The Reactor Commissioning Report details the commissioning activities for the modification, maintenance, and repair of an 8KL Alloy C-22 Reactor, as per purchase order No. 222000078. It includes a checklist of commissioning activities with corresponding remarks indicating completion status. Additionally, the report provides running trial details at various frequencies under full and no load conditions.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
11 views1 page
REACTOR COMMISIONING
The Reactor Commissioning Report details the commissioning activities for the modification, maintenance, and repair of an 8KL Alloy C-22 Reactor, as per purchase order No. 222000078. It includes a checklist of commissioning activities with corresponding remarks indicating completion status. Additionally, the report provides running trial details at various frequencies under full and no load conditions.
Purchase order No. & date : 222000078, DTD:-27.05.2023 AMENDED DTD. 15/11/2023
Equipment Detail : Modification, Maintenance & Repair Work of Existing 8KL Alloy C-22 Reactor
Sr. No. Commisioning Activities Yes No Remarks
1 Gear box oil level check 2 Breather plug in gearbox 3 Flexible coupling fitting & alignment check 4 Lantern stool surface, fitting & alignment check Runout of shaft at seal area and at bottom end of 5 the bottom shaft 6 Thermosiphon to seal connections check 7 Thermosiphon oil & pressure check 8 Mechanical seal lock check mechanical seal and thermosyphon cooling water 9 connection check 10 Wooden packing removal from reactor 11 Gap between FBV plug to bottom shaft end check All inside and outside agitator assy. parts fastners 12 tightening check
Running Trial Details
Ampere at 10 Hz 20 Hz 30 Hz 40 Hz 50 Hz At full load of water At No load of water