NRL3ELP27720 - Test Before Touch For OLE FAQs - v2.0 - 221215
NRL3ELP27720 - Test Before Touch For OLE FAQs - v2.0 - 221215
V2.0
NR/L3/ELP/27720:
Test Before Touch for Overhead Line Equipment
This document will evolve over time as more questions are submitted. To submit your
question, please email: [email protected] or scan the QR code:
Text with this side bar is updated or new text from the previous version of this document.
This document is broken down into distinct sections. Please click on the relevant category to
navigate to the required section in this document:
Briefing materials and compliance
Equipment Competent Person
The standard
Live Line Indicators
Initial Business as Usual Training
1
OFFICIAL
V2.0
• Persons involved in the day-to-day planning of isolations and associated OLPs. (This
does not include Electrical Control Operators or route based Isolation Planners.)
A learning event, with a short code of TBTOLDB, must be recorded in Oracle (Network Rail)
or Sentinel (supply chain) to record a colleague’s attendance at / undertaking of a detailed
briefing.
Overview Briefing
• Colleagues that might request an Overhead Line Permit (OLP) to enable their work to
be carried out and anyone who would like to know more about the process and why it
is important
Please do NOT record the attendance at an overview briefing in Oracle or Sentinel.
For supply chain colleagues, the materials are available via the Network Rail portal hosted
by IHS. For more information on accessing Network Rail standards please see:
Accessing-Network-Rail-Standards-V2.pdf (newnetworkrail.wpenginepowered.com)
Please note there are two versions available for both the detailed and overview briefings,
one narrated and one without narration. We would recommend making use of the narrated
versions.
The short, animated films should be used to support the detailed briefing. They help to set
the scene for the briefing’s attendees and each film should be watched before the relevant
section of the detailed briefing materials.
The materials available via the IHS Network Rail portal are as follows:
2
OFFICIAL
V2.0
The five animated films that support the detailed briefing are now also available via Safety
Central using these links:
Lifesaving Rules | Safety Central (networkrail.co.uk)
Single Approach to Isolation (OLE) | Safety Central (networkrail.co.uk)
3
OFFICIAL
V2.0
Q. What happens after the compliance date if a COSS (OLP), Nominated Person or
Authorised Person, or persons acting as an ECP has not attended/undertaken a
detailed briefing?
Collectively we must do better in relation to Test Before Touch for OLE, so we need to
consistently apply the requirements of the new standard.
After 20:00 hrs on 4th Jan ’23 if a person has not had the required detailed briefing they cannot
undertake NP, AP or COSS (OLP) duties, or duties of an ECP, as required by the standard.
This is because they would not be able to implement the actions to be compliant to the
standard.
Our present position is that we will not suspend competences affected by the detailed briefing.
However, we expect all NP, AP, COSS (OLP) holders to complete the detailed briefing and
we may choose to suspend relevant competences in the future.
It is important to note that the attendance at a detailed briefing is not an ‘authority to work’.
There is no competence awarded.
Nominated Persons should check, prior to issuing an OLP where it is planned for conductors
to be touched, that the COSS (OLP) who will receive the OLP has had the detailed briefing.
This can be achieved by the COSS (OLP), or other competence holder, logging into ‘My
Sentinel’ – ‘Cardholders’ element of the Sentinel system at www.railsentinel.co.uk on a mobile
device, or by showing a printed copy of their Sentinel profile including their picture and the
Events section. See the next question and response (below).
We are liaising with the team responsible for the development of the Sentinel App to see if it
can be configured to show Events as well as Competences when a card is scanned using the
App. More details to follow asap.
In the meantime, please continue to logon via My Sentinel to view your profile or print your
Sentinel profile as use the printout as evidence of attending/undertaking the detailed briefing.
4
OFFICIAL
V2.0
Q. How do I confirm if someone has attended/undertaken the detailed briefing for Test
Before Touch for OLE
At this stage the Sentinel app does not display Events when a person’s card is scanned via
the app. We are working with the Sentinel team to look at updating the App to enable this.
In the meantime, where required, persons can demonstrate their attendance at, undertaking
of, a detailed briefing via the Sentinel system using the ‘My Sentinel’ – ‘Cardholder’s’ login.
See http://www.railsentinel.co.uk
The image below shows how the learning event for the detailed briefing is shown on the
Sentinel system.
We recommend that you check with your relevant colleagues that they have the Sentinel App
on their phones and that they have an active login to the ‘my Sentinel’ system. The file below
shows how to create a log in account for the Sentinel system to display Events.
If there are concerns about application of this process or due to other factors such as working
in areas where access to the Sentinel website might be an issue due to mobile coverage a
hard copy of the person’s Sentinel profile should be made available.
Creating a sentinel
account_1.0.pdf
5
OFFICIAL
V2.0
Q. In the supply chain who can deliver the detailed and overview briefings and who do I
address technical questions to?
Network Rail has not set any specific briefing requirements in relation to the briefing of this
standard in the supply chain. However, we would encourage the following good practice.
• Detailed briefings should make use of the narrated version of the materials supported
by the short, animated films;
• Detailed briefings should preferably be carried out face to face;
• Where face to face meetings are not practicable and systems such as MS Teams are
used, then organisations should confirm attendance and might choose to check
attendees understanding to validate the attendance for the duration of the briefing;
• Where detailed briefings are face to face or via MS Teams (or such like) it should be
facilitated by someone with experience of overhead line equipment and/or safety
briefings;
• Use of the supply chain organisations’ own briefing system to enable colleagues to
access and undertake the detailed briefing using the Network Rail published materials.
Technical queries should be addressed to Network Rail (after checking the published FAQs)
via [email protected].
6
OFFICIAL
V2.0
Q. What happens if the work is planned with an Equipment Competent Person, but they
aren’t available on the night?
If you planned to use Method 1 and the ECP becomes unavailable (and cannot be replaced)
then Method 4 must be utilised to enable the work to continue.
Q. Can the COSS (OLP) who is holding the OLP also act as the Equipment Competent
Person (ECP)?
Yes. However, if the ECP is also the person undertaking the Test Before Touch actions then
another member of the working must also witness and record each Test Before Touch
action.
Where practicable, this should be the person supervising the physical task delivery (the
person in charge).
The standard
Q. When does Test Before Touch for Overhead Line Equipment apply?
A Test Before Touch action, or set of actions, must be implemented where an OLP is issued
and it is planned for a person, tool or an item of equipment/plant to come within 600mm of an
exposed conductor described by the OLP.
There might be other occasions where a Test Before Touch action is appropriate and ‘good
practice. The standard and the supporting detailed briefing material sets out guidance on this.
Q. Why are there four different methods to implement Test Before Touch?
We want Test Before Touch for OLE to be applied consistently. When developing the
standard, we were challenged by stakeholders not to be too prescriptive and so we have
developed four different methods to suit all task delivery methods and OLE configurations.
Method 4 was included to enable Test Before Touch actions to be consistently implemented
in urgent situations or where methods 1 – 3 cannot be sustained. It was not intended to be
used for ‘planned’ work as a means to avoid robust forward planning and proper assessment
of electrical risks.
7
OFFICIAL
V2.0
Q. Who selects the Test Before Touch method and how is this communicated to the
working party?
Planned work
Whenever an Overhead Line Permit (OLP) is issued and the standard applies then the Test
Before Touch method to be used should be selected by those person(s) responsible for
planning the implementation of isolation(s) and associated OLP(s), and the resources that
are required.
The person selecting the Test Before Touch method should liaise with the representative of
the organisation that requires the OLP to be issued, as necessary, to aid the selection of the
most appropriate Test Before Touch method.
This approach applies even where Method 1 or Method 4 is selected. The Nominated
Person responsible for the isolation and issuing OLP(s) needs to be informed of the
identified method and blank Test Before Touch action form(s) made available to them for
issuing to the COSS (OLP).
Unplanned urgent work where the timescales do not allow for methods 2 or 3 to be employed
Where the working party responding to the urgent work contains an ECP then Method 1 might
be employed. In this situation, once the approach has been agreed between the Nominated
Person and the ECP, then the ECP should record that decision by ticking the Method 1 box
at the top of page 1 of a blank Test Before Touch actions form. They should sign the ECP
declaration (also on page 1) following the Nominated Person briefing and before proceeding
with the Test Before Touch actions.
Where Method 4 is employed in this situation then the Nominated Person must agree the
approach with the COSS (OLP). This should be completed as part of the Nominated Person
to COSS (OLP) briefing prior to the OLP being issued.
The COSS (OLP) must sign the Test Before Touch actions form to accept responsibility for
requesting a Test Before Touch action in accordance with the briefing from the Nominated
Person. This is on page 1 of the Test Before Touch actions form and is in addition to the
COSS (OLP) recording their details at the top right of page 2 of the form.
8
OFFICIAL
V2.0
Where it is planned for the OTP, or persons within the OTP (e.g. within a basket), to come
within 600mm of a conductor defined on the OLP then one or more Test Before Touch
actions must be implemented.
We will monitor this specific matter during the first few week’s following the standard’s
compliance date.
Q. Are Test Before Touch actions required to allow a MEWP to travel under OLE, that is
defined by an OLP, to a location of work which requires it to pass under several discrete
in line OLE features?
On the basis that all parts of the MEWP will remain greater than 600mm from the conductors
defined on the OLP there is no requirement to undertake Test Before Touch actions.
Q. Why is it that only a Nominated Person or an Authorised Person can undertake the
Test Before Touch action?
Today, our competence framework only allows a Nominated Person or an Authorised
Person to use Live Line Indicators to undertake a Test Before Touch action.
Q. Can the action of testing before earthing apply as the Test Before Touch action if
witnessed by the COSS(OLP)?
No, there is potential for this to cause confusion as the OLP has not been issued at this
stage.
Q. Why has the Test Before Touch action form been introduced?
We acknowledge that the introduction of another form is not ideal, but when we looked at
whether we could make use of existing forms (Form B, OLP – Form C) we found that they
could not be changed to accommodate the requirements of the standard.
We will look at this again as part of the ongoing work to update NR/L3/ELP/29987 as we
introduce the phased implementation of Single Approach to Isolations, taking into account
feedback provided as this standard is implemented.
9
OFFICIAL
V2.0
Q. Who is responsible for completing and returning the Test Before Touch actions
form.
The standard requires the COSS (OLP) to witness and record Test Before Touch actions.
The COSS (OLP) must retain their completed version of the Test Before Touch actions form
and return it as part of their completed Safe Work Pack.
The Nominated Person might choose to take/request a photocopy / photo of the completed
form for their own records, but this is not a requirement of the standard.
Q. What is the process where there is an isolation where a Nominated Person issues
multiple OLPs to different parties that require an OLP?
The attached PowerPoint slides works through a specific scenario. We will review the
content within this document as operational experience is fed back following the standard’s
compliance date.
Specific isolation
scenario_1.0_Dec22.pptx
10
OFFICIAL
V2.0
Q. What Live Line Indicators should I be using for Test Before Touch?
Any product approved Live Line Indicator (LLI) can be used in accordance with the relevant
work instructions.
Please remember that where a capacitive LLI is used on 25kV OLE then a Test Before Touch
action must take place at a minimum of 3 metres along the conductor away from an OLE
structure or item of in-line insulation (if there is sufficient conductor length). Where this is not
possible, a resistive Live Line Indicator must be used.
Only resistive Live Line Indicators can be used on DC OLE.
Q. When will the initial training materials for competences affected by this standard be
updated?
Work has started and the initial, business as usual, training material will be updated in early
2023.
Until this point any new entrants to COSS (OLP) or AP or NP or OLE 3 (OLE 2 and OLE 4)
or OLEC 3 (elements 2,3 & 4) will need to have the detailed briefing
Persons progressing through the competence framework, for example, AP to NP should re-
take the detailed briefing to review the content specific to a NP.
All training materials will be updated to include all necessary requirements of the standard
within the initial and recertification materials; therefore no detailed briefing will be required. We
will communicate this out.
----------------------------------------
11