The Reactor Commissioning Report details the commissioning activities for the modification, maintenance, and repair of an 8KL Alloy C-22 Reactor, as per purchase order No. 222000078. It includes a checklist of commissioning activities with corresponding remarks indicating completion status. Additionally, the report provides running trial details at various frequencies under full and no load conditions.

Uploaded by

Kushan Nakrani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

REACTOR COMMISIONING

The Reactor Commissioning Report details the commissioning activities for the modification, maintenance, and repair of an 8KL Alloy C-22 Reactor, as per purchase order No. 222000078. It includes a checklist of commissioning activities with corresponding remarks indicating completion status. Additionally, the report provides running trial details at various frequencies under full and no load conditions.

Uploaded by

Kushan Nakrani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

STEELCON ENGINEERING LLP

PLOT NO. 5013-5016, GIDC ANKLESHWAR, ANKLESHWAR, GUJARAT 393002

Reactor Commisioning Report


Purchase order No. & date : 222000078, DTD:-27.05.2023 AMENDED DTD. 15/11/2023

Equipment Detail : Modification, Maintenance & Repair Work of Existing 8KL Alloy C-22 Reactor

Sr. No. Commisioning Activities Yes No Remarks


1 Gear box oil level check
2 Breather plug in gearbox
3 Flexible coupling fitting & alignment check
4 Lantern stool surface, fitting & alignment check
Runout of shaft at seal area and at bottom end of
5
the bottom shaft
6 Thermosiphon to seal connections check
7 Thermosiphon oil & pressure check
8 Mechanical seal lock check
mechanical seal and thermosyphon cooling water
9
connection check
10 Wooden packing removal from reactor
11 Gap between FBV plug to bottom shaft end check
All inside and outside agitator assy. parts fastners
12
tightening check

Running Trial Details


Ampere at
10 Hz 20 Hz 30 Hz 40 Hz 50 Hz
At full load of water
At No load of water

Notes :

For, Steelcon Engineering LLP. For, Client