1 0.258125
1 1.005
1 0.693
1 0.7875
1 0.871875
1 0.49
1 0.67
17 0.85 m3 1
1 0.15
231.3158 bags 550
12.85088 m3 35
25.70175 m3 65

Qty
30.24 bags 35
2.52 m3 3

Length/pcTotal Qty.Pcs/6M Qty. of 6 Total


4.6 1.304348 1 24 85 kg 808.96
4.6 1.304348 1 61
Rebar LenPc/6m Qty. of 6m Rebar Total kg 312.819
1.3 4.615385 20 85
1.3 4.615385 65
Qty. of B Total Mai PC/9m QTY. OF Total 40
3 24 3.358209 8 32 kg 881.64
1 8 2.513966 4 40
3 24 2.290076 12
2 16 2.078522 8
3 33 2.179177 16.5 45
3 33 2.513966 16.5 40
2 22 2.078522 11
2 10 2.319588 5 10
1 5 2.586207 1.666667
1 5 2.054795 2.5
1 5 4.724409 1.25 2
3 15 5.696203 3.75 4
3 6 3.103448 2 8 kg 424.53
1 2 2.368421 1
3 6 2.5 3
2 4 2.25 2
3 6 2.368421 3 45
3 6 2.368421 3 40
2 4 2.25 2
Rebar LenPc/6m Qty. of 6m Rebar Total kg 571.959
1.2 5 56 155
1.3 4.615385 75
1.1 5.454545 20
1 6 2
1.2 5 2 40

Qty. of 6 Total
40 40 kg 379.2
28 28

Qty Area of Forms


13 72.15 25.05208 m2 72.15
1 14.64 5.083333 m2 41.54
1 12.6 4.375
1 7.44 2.583333
1 5.28 1.833333
1 1.58 0.548611

Total Area pcs 2270


964.3125
1292.688

39.00096 bags 48
2.16672 m3 3

QTY OF TILES pcs 343


286.1111

29.664 bag 30
1.648 m3 2
51.5 kilo 52

Qty.
m2 464
6
6
6

# Total
3 0.72 m3 5.04
10 2.4
10 0.96
10 0.96

3 1.17 m3 4.2285
1 0.1395
4 0.912
3 0.96
2 0.279
4 0.768
Qty
31.248 bags 35
2.604 m3 3

Length/pcTotal Qty.Pcs/6M Qty. of 6 Total


4.6 1.304348 1 24 145 kg 1375.864
4.6 1.304348 1 61
4.6 1.304348 1 46
4.6 1.304348 1 14
Rebar LenPc/6m Qty. of 6m Rebar Total kg 608.979
1.3 4.615385 20 165
1.3 4.615385 65
1.3 4.615385 40
1.3 4.615385 40
Qty. of B Total Mai PC/9m QTY. OF Total
3 18 3.358209 6 33 kg 711
3 18 2.513966 9
3 18 2.290076 9
3 18 2.078522 9
3 18 2.179177 9 32
2 12 4.275534 6
2 12 4.12844 6
2 12 2.078522 6
2 10 2.319588 5 10
1 5 2.586207 1.666667
1 5 2.054795 2.5

3 6 3.358209 2 16 kg 128.16
3 6 2.513966 3
3 6 2.290076 3
3 6 2.078522 3
3 6 2.179177 3
2 4 4.275534 2

Rebar LenPc/6m Qty. of 6m Rebar Total kg 440.484013


1.2 5 86 119
1.3 4.615385 3

Qty Area of Forms


13 72.15 25.05208 m2 72.15
1 14.64 5.083333 m2 34.68
1 12.6 4.375
1 7.44 2.583333

Total Area pcs 2785


691.875
1277.438

34.02972 bags 35
1.89054 m3 1

QTY OF TILES pcs 328


272.2222

28.224 bag 30
1.568 m3 2
49 kilo 52

Qty.
m2 464
6.2
6.2
6.2
Area Qty Total

72.1275
21.3125 93.44 3.6 25.95556 pcs 26
2.19 2.19 0.048 45.625 pcs 46

idth [of roof]


16 15.75 pcs 16
14 13.91667 pcs 14

Total [in m]
15 122.25 14.58333 pcs 15
6 16.5 5.583333 pcs 6

15 pcs 15
6 pcs 6

Perimeter
17 7 6.967213 pcs 7
10.5 5 4.303279 pcs 5

6 pcs 5
6 pcs 6
5 pcs 6
AMOUNT

63092.18

7119.778

14513.39

6450
24316.2

400

1280

14788.8
5414.175

30715.2

5767.2

26587.76
32358.4

12512.76

35265.6
16981.2

22878.36

`
.
Project: PROPOSED 2-Storey Residential Area

BILL OF MATERIALS

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST AMOUNT


A MOBILIZATION
B CLEARING OF AREA
C CLEARING OF DEMOLISHED DEBRIS
D ENCLOSURE OF AREA
Sub-total -
E EARTHWORKS
E.1 EXCAVATION
1 Footings
E.2 BACKFILLING / FILLING& COMPACTING
1 Gravel Fill (G1) 7.66 cu.m. 1250 9,570.00
Sub-total 9,570.00
F FORMWORKS & SCAFFOLDINGS 2,500.00
G CONCRETE WORKS
G.1 CONCRETE FOOTINGS
1 Portland Cement 125.00 bags. 240.00 30,000.00
2 Screened sand 7.00 cu.m. 1200.00 8,400.00
3 ¾” Gravel 14.00 cu.m. 1500.00 21,000.00
4 16mm Ø Reinforced Steel B 57.00 pcs. 426.00 24,282.00
5 #16 G.I. Tie Wire 5.00 kgs. 80.00 400.00
G.2 CONCRETE COLUMNS
1 Portland Cement 100.00 bags. 285.00 28,500.00
2 Screened sand 5.00 cu.m. 1200.00 6,000.00
3 ¾” Gravel 11.00 cu.m. 1200.00 13,200.00
4 16mm Ø Reinforced Steel ba 35.00 pcs. 330.00 11,550.00
5 10mm Ø Reinforced Steel ba 33.00 pcs. 190.00 6,270.00
6 #16 G.I. Tie Wire 16.00 kgs. 80.00 1,280.00
G.3 WALL FOOTING
1 Portland Cement 28.00 bags 285.00 7,980.00
2 Screened sand 2.00 cu.m. 1250.00 2,500.00
3 ¾” Gravel 4.00 cu.m. 1200.00 4,800.00
4 10mm Ø Reinforced Steel ba 44.00 pcs. 330.00 14,520.00
5 #16 G.I. Tie Wire 10.00 kgs. 80.00 800.00
G.4 CONCRETE BEAMS
1 Portland Cement 23.00 bags 285.00 6,555.00
2 Screened sand 2.00 cu.m. 1250.00 2,500.00
3 ¾” Gravel 3.00 cu.m. 1200.00 3,600.00
4 12mm Ø Reinforced Steel ba 44.00 pcs. 330.00 14,520.00
5 10mm Ø Reinforced Steel ba 33.00 pcs. 130.00 4,290.00
6 #16 G.I. Tie Wire 15.00 kgs. 80.00 1,200.00
G.6 SLAB ON GRADE
1 Portland Cement 63.00 bags 285.00 17,955.00
2 Screened sand 4.00 cu.m. 1250.00 5,000.00
3 ¾” Gravel 7.00 cu.m. 1200.00 8,400.00
4 10mm Ø Reinforced Steel ba 62.00 pcs. 190.00 11,780.00
5 #16 G.I. Tie Wire 15.00 kgs. 80.00 1,200.00
G.7 CHB WALL& PLASTERING
1 CHB 4" 1696.00 nos 15.00 25,440.00
2 Cement 230.00 bags 285.00 65,550.00
3 Screened Sand 6.00 cu.m 1250.00 7,500.00
4 Fine Sand 7.00 cu.m 1400.00 9,800.00
5 Tie wire G.I. #16 10.00 kls 80.00 800.00
6 10mmØ x 6m RSB 93.00 pcs 190.00 17,670.00
Sub-total 280,940.00
H ROOF & ROOF FRAMING
1 2"x4" Rafter 184 bd.ft 40.00 7,369.07
2 2"x2" Braces & Purlins 11 bd.ft 40.00 437.33
3 1"x10" Fascia Board 49 bd.ft 40.00 1,941.76
4 Asstd. Nails (Kgs.) 8 kgs. 60.00 480.00
5 Long Span Deck (pre painted 13 sheets 2,476.40 32,193.20
6 Pre-formed spanish ridge rol 11.10 mts 250.00 2,775.00
7 Umbrella Nails 2.00 kls. 80.00 160.00
8 Vulca seal 1.00 tube 75.00 75.00
Sub-total 45,431.36
I CEILING WORKS
1 Insulation foam (meter leng 63.0 mts 70.00 4,410.00
Sub-total 4,410.00
J PAINTING WORKS
1 Concrete Neutralizer 5 gals 415.00 1,937.75
2 Boysen Flat Latex White 1 pail 3,200.00 3,735.42
3 Boysen Semi-gloss Latex top 1 pail 3,700.00 4,319.08
5 Masonry putty 1 pail 1,200.00 1,400.78
7 Painting accessories 5 sets 800.00 4,000.00
8 Sand paper (assorted) 10 pcs 150.00 1,500.00
Sub-total 16,893.04
K TILE WORKS
1 Room floor tiles porcelain ti 39.00 pcs 190.00 7,410.00
2 Toilet floor ceramic tiles (30 51.00 pcs 100.00 5,100.00
3 Kitchen counter ceramic tile 22.00 pcs 70.00 1,540.00
4 ABC Tile Adhesive or equiva 20.00 bags 270.00 5,400.00
Sub-total 19,450.00
L PLUMBING
1 1/2"Ø PVC Pipe (blue) 4.00 pcsx3m 90.00 360.00
2 1/2" coupling (blue) 3.00 pcs 20.00 60.00
3 1/2" Elbow (blue) 6.00 pcs 20.00 120.00
4 1/2" Tee (blue) 2.00 pcs 25.00 50.00
5 Gate Valve 1/2" (Falcon) 1.00 pc 400.00 400.00
6 4" pipe (orange) 5.00 pcsx3m 550.00 2,750.00
7 4" elbow 45° (orange) 2.00 pcs 160.00 320.00
8 4" elbow 90° (orange) 1.00 pcs 160.00 160.00
9 4" Wye (orange) 1.00 pcs 160.00 160.00
10 4" Cleanout cap 1.00 pcs 80.00 80.00
11 4" Tee (orange) 1.00 pcs 170.00 170.00
12 2" pipe (orange) 4.00 pcsx3m 225.00 900.00
13 2" elbow 90° (orange) 5.00 pcs 45.00 225.00
14 2" Wye (orange) 1.00 pcs 160.00 160.00
15 PVC Solvent 2.00 cans 70.00 140.00
Septic Vault 0.00
16 Cement 52.00 bags 270.00 14,040.00
17 Sand 5.00 cu.m 1,250.00 6,250.00
18 Gravel 2.50 cu.m 1,200.00 3,000.00
19 Fine Sand 1.00 cu.m 1,400.00 1,400.00
20 CHB 4" 428.00 pcs. 15.00 6,420.00
21 12mmØ x 6m RSB 268.00 nos. 190.00 50,920.00
22 4" pipe (orange) 3.00 pcs 550.00 1,650.00
23 4" Tee (orange) 7.00 pcs 180.00 1,260.00
24 Kitchen Sink/faucet/fittings 1.00 sets 2,500.00 2,500.00
25 Water closet & accessories 1.00 set 6,000.00 6,000.00
26 Shower & accessories 1.00 set 2,500.00 2,500.00
27 Lavatory/Fittings/faucet 1.00 set 2,500.00 2,500.00
28 Floor drain 1.00 set 500.00 500.00
29 Tissue holder 1.00 set 500.00 500.00
30 Soap holder 1.00 set 500.00 500.00
Sub-total 105,995.00
M DOORS AND WINDOWS
1 D1 - 2.4x2.3m Fabricated P 1.00 set 1,500.00 1500.00
2 D2 - 0.8x2.1m Fabricated P 5.00 sets 5,000.00 25000.00
3 D3 - 0.7x2.1m Fabricated P 2.00 sets 1,800.00 3600.00
4 Door jambs 8.00 sets 1,500.00 12000.00
5 W1 - 1.8x1.5m Fabricated 1.00 set 500.00 500.00
6 W2 - 1.5x1.2m Fabricated 2.00 sets 500.00 1000.00
7 W3 - 2.9x1.3m Fabricated 2 1.00 set 1,000.00 1000.00
8 W4 - 1.0x1.5m Fabricated 1.00 set 500.00 500.00
9 Door Knobs 8.00 sets 800.00 6400.00
10 Door hinges 21.00 sets 150.00 3150.00
Sub-total 54,650.00
O ELECTRICAL
1 Panel Board 3 branches 11.00 pcs 350.00 3850.00
2 Circuit breaker 60amp 0.00 pcs 400.00 0.00
3 Circuit breaker 15amp 2.00 pcs 350.00 700.00
4 2.0mm2 TW Cu. Wire 40.00 boxes 500.00 20000.00
5 3.5mm2 TW Cu. Wire 20.00 boxes 500.00 10000.00
6 1/2"Ø PVC electrical pipes 6.00 pcsx3m 150.00 900.00
7 1/2" elbow 3.00 pcs 15.00 45.00
8 1/2" PVC clamp 12.00 pcs 3.00 36.00
9 Junction box 3.00 pcs 50.00 150.00
10 utility box 9.00 pcs 40.00 360.00
11 duplex outlets 4.00 pcs 85.00 340.00
12 1-gang switch 6.00 pcs 60.00 360.00
13 3-gang switch 1.00 pcs 85.00 85.00
14 Electrical tape 5.00 pcs 35.00 175.00
15 pvc solvent 2.00 cans 80.00 160.00
Sub-total 37,161.00
P POWER TOOLS
Q CLEARING
R Material Cost 577,000.40
S Contengencies
T Labor Cost
U Supervison Fee
V TOTAL PROJECT COST Php577,000.40

Prepred by:

Engr. Michael John A. Apgao


PRC # 094128