(a) Soils for impervious, semi-pervious and Not required
pervious zones of earth and rock fill
dam (s)
(b) Sand Not required
(c) Rock and coarse aggregates Not required
(d) Brick and tiles Not required
(e) Pozzolona Not required
(f) Cement and lime stone Not required
(g) Steel Not required
(h) Any other Not required
15. Have the sources for each of the above Yes
material been identified and need etc.
indicated?
16. Have the proposal for procurement of scarce No, material is found scarce.
materials been indicated?
VII. HYDROLOGICALAND
METEOROLOGICALINVESTIGATIONS
17. (a) Have the hydrological and meteorological These surveys are not required for
investigations been carried out and status this scheme, even though (i) to (ii)
of following data discussed in report? has been discussed in the report.
i) Rainfall Yes
ii) Temperature Yes
iii) Sunshine -
iv) Gauge & Discharge -
v) Sediment -
vi) Water quality -
vii) Evaporation -
(b) Has the above data been collected & Yes
appended?
VIII HYDROLOGY
18. Is the hydrology dealt with in detail in a It is not a storage scheme hence
separate volume? Have its brief details been these surveys are not mandatory
included in this Report? and therefore not included in the
report.
19. Have hydrological studies been carried out Not necessary
for the following:
5
(a) To establish the availability of water for Sufficient water is available in
the benefits envisaged? river Narmada
(b) Command area rainfall Rainfall detail attached
20. Has the Ground Water Potential (existing use Yes, indicated in report.
and additional availability) been indicated?
21. Have the studies regarding reservoir Not applicable being a lift scheme.
sedimentation been carried out and revised
elevation – area capacity curves been used
in the simulations studies (Working Table) ?
IX. LAND ACQUISITION AND The proposed scheme is not a
RESETTLEMENT OF OUSTEES storage scheme hence no land will
be submerged. The canal system
is proposed through underground
pipes, (minimum 1 m. below
ground level), thus no land will be
permanently acquired for pipe line
system only temporary land
acquisition will be acquired under
pipe line duct act. Only land for
pump houses, rising man,
approach road to pump houses (if
found necessary) and for building
construction at pump house will be
acquired. No Abadi area is
proposed to be acquired.
22. Have the type and quantum of land proposed
to be acquired in the submerged area, project Yes, as above.
area, area coming under canals and
distribution system, area required for
rehabilitation of the oustees been detailed ?
23. Is the basis for provision for land As per New Land acquisition Act.
compensation indicate? 2013.
24. Have the rehabilitation measures, amenities Not applicable.
and facilities to be provided to the project
affected persons been discussed and
whether their provisions included in the
report? Are these in accordance State’s
policy/project specific policy / draft national
policy for rehabilitation and resettlement?
6
25. Are the basis of land acquisition of the Not applicable. Being lift scheme.
submerged area up to FRL/MWL etc.
discussed?
26. Are the canals and distribution system being Not required as it is an
lined and if so what is the minimum capacity underground piped canal system.
of the channel proposed to be lined?
27. Is the locations of canal structures on main Since it will be Underground Pipe
and branch canals fixed after detailed line hence no major structures will
surveys of the final alignment? come across.
28. Are the regulation arrangements of the off- Yes, the pipe line flow will be
taking channel both near and away from the regulated by SCADA.
cross regulators discussed?
29. Are sufficient escapes including terminal As it is an underground piped
escapes provided on the main/branch canal system, thus escapes are not
distributaries/ minors? required.
30. Have the conveyance and field irrigation In Khandwa district Soyabin is a
efficiencies for paddy and upland crops prominent crop covering about
during kharif, rabi etc. been indicated, 50% area.
discussed and justified?
31. Are there any proposals for introducing Yes, Irrigation water shall be
warabandi and if so have these proposals catered only by WARABANDI
been discussed in the report and sample through WUA paripassu with the
calculations for a typical development of command area.
distributary/minor/sub minor furnished?
32. Has the present position of irrigation in the No such major canal system in the
command through existing canals, tanks, lift command considered for micro
schemes, wells etc. been brought out in the Irrigation schemes.
report?
7
33. Are the particulars of all irrigation projects Yes, there is no major and
(including minor schemes) existing/ proposed medium scheme proposed in the
in the command been indicated? proposed command area by
Madhya Pradesh Water
Resources Department at present.
34. Are there any potential areas, where ground No, as per the study the ground
water is available? If so, has the quantity & water table of Nimar Khandwa
quality of the ground water been indicated? district is very low.
35. Has the quantum of available ground water Yes, The ground water quantum in
been assessed and plan for its conjunctive the area is very low therefore
use with surface water been prepared and conjunctive use is not planned.
incorporated in the report?
36. Have the semi-detailed soil surveys been Not done, being similar to Indira
carried out for the entire command? If not the Sagar Project command.
extent of area surveyed may be indicated.
8
44. Have the monthly reservoir operation studies Not Necessary, being a lift
been carried out at least for 20 year and irrigation scheme
summary on annual basis attached?
45. Have the number of blocks selected for Not done.
detailed surveys for On Farm Development
(OFD) works including drainage and total
area covered by such blocks been indicated?
47. Have the arrangements for financing the Since it is piped line system and
OFD works and proposal, if any, for water shall be delivered with
strengthening the same been discussed? pressure up to 2.5 ha. Chak,
hence beyond it, the cultivators
shall install drip and sprinkler
system at their own cost to irrigate
their own fields. Hence provision
for confirm development (OFD)
works has not been made in the
estimate.
48. Have the agencies responsible for execution The WUA will be formed by
of OFD work been identified and elections as soon as the disnet
simultaneous planning of execution of OFD works are taken up in hand.
works along with engineering works
discussed?
49. Has the year – wise phasing of irrigation Not required.
development as a result of the project been
discussed?
50. Is the existing communication system
telephone, wireless and roads within Yes
command area sufficient to meet the
requirement after full development of
irrigation? If not, have the new proposal been
planned and discussed?
51. Is the adequacy of the marketing centers in Additional small markets, godowns
the Command Area and new proposals to etc. shall be developed by
meet the requirements after full development concerned departments.
of irrigation been discussed? Paripassu with enhancement of
crop production.
9
XII. FLOOD CONTROL AND DRAINAGE
53. Have the various flood control components of Not necessary
the multipurpose project been indicated?
54. Have the damage areas in pre-project and As described above, it is being
post project situations been identified and lift scheme and no new dam is
flood intensities worked out at each of the being proposed to be
damage centre (s) which gets affected? constructed hence flood control
aspect is not necessary to be
considered.
56. Have the following drainage aspects of
command area been discussed?
(a) Existing Surface and sub-surface The existing surface and sub-
drainage network and problems of the surface drainage will remain
drainage congestion, water logging. undisturbed as it will be an
Alkalinity/salinity if any. underground pipe line system.
(b) Studies on sub soil water table (pre-
monsoon, post-monsoon etc.)
(c) Maximum intensity of 1, 2 and 3 day Yes
rainfall.
(d) Deficiencies in farm drains. Not required.
(e) Deficiencies in existing natural drains
(f) Proposal for improvement of Yes
drainage/water logging / alkalinity/salinity
of the area along with justification thereof.
(g) Identification of the area in command
Yes
which will get benefited due to execution
of drainage net-work and benefits thereof
in terms of relief from crop damage,
increased yields etc.
10
(c) Concurrence of the competent authorities
for revision of rates and fees.
(d) Proposal to subsidies the tariff, tollage,
craft registration fee, passenger fare etc.
to attract traffic.
58. Has the State Inland Water Authority be Not applicable
consulted while finalizing the scheme and its
view point discussed?
59 Has economic justification and viability of the Not applicable
navigation component of the multipurpose
project been discussed?
XIII. POWER
60 Have the following points been discussed?
a) Availability of power generating capacity
in the state as well as in the region from
different sources.
b) Total energy available and peaking
capacity of the system in the state as well Power will be purchased for
as in the region from different sources. lift irrigation scheme from
nearby 11 KW grid and will
c) Integrated operation of the system and be used and one 34 MW
present status of utilization in the state as solar power plant will be
developed at Indira Sagar
well as in the region. Dam area and power will be
d) Surpluses and shortfalls in the system in sold to MPSEB. (Not in
Scope of current
the state as well as in the region. Contract).
e) Future plans of power development from
different sources in the state/ region.
f) Fitment of the scheme in planning of power
development of the state/ region.
11
62 Has the proposed construction programme Yes
been prepared and synchronized for timely
completion of each of the major component
of work including command area
development?
63 Have the year wise quantities to be executed Yes
by machine/labour for each of the major
component been worked out for each of the
above material?
64 Have the labour intensive items of the Yes
various major components of the project
been identified and the quantities of such
items worked out?
XV FOREIGN EXCHANGE
65 Have the details of the plant and machinery, Not required.
spares, instruments and scarce materials to
be imported worked out?
66 Is the scheme covered under state sector or Not required.
central sector?
XVI. FINANCIAL RESORUCES
67 Has the concurrence of the state Finance To be obtained
Department been obtained?
68 Have the year wise requirement of funds Yes
been indicated?
69 Is the scheme covered or proposed to be No
covered under any foreign assistance /aid
agreement?
XVII. ESTIMATE
70. Is the separate volume of estimate attached Yes, detailed estimate is
as appendix? enclosed.
XVIII. REVENUE
71 Are the basis for the following sources of Yes
revenues furnished?
a) Betterment levy and proposal for its
recovery
b) Irrigation cess
12
c) Flood protection cess
d) Crop wise water rates
e) Sale of water for village/city/industrial
/power/water supply
f) Miscellaneous
72 Have these rates been compared with the No.
existing rates at the other projects in the
state/region?
XIX. B.C. RATIO
73 Are the allocated cost for the following
components of multipurpose project worked
out and basis therein furnished?
a) Irrigation Yes
b) Power
c) Flood Control Not applicable
d) Navigation
e) Water supply
f) Any other
74. Have the various departments of the The rates of water to be sold to
state/centre agreed to the sharing of the various department are fixed by
above allocated cost? Govt. of M.P. from time to time
and are agreeable to user
department hence consent is not
obtained.
75 Have the crop wise benefits been worked out Yes
for irrigated and un irrigated crops being
grown before project in consultation with the
agriculture department and statement
furnished?
76 Have the crop wise benefits been worked out Yes
for proposed cropping pattern after the
introduction of irrigation in consultation with
the agriculture department and statement
furnished?
77 Is the B.C. ratio of Irrigation projects Yes, the B.C. Ratio is acceptable
acceptable or otherwise justified? being within prescribed limits.
78 Are the benefits other than those considered Yes
in the B.C. ratio and financial return
statement been identified?
XX. ECOLOGICAL ASPECTS
79 a) Is area likely to have any of the following
environmental and ecological problems
due to the altered surface water pattern?
If yes, whether preventive measures
have been discussed?
13