SN Para No Ref. document details
5 307(8) 3.05 As per Railway Board’s Lr. No. 2018/W-I/Genl./Land
Acquisition/ Pt I dt. 06.09.2018 regarding land acquisition for
tunnels.
6 310(2), 3.06 Rly Board’s Lr. No. 2008/LML/12/2 dt. 13.02.2008
310(3)(a), authorising CAO/C and GM to notify Competent Authority
310(6)(a) for land acquisition under Rly Act.
7 310(1) 3.07 Sample Gazette Notification to notify Special Railway Project
u/s 2(37A) of Railway Act
8 310(2) 3.08 Sample Gazette Notification to notify “Competent Authority
for Land Acquisition” u/s 2(7A) of Railway Act
9 310(3)(a) 3.09 Sample Gazette Notification to declare intention to acquire
land u/s 20A(1)
10 310(6)(a) 3.10 Sample Gazette Notification for declaration of land acquisition u/s
20E(1)
11 310(9)(a) 3.11 Land Acquisition (Special Railways Projects) Rules, 2016
12 310(9)(a) 3.12 Rly Bd. Lr. No. 2018/W-I/Genl./Land Acquisition dt.
05.02.2020 reg. opening of joint account for payment under
Rly Act
13 310 (9) 3.13 Railway Board’s Lr. No 2023/ACII/9/2/e 342205 dt.
(a) 27.02.2023 reg. opening of joint account for payment under
Rly Act
14 311 (17) 3.14 Railway Board’s instructions vide Lr. no 2021/W-1/377/SR/7
(d) dt. 06.02.2023, reg. expeditious payment of compensation
amount.
15 311(14) 3.15 Railway Board’s Lr. No. E(NG)II/2010/RC-5/1 dt. 11.11.2019
(c) reg. Lump sum payment of Rs. 5 lakh and no employment to
the affected families
16 314(1) 3.16 Railway Board vide Lr. no 2019/W-1/Genl/Land-LC (E-
3280805) dt. 08.06.2023, reg. mutation and completing land
records.
17 314(5) 3.17 Railway Board’s Lr. No. 2014/LML-11/13/7 dt. 09.07.2014
reg. handing over of land records to open line
18 314(5)(f) 3.18 Sample Copy of Land Taking/handing over note with Railway
and Revenue officials
19 318(2)(e) 3.19 MoEF’s Lr. dt. 10.03.2022 reg. non applicability of Forest
Conservation Act, 1980 and Wild life Protection Act, 1972 for
Rly land in forest area.
20 318(2)(e) 3.20 MoEF’s Lr. dt. 22.02.2023 reg. non applicability of Forest
Conservation Act, 1980 and Wild life Protection Act, 1972 for
Rly land in forest area.
21 318(4) 3.21 Ministry of Environment, Forest and Climate Change’s Lr. no
F.No. IA3-12/3/2023-IA.III (E-220190), dt. 06.10.2023, reg CRZ
clearance.
22 317(1) 3.22 Ministry of Defence’s Lr. No. 11015/2/2012/D (Lands) dt.
11.3.2015 regarding transfer of defence land.
23 317(1)(vi) 3.23 Ministry of Defence’s Lr. No. 11015/2/2012/D (Lands) dt.
02.02.2016 regarding transfer of defence land.
573
CHAPTER 4 – DRAWING APPROVALS
574
CHAPTER 5 – TENDER, CONTRACT & CONTRACT MANAGEMENT
577
CHAPTER 12 – STEEL GIRDER FABRICATION
CHAPTER 13 – TUNNELS
578
CHAPTER 14 – BUILDINGS AND PASSENGER AMENITIES
579
SN Para No Ref. document details
14 1418 14.14 Provision of ballastless track at major/important stations and
stations identified under Major Upgradation /
Redevelopment issued vide Lr. No. 2021/CE-II/TSC/10th
Extraordinary dt. 29.09.2022
15 1418 14.15 Execution of Station Development works issued vide Lr. No.
2021/ Stn. Dev.-I/08/18 dt. 03.10.2022
16 1418 14.16 Upgradation of Railway Stations on Indian Railways –
Design, inspection and audit of the projects reg: issued vide
Lr. No. 2021/ Stn. Dev.-I/08/18 dt. 19.10.2022
17 1418 14.17 Amrit Bharat Station Scheme for Indian Railways issued
vide Lr. No. 2022/GS/Stn. Dev.-I/08/70 dt. 23.12.2022
18 1418 14.18 Amrit Bharat Station Scheme for Indian Railways issued
vide Lr. No. 2022/GS/Stn. Dev.-I/08/70 dt. 31.01.2023
19 1418 14.19 Amrit Bharat Station Scheme for Indian Railways issued
vide Lr. No. 2022/GS/Stn. Dev.-I/08/70 dt. 17.02.2023
20 1418 14.20 Amrit Bharat Station Scheme for Indian Railways: Provision
of Central Foot Over Bridges (FOBs) issued vide Lr. No.
2022/GS/Stn. Dev.-I/08/70 dt. 19.04.2023
21 1418 14.21 Presentation for Master Plans of Station development
works issued vide Lr. No. 2022/GS/Stn. Dev.-I/08/70 dt.
29.04.2023
22 1418 14.22 Commercial development of Station Estate-reg. issued vide
Lr. No. 2023/LML-II/2/8 dt. 15.05.2023
23 1418 14.23 Signage Guidelines for Railway Stations issued vide Lr. No.
2023/SD- II/22/07/02 dt. 15.05.2023
24 1418 14.24 General Guidelines for OHE design in concourse area for
station development projects issued vide Lr. No.
RDSO/759/2022 dt. 12.06.2023
25 1418 14.25 Execution of Amrit Bharat Station Development Scheme
works: Role of Chief Engineer/Station issued vide Lr. No.
2022/GS/Stn. Dev.-I/08/70 dt. 19.07.2023
26 1418 14.26 Preparation of Master Plans of Station Development Works
issued vide Lr. No. 2022/GS/Stn. Dev.-I/08/70 dt.
25.08.2023
27 1418 14.27 Pradhan Mantri Bharatiya Janaaushadhi Kendras (PMBJKs) at
Railway Stations – policy regarding issued vide Lr. No.
2023/NFR/33/JAK E-office No. 3423850 dt. 08.08.2023
580
CHAPTER 15 – TRACK LAYING AND ALLIED WORKS
581
SN Para No Ref. document details
12 1605 (6) 16.12 Technical Advisory Note (TAN) No. STS/E/TAN/3012
version 3.0 for Guidelines regarding Technical System
Application Approval for Electronic Interlocking Installation
RDSO Ref no STS/E/TAN/301 Ver3.0 Dt 28.06.2021 or
latest.
13 1605 (6) 16.13 Correction in Technical Advisory Note No. 3012 version 3.0
RDSO- SIG0EI(GEN)/1/2020 Dt 11.07.2022
14 1605 (6) 16.14 Corrigendum of Technical Advisory Note No. 3012 Version
RDSO- SIG0EI (GEN)/1/2020 Dt 03-11-2022
15 1605 (6) 16.15 Guidelines for implementation of block working built in to
electronic interlocking (with same manufacturer) RDSO Ref
no TN/3013 Version1.0 Dt 28.10.2020 or latest.
16 1605 (6) 16.16 Guidelines for implementation of block working built in to
electronic interlocking (with same manufacturer) for single
line. RDSO Ref no TN/3014 Version1.0 Dt 24.06.2021 or
latest.
17 1605 (6) 16.17 Use of Embedded PC and Earthing for Electronic
Interlocking (EI) RDSO Ref no STS/E/TAN/3007 Ver 1.0 Dt
02.11.2012 or latest.
18 1605 (6) 16.18 Revised Checklist for Technical System Application
Approval of Electronic Interlocking. RDSO Ref no
STS/L/SSI/general/160 Dt 07.12.2018 or latest.
19 1605 (6) 16.19 Procedure for FAT/SAT of Electronic Interlocking No
2017/Sig/3/85th SSC Dt 04.12.2018
20 1605 (6) 16.20 EI check list as per No. STS/L/SSI Dt 09.05.2012 or latest.
21 1605 (6) 16.21 Modification/Alteration in Electronic Interlocking
(Manufactured by M/s Ansaldo make) RDSO Ref no
STS/E/TAN/3009 Ver 1.0 Dt 09.06.2014 or latest.
22 1605 (6) 16.22 Guideline regarding minor modifications/alterations in the
application software of Medha Electronic interlocking
(MEI) RDSO Ref no STS/E/TAN/3010 Ver 1.0 Dt 05.08.2014
or latest.
23 1605 (6) 16.23 Guidelines regarding minor modifications/alteration in the
application logic of VLM6 Electronic Interlocking (EI) of M/s
Siemens Rail Automation Pvt. Ltd. RDSO Ref no
STS/E/TAN/3011 Ver 1.0 Dt 14.08.2014 or latest.
24 1605 (6) 16.24 Use of hot stand by architecture for Electronic interlocking
RDSO Ref no STS/E/TAN/3004 Ver 1.0 Dt 13.06.2012 or
latest.
25 1605 (6) 16.25 Report for standardization of Typical Circuits for EI- (Report
SS 155 2019 VER 2 Dt 29-03-2022) WCR/N HQ/ 110/ Rly.
Bd’s Corresp./Sig- 25 Pt-VIII Dt 29.03.2022 or latest.
26 1605(9) 16.26 Technical System Application Approval for EI works as
instructed vide Railway Board Lr. No 2012/Sig/ATSS/Pt dt.
28.02.2023 or latest.
582
SN Para No Ref. document details
27 1609 16.27 Automatic fire suppression system along with Automatic
fire detection & alarm system as per Railway Board’s Lr.
No. 2004/ Sig/W/5 dt. 27.05.2019 or latest.
28 1611 16.28 Planning, Preparation & Execution of Works, Railway Board
Lr. No. 2012/SIG/SF/2 (Policy) dt. 14.09.2018 & 30.12.2016.
29 1613(B) 16.29 Earthing & Lightening Protection arrangement shall be
12 (d) provided for the IPS power supply system. RB Lr.
No.2011/Sig/SF/1 dt. 19.08.2011 or latest.
30 1613(C) 3 16.30 Safe and Reliable Train Detection- Redundancy in Design
(a) Railway Board Lr. No. 2012/Sig/M/DAC/DD, Dt. 31.12.2013.
31 1614 16.31 Streamlining Signalling functions Description Writing
2023/Sig/17-Sig Equip/Maintenance/Part dt. 06-11-2023
32 1611 a(i) 16.32 Standard Checklist and Proforma issued vide Railway Board
Lr. No. 2021/SIG/Estimates/DPR dt. 22-06-2023
33 1611 a(ii) 16.33 Test of renumerativeness for S&T projects – Railway Board
Lr. No. 2023/F(X) II / 10/2 dt. 22-06-2023
34 1611 a(iii) 16.34 Guidelines for provision of Automatic Signalling and Twin
Single line working – Railway Board Lr. No.
2023/ABSCOMMITTEE / Railway Board dt. 16-11-2023
***
583