method statement for bulding dismantling work
method statement for bulding dismantling work
A Ipl 282-22
S.Sinh
TPL
KEC KEC INTERNATIONAL LIMITED
>RPG
KECI BALCOI RPI MSI 007
QUALITY MANAGEMENT Methodology for RCC Work
Page 2 of6
Table of Contents
1 SCOPE
.Error!Bookmark not defined.
2 WORK PROCEDURE
3 DETAILS OF PLANT & MACHINERIES, TOOLS-TACKLES.
4 Dismantling, displacement, stock and transport plan..... 4&5
5 INSPECTION AND DOCUMENTS TO BE CHECKED.... s.......5
6 RESPONSIBILITIES...
>RPG
KEC KEC INTERNATIONAL LIMITED
SCOPE
1 Methodology/plans to carry out that item of work/activity in accordance with the specifications.
Sequence willbe followed for Dismantling, Transport and stock the abandoned Building material.
2 WORK PROCEDURE
Initially isolation of power connection must be ensured.
Area illumination must be ensured.
Hard barricade to be used before dismantling.
Area housekeeping to be ensured before starting of job.
Access platform as required to be ensured its durability and workability.
Hand tools and tackles are to be ensured for its use.
Job awareness to be givento the workers during tool box talk
Removalof rivets, screws, nails and any other connecting bodies in the sandwich panels (partition
walls).
Separation of panel from another member/ adjacent panel manually.
Stacking in a safe place and ensure safe condition.
After complete removal of wallpanels, removal of screws, nailsand any other connecting bodies
with roof panels.
Displacement of roof panels and stacking in the same manner as wall panels
with
Position hydra/ crane to arrest roof truss member then Cut the purlins, truss members etc.
gas cutting tools.
Displacement of the separated member and stock in a safe place.
Separation of column as the same manner of trusses & Purlins and stock in a safe place
Loading the structural member to the vehicle and transport to unloading area.
Unloading to the defined location and place safely to stock.
Area housekeeping to be done before completion of work.
KEC KEC INTERNATIONAL LIMITED >RPG
KECIBALCO/ RP/ MS/ 007
QUALITY MANAGEMENT Methodology for RCC Work Page 4 of 6
(Image of Site)
3 DETAILS OF PLANT & MACHINERIES, TOOLS-TACKLES
Once the evaluation process has determined the type of removal and lifting plan needed, need to
identify and gather information on the following components:
Once the plan has been established, need to follow it closely to reduce the probability of an accident. It
is important to
Conductapre-use inspection and verify that all components are in good condition.
Conduct a dummy rigging process following the pre-established rigging plan.
Be sure to identify and train all workers participating in the process.
Clear or prepare the area where the load is being dismantled or moved
Survey the lift site for hazardous or unsafe conditions
Clear lift path of obstructions
Identify the crane operators, drivers and other operators if any involved in the work process.
Follow specific instructions/procedures for attachment of the rigging gear to the load. Use
proper rigging techniques.
Stop the job when any potentially unsafe condition is recognized.
6 RESPONSIBILITY
Shall ensure
Shallreport to Project Manager. Shall manage all safety requirements during operation.
is in
that the communication system in functioning properly and emergency vehicles / equipment
place.
& Admin In charge/Officer:
during
Shall report to Project Manager. Shall collect details of manpower working in the area
emergency. Ensure the availability of first aid facilities and emergency vehicle is in workplace.
S.Sinha
Te
8-12.2