ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
Pile Cap Length (X-dir) ................ 12.16 ft Number of Piles = 8 Size = 18.0 in
Pile Cap Width (Z-dir) .................. 10.95 ft Pile Spacing = 4.50 ft Edge = 1.58 ft
Pile Cap Thickness ...................... 56.0 in OK Acc. Offset = 3.0 in Top Emb = 3.0 in
Soil Cover = 0.00 ft Batter = 14.0 deg Pile Compression Capacity ............... 275.0 kip
Column Length (X-dir) ................. 40.0 in Pile Tension Capacity ........................ 50.0 kip
Column Width (Z-dir) ................... 20.0 in Pile Lateral Capacity .......................... 5.0 kip
Column Offset (X-dir) ................... 0.0 in OK Pile Axial Capacity Ratio .................... 0.95 OK
Column Offset (Z-dir) ................... 0.0 in OK Pile Group Hor. Capacity Ratio .......... 0.00 OK
1 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
2 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
Concrete f'c = 4.0 ksi Steel fy = 72.5 ksi Soil density = 110 pcf
Overburden OB = (111.9 + 0.0) / (12.16 * 10.95) = 0.49 ksf
d Bot X-dir = 56.0 - 9.0 - 0.79 / 2 = 46.6 in
d Bot Z-dir = 56.0 - 9.0 - 0.79 - 0.79 / 2 = 45.8 in
d Avg = (46.6 + 45.8) / 2 = 46.2 in
ϕVcx = 2 * 0.75 * √(4000) * 10.95 * 12 * 46.6 / 1000 = 581.2 kip ACI Eq. (22.5.5.1)
ϕVcz = 2 * 0.75 * √(4000) * 12.16 * 12 * 45.8 / 1000 = 634.3 kip
Vux (- Side) = Σ Piles (-X) - OB = 6.0 - 0.49 * 0.56 * 10.95 = 3.0 kip < 581.2 kip OK ratio = 0.01
Vux (+ Side) = Σ Piles (+X) - OB = 6.0 - 0.49 * 0.56 * 10.95 = 3.0 kip < 581.2 kip OK ratio = 0.01
Vuz (- Side) = Σ Piles (-Z) - OB = 9.5 - 0.49 * 0.79 * 12.16 = 4.7 kip < 634.3 kip OK ratio = 0.01
Vuz (+ Side) = Σ Piles (+Z) - OB = 9.5 - 0.49 * 0.79 * 12.16 = 4.7 kip < 634.3 kip OK ratio = 0.01
3 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
-ϕVcz =
0.75 * Min(10 * √(4000, (46.2 / 39.8) * (3.5 - 2.5 * 0.87) * (1.9 * √(4000 + 0.1 √(4000 / 0.87)) *
* 12.16 * 12 * 45.8 / 1000 = 988.3 kip
+ϕVcz =
0.75 * Min(10 * √(4000, (46.2 / 39.8) * (3.5 - 2.5 * 0.87) * (1.9 * √(4000 + 0.1 √(4000 / 0.87)) *
* 12.16 * 12 * 45.8 / 1000 = 988.3 kip
Vux (- Side) = Σ Piles (-X) - OB = 1002.4 - 0.49 * 4.41 * 10.95 = 978.7 kip < 2906.0 kip OK ratio = 0.34
Vux (+ Side) = Σ Piles (+X) - OB = 1002.4 - 0.49 * 4.41 * 10.95 = 978.7 kip < 2906.0 kip OK ratio = 0.34
Vuz (- Side) = Σ Piles (-Z) - OB = 1002.4 - 0.49 * 4.64 * 12.16 = 974.7 kip < 988.3 kip OK ratio = 0.99
Vuz (+ Side) = Σ Piles (+Z) - OB = 1002.4 - 0.49 * 4.64 * 12.16 = 974.7 kip < 988.3 kip OK ratio = 0.99
4 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
Plain ϕMnx = 5 * 0.55 * √(4000) * 12.16 * 56.0² / 6 / 1000 = 1105.4 k-ft ACI Eq. (14.5.2.1a)
Plain ϕMnz = 5 * 0.55 * √(4000) * 10.95 * 56.0² / 6 / 1000 = 995.8 k-ft
5 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
6 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
7 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
8 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
9 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
11 of 11
Your company name Project: CBD AT JALSHIRI Page # ___
Engineer: 4/2/2024
Descrip: PC8
ASDIP Foundation 4.8.1.7 PILE CAP DESIGN www.asdipsoft.com
11 of 11