0% found this document useful (0 votes)
4 views

Introduction_Hydrometry

Hydrometry is the measurement of water flow in open watercourses, including streamflow, water levels, and sediment transport. The document discusses methods for measuring streamflow, including gauging site selection, stage measurement techniques, and flow velocity measurement. It emphasizes the importance of continuous streamflow records for water management and provides criteria for selecting ideal gauging sites.

Uploaded by

Mohammed Hussen
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Introduction_Hydrometry

Hydrometry is the measurement of water flow in open watercourses, including streamflow, water levels, and sediment transport. The document discusses methods for measuring streamflow, including gauging site selection, stage measurement techniques, and flow velocity measurement. It emphasizes the importance of continuous streamflow records for water management and provides criteria for selecting ideal gauging sites.

Uploaded by

Mohammed Hussen
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

94

Introduction to Hydrometry
Hydrometry means literally water measurement. In the past hydrometric engineers were particularlyinvolved in
stream ow measurements. Today many aspects of water measurements are included.Hydrometry is de ned in this
course as the measurement of ow inopen watercourses, supported or complemented by the measurements of water
levels, bed levels and sediment transport.

5. STREAMFLOW MEASUREMENTS

Continuous streamflow records are necessary in the design of water supply


systems, in designing hydraulic structures, in the operation of water management
systems, and in estimating sediment or chemical loads of streams. To do these,
systematic records of stage and discharge are essential. This chapter elaborates
common methods practiced in Ethiopia to measure streamflow.

River stage is the elevation above some arbitrary zero datum of the water surface
at a streamflow gauging station. The datum is sometimes taken as mean sea level
but more often is slightly below the point of zero flow at the gauging station. The
elevation datum is set with reference to at least three permanent reference marks
or benchmarks located in stable ground separate from the recorder structure
following standard surveying work.

It is difficult to make a direct, continuous measurement of discharge in a stream


or river but relatively simple to obtain a continuous record of stage. Thus
measurements of river stage provides the best alternative. Before we discuss some
methods of measuring river stage, first we discuss criteria fort selecting a stream
gauging station.

5.1 Stream gauging site selection

The principles of network design and the proposed use of data should govern the
selection of streams to be gauged. Dense network of gauging station is required
for research works related to runoff estimation, soil erosion estimation, and water
balance calculation at different watershed sizes. Whereas the goal is to construct a
dam to impound water, light network of stream gauging stations is sufficient -
one station at or near the dam site can be adequate. A general-purpose network
must, however, provide the ability to estimate hydrological parameters over a
wide area using for example a regional regression model.

Despite the development of a variety of objectives and statistically based methods


for streamflow and rainfall network design, judgment and experience are still
95

indispensable. The WMO Guide to Hydrological Practice recommendations for


network density as a staring point for network design is given in Table 5.1.

Table 5-1.Recommended minimum density of hydrometric stations


Range of provisional
Range of norms for norms tolerated in
Type of region minimum network, area, difficult conditions area,
km2 per station km2 per station
Flat regions of tropical,
temperate and 1000 - 25000 3000 - 10000
Mediterranean zones
Mountainous regions of
tropical, temperate and 300 -100 1000 - 5000
Mediterranean zones
Small mountainous
islands with very
irregular rainfall, very 140 - 300
dense stream network
Arid zone 5000 - 20000

5.1.1 Selection of gauging site

The selection of a particular site for the gauging station on a given stream should
be guided by the following criteria for an ideal gauge site (WMO 1981):

i. The general course of the stream is straight for about 100 meters upstream
and downstream from the gauging site.

ii. The total flow is confined into the channel at all stages and no flow
bypasses the site as sub-surface flow.

iii. The streambed is not subject to scour and fill and is free of aquatic growth.

iv. Banks are permanent, high enough to contain floods, and are free of brush.

v. Unchanging natural controls are present in the form of a bedrock outcrop


or other stable riffle for low flow, and a channel constriction for high flow,
or a fall or cascade that is un-submerged at all stages to provide a stable
96

relation between stage and discharge. If no satisfactory natural low-water


control exists, a suitable site is available for installing an artificial control.

vi. A site is available, just upstream from the control, for housing the stage
recorder where the potential for damage by water-borne debris is minimal
during flood stages; the elevation of the stage recorder itself should be
above any floods likely to occur during the life of the station.

vii. The gauge site is far enough upstream from the confluence with another
stream.

viii. A satisfactory reach for measuring discharge at all stage is available


within reasonable proximity of the gauge site. It is not necessary that low
and high flows be measured at the same cross-section.

ix. The site is readily accessible for ease in installation and operation of the
gauging station.

x. Facilities for telemetry can be made available, if required.

xi. Typical streamflow gauging station installed in the Wabi Shebele river at
upstream fo Melka Wakana Dam is shown in Figure 5.1. In practice rarely
will an ideal site be found for a gauging station and judgement must be
exercised in choosing between possible sites. A gauging site should be
located at a point along the stream where there is a high correlation
between stage and discharge, featuring a one to one correspondence
between stage and discharge. Either section or channel control is
necessary for the rating to be single-valued.

xii. A rapid or fall located immediately downstream of gauging site forces


critical flow through it, providing a section control. In the absence of a
natural section control, an artificial control – for instance, a concrete weir
– can be built to force the rating being single-valued. This type of control
is very stable under low and average flow conditions.

xiii. A long downstream channel of relatively uniform cross-sectional shape,


constant slope, and bottom friction provides a channel control. However, a
97

gauging site relying on channel control requires periodic re-calibration to


check its stability. To improve channel control, the gauging site should be
located far from downstream backwater effects caused by reservoirs and
large river confluence.

Figure 5-1: Typical streamflow gauging station installed in the Wabi river
near Dodola town upstream of the Melkawakana reservoir (February 2002).

5.2 Stage measurement

Basically there are two modes of stage measurements. The first is discrete stage
measurements using manual gauges, and the second is continuous stage
measurements using recorders. For the measurement of stage, uncertainties
should not be worse than  10 mm or 0.1 % of the range.

5.2.1 Manual gauge

The simplest way to measure river stage is by means of a staff gage. A staff gauge
is vertically attached to a fixed feature such as a bridge pier or a pile (Figure 5.2).
The scale is positioned so that all possible water levels can be read promptly and
accurately. Another type of manual gauge is the wire gauge. Wire gauge consists
of a reel holding a length of light cable with a weight affixed to the end of the
Watershed properties 98
_______________________________________________________________________________

cable. The reel is mounted in affixed position – for instance, on a bridge span –
and the water level is measured by unreeling the cable until the weight touches the
water surface. Each revolution of the reel unwinds a specific length of cable,
permitting the calculation of the distance to the water surface. Manual gages are
used where stages do not vary greatly form one measurement to another
measurement. They are impractical in small or flashy streams, where substantial
changes in stages may occur between readings.

5.2.1 Recording gauge

A recording gage measures stages continuously and records them on a strip chart.
The mechanism of a recording gauge is either float actuated or pressure actuated.
In a float actuated recorder, a pen recording the water level on a strip chart is
actuated by a float on the surface of the water. The recorder and float is housed on
suitable enclosure on the top of a stilling well connected to the stream by two
intake pipes (two intake pipes are used incase one of them become clogged)
(Figure 5.2). The stilling well protects the float from debris and ice and dampens
the effect of wave action. This type of gage is commonly used for continuous
measurements of water levels in rivers and lakes.

The pressured actuated recorder or the bubble gage senses the water level by
bubbling a continuous stream of gas (usually CO2) into the water. The bubble
gauge consists of a specially designed servo-manometer, gas-purge system, and
recorder. Nitrogen fed through a tube bubble freely into the stream through an
orifice positioned at a fixed location below the water surface. The pressure in the
tube, equal to that of the piezo-meteric head above the orifice, is transmitted to the
servo-manometer, which converts changes in pressure in the gas-purge system
into pen movements on a strip-chart recorder. Bubble-type water level sensors are
used in applications where a stilling well is either impractical or too expensive
and where the stream carries a heavy sediment load. The Awash river at Awash
town is equipped with pressured actuated recorder.
99

Figure 5-2. The measurement of stage through manual methods and recording
instruments (after Gregory and Walling, 1973)
100

Figure 5-3: A typical chart from vertical float recorder.


101

Crest stage gage. This is used to obtain a record of flood crest at sites where
recording gages are not installed. A crest stage gage consists of a wooden staff
gage scale, situated inside a pipe that has small holes for the entry of water. A
small amount of cork is placed in the pipe, floats as the water rises, and adheres to
the staff or scale at the highest water level.

Telemetric gages. Gages with automatic data transmittal capabilities are called
self-reporting gages, or stage sensors. Self-reporting gauges are of the float-
actuated or pressure actuated type. These instruments use telemeters to broadcast
stage measurement in real time, from a stream gauging location to a central site.
This type of gauge is ideally suited for applications where speed of processing is
of utmost important, e.g., for operational hydrology or real-time flood forecasting.
102

5.3 Flow velocity measurement and discharge computation

Flow velocity. The velocity of flow in a stream can be measured with a current
meter. Current meters are propeller devices (Figure 5.4) placed in the flow, the
speed with which the propeller rotates being proportional to the flow velocity.

Figure 5-4: Vertical and horizontal axis current meters and wading rod and cable
suspension mounting of the meter body.
Watershed properties 103
_______________________________________________________________________________

The relation between measured revolution per second of the meter cups N and
water

V = a + bN (5.1)

velocity V is given by
where:
a = the starting velocity or velocity required to overcome mechanical friction.
b = the constant of proportionality, and

Figure 5-5: Top: current meter mounted on a measuring rod, (bottom) suspended on a
cable from the bow of a jet-boat. Wide rivers flow (usually greater than 100 m) are often
measured using a boat- the Baro river near Sudan border is the case in Ethiopia.

Initial values of a and b can be found from the calibration tables provided by the
manufacturer. With time the values of a and b are changing and regular
104

recalibration is essential. This may be done by towing the current meter through
still water in a tank at a series of known velocities.

The current meter can be hand-held in the flow in a small stream (measurement
by wading), suspended from a bridge or cable way across a large stream, or
lowered from the bow of a boat (Figure 5.5).

Velocity distribution: The flow velocity varies with depth in a stream . Over the
cross-section of an open channel, the velocity distribution depends on the
character of the river banks and of the bed and on the shape of the channel. The
maximum velocities tend to be found just below the water surface and away from
the retarding friction of the banks.

The average velocity occurs say about 0.6 of the depth. It is standard practice to
measure velocity at 0.2 and 0.8 of the depth when the depth is more than 60 cm
and to average the two velocities to determine the average velocity for the vertical
section. For shallow rivers and near the banks on deeper rivers where the depths
are less than 0.6 m, velocity measurements are made at 0.6 of depth of flow.

Discharge computation.

The discharge computation of a stream is calculated from measurements of


velocity and depth. A marked line is stretched across the stream. At regular
intervals along the line, the depth of the water is measured with a graduated rod or
by lowering a weighted line from the surface to the stream bed, and the velocity is
measured using a current meter. The discharge Q at a cross-section of area A is
found by

(5.2)
Q   V .dA

Where V = streamflow velocity


A = cross sectional area of the flow
105

Figure 5-6. The velocity area technique of discharge measurements: a cable way is used
on large streams for positioning the current meter in the verticals and a special cable
drum can be used to obtain accurate readings of depth and spacing of verticals. The mean
section and mid-section methods are commonly used to compute the discharge of the
individual segments.
106

in which the integral is approximated by summing the incremental discharges

n
Q = V i d i  W i (5.3)
i=1

calculated from
each measurement i, i = 1, 2, ..., n of velocity Vi and depth di.
The measurements represent average values over width wi of the stream.

Example 5.1: Given the following stream gauging data, calculate the discharge.

Vertical No. 1 2 3 4 5 6 7 8 9 10 11
Distance to refernce point (m) 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0
Sounding depth di (m) 0.0 0.5 0.8 1.2 1.5 2.5 3.0 2.0 1.2 2.7 2.9
Velocity at 0.2 di (m/s) 0.0 0.5 0.7 0.9 1.2 1.4 1.7 1.3 0.9 1.7 1.8
Velocity at 0.8 di (m/s) 0.0 0.4 0.6 0.7 0.8 1.1 1.3 1.0 0.7 1.3 1.4

Solution: To use Eq. (5.3) first the average velocity at each sounding depth is calculated,
then the partial width which is constant in this example is calculated (20-15) = 5 m

0.0
1 2 3 4 5 6 7 8 9 10 11
-0.5

-1.0

-1.5

-2.0

-2.5

-3.0

-3.5

Vertical No. 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0
Distance to reference point (m) 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0
Sounding depth (m) 0.0 0.5 0.8 1.2 1.5 2.5 3.0 2.0 1.2 2.7 2.9
Velocity at 0.2 m (m/s) 0.0 0.5 0.7 0.9 1.2 1.4 1.7 1.3 0.9 1.7 1.8
Velocity at 0.8 m (m/s) 0.0 0.4 0.6 0.7 0.8 1.1 1.3 1.0 0.7 1.3 1.4
Average Velocity (m/s) 0.0 0.5 0.7 0.8 1.0 1.3 1.5 1.2 0.8 1.5 1.6
Partial area Ai (msq) 0.0 2.5 4.0 6.0 7.5 12.5 15.0 10.0 6.0 13.3 4.8
Partial discharge (m3/s) 0.0 1.1 2.6 4.8 7.5 15.6 22.5 11.5 4.8 19.5 7.6
Total Q = 97.58 (m3/s) Total A = 81.61 msq
Average velocity (m/s) = Q/ A = 1.196 m/s
107

5.4 Dilution gauging


Dilution gauging method of measuring the discharge in a stream is made by
adding a chemical solution or tracer of known concentration to the flow and then
measuring the dilution of the solution downstream where the chemical is
completely mixed with the stream water. A tracer is a substance that is not
normally present in the stream and that is not likely to be lost by chemical
reaction with other substances. Salt, fluorescein dye, and radioactive materials are
commonly used as tracers. In general there are two methods of dilution gauging,
sudden-injection methods and constant rate injection method. The two methods
are described as follows.

5.4.1 Sudden Injection method

In this method a quantity of tracer volume V1 and concentration C1 is added to the


river by suddenly emptying a flask of tracer solution that is gulp injection. At the
sampling station downstream the entire tracer cloud is monitored to find the
relation between concentration and time. The quantity of tracer or mass of tracer
M is then equal to C1V1. If t1 is the time before the leading edge of the tracer
cloud arrives at the sampling station and t 2 is the time after all the tracer has

t2

C1V1 = Q 
t1
(C 2  C 0 )dt (5.5)

passed this station the quantity of tracer is given by

Where: C2 = sustained final (equilibrium) concentration of the chemical in the


well mixed flow (mg/l)
C0 = the base value concentration, already present in the river (mg/l)

Using principle of conservation of mass we may estimate the streamflow Q:

C1V1
Q t2


t1
(C 2  C 0 )dt (5.6a)
108

V1C1
Q (5.6b)
TC 2

Figure 5-7. Dilution gauging: constant rate injection and gulp injection.
109

5.4.2 Continuous and constant rate injection method

In this method a tracer of known concentration C1 is injected continuously at a


rate q at a sampling station situated downstream of injection point. The mass rate
M at which the tracer enters the test reach is

M  qC1  QC0 (5.7)

Assuming that satisfactory mixing of tracer has taken place with the entire flow
across the cross-section with the measured concentration C2 (reaching equilibrium
concentration), we have

qC1  QC0  (Q  q)C 2 (5.8)

Solving for Q we get

C1  C 2
Q q (5.9a)
C 2  C0

The dilution method is particularly useful for very turbulent flows, which can
provide complete mixing within a relatively short distance. It is also applicable
when the cross section is so rough that alternative methods are unfeasible.

It is to be noted that a highly turbulent and narrow reach is desirable. In this


regard minimum required mixing length can be estimated by

0.13B 2 C (0.7C  2 g )
L (5.9b)
gy
Where: L = mixing length
B = average width of the stream
y = average depth of the stream
C = Chezy’s coefficient of roughness, varying from 15 to 50 for smooth to rough
bed conditions
g = 9.81 m/s2
110

Example 5.2 25 g/l solution of a chemical tracer was discharged into a stream at 0.01 l/s.
At sufficiently far downstream observation point, the chemical was found to reach an
equilibrium concentration of 5 parts per billion. Estimate the stream discharge. The
background concentration of the tracer chemical in stream water may be taken as nil.

Solution. q = 0.01 l/s = 10–5 m3/s, C1 = 25 gm/l = 20 000 mg/l = 20 000 ppm = 20 part
per billion

C1  C 2
Q= q
C2  C0

Q = (20 000/0.005)*10 -5

Q = 50 m3/s

Example 5.3 A fluorescent tracer with a concentration of 45 gm/l was injected into a
stream at a constant rate of 8 cm3/s. At a downstream section sufficiently far away from
the point of injection, the concentration was found to be 0.008 parts per million. Estimate
the discharge in the stream. The background concentration of the tracer in the stream is
zero.

Solution. using Eq (5.9a) we get


C1  C 2
Q q
C 2  C0

8 *10 6 (45000  .008)


Q
.008  0

Q = 45 m3/s

5.5 The slope-area method

Occasionally, the high stages and swift currents that prevails during floods
increase the risk of accident and bodily harm. Therefore, it is generally not
possible to measure discharge during the passage of a flood. An estimate of peak
discharge can be obtained indirectly by the use of open channel flow formula.

The following guidelines are used in selecting a suitable reach:


111

i. High-water marks should be readily recognizable.


ii. The reach should be sufficiently long so that fall can be measured
accurately.
iii. The cross-sectional shape and channel dimensions should be relatively
constant.
iv. The reach should be relatively straight, although a contracting reach is
preferred to an expanding reach, and
v. Bridges, channel bends, waterfalls, and other features causing flow non-
uniformity should be avoided. Note that the accuracy of the slope-area
method improves as the reach length increases.

A suitable reach should satisfy one or more of the following criteria:

i. The ratio of reach length to hydraulic depth should be greater than 75.
ii. The fall should be greater than or equal to 0.15 m, and
iii. the fall should be greater than either of the velocity heads computed at the
upstream and downstream cross sections.

The procedure consists of the following steps:

I. Calculate the conveyance K at the upstream and downstream


sections:

1
Ku 
2/3
Au Ru (5.10)
n

1
Kd 
2/3
Ad Rd (5.11)
n

Where: K = conveyance
A = flow x-sectional area (m2)
R = hydraulic radius (m)
n = reach Manning roughness coefficient
u and d denotes upstream and downstream, respectively

II. Calculate the reach conveyance K , equal to the geometric mean of


Watershed properties 112
_______________________________________________________________________________

the upstream and downstream conveyances:

K  ( K u K d )1 / 2 (5.12)

III. Calculate the first approximation of the energy slope S:

F
S  (5.13)
L

Where: F = fall, elevation difference in L;


and L = reach length

IV. Calculate the first approximation to the peak discharge Qi

Qi  KS 1 / 2 (5.14)

V. Calculate the velocity heads:

 u (Qi / Au ) 2
hvu  (5.15)
2g

 d (Qi / Au d ) 2
hvd  (5.16)
2g

Where: hu and hd are the velocity heads at upstream and downstream sections
respectively,

 vu and  vd are the velocity heads at upstream and downstream sections


respectively, and

g = gravitational acceleration.

VI. Calculate an updated value of energy slope Si:


113

F  k (hvu  hvd )
Si  (5.17)
L

Where: k = loss coefficient, for expanding flow, i.e., A d > Au, k = 0.5, for
contracting flow that is Ad < Au, k = 1.0

VII. Calculate an updated value of peak discharge

Qi  KS i
1/ 2
(5.18)

VIII Compare the updated value of peak discharge with previous estimate, and
continue the iteration until you close the difference between the newly estimated
peak discharge and the previously estimated peak discharge.

Example 5.3 Use the slope area method to calculate the peak discharge for the following
data: Reach length = 600 m, fall = 0.6 m. Manning n = 0.037.
Upstream flow area = 1550 m2, upstream wetted perimeter = 450 m, upstream
velocity head coefficient = 1.10. Downstream flow area = 1450 m2 , downstream wetted
perimeter = 400 m, downstream velocity head coefficient = 1.12.

Solution: Basic parameters calculations:


Flow Wetted Hydraulic Conveyance Reach 93999.14
area (m3/s) conveyance =
2
(m ) perimeter radius (m)
(m)
upstream section 1550 450 3.44 95,545.32 First App. of S = 0.001
downstream section 1450 400 3.63 92,477.97

Peak discharge computation:

Energy slope Peak


Iter. No. hvu (m) h vd (m) discharge
3
(m/m) (m /s)
1 0.001 2972.515
2 0.20619 0.2399 0.0009438 2887.815
3 0.19461 0.22642 0.000946 2892.639
4 0.19526 0.22718 0.0009468 2892.368

Hence, the final value converges to Q = 2892.3 m3/s


114

5.6 Orifice formula for bridge opening

The discharge may be calculated from measurements taken on an existing bridge


over the river by using the orifice formula (TRRL, 1992):

V 2 (1 / 2 )
Q  C o (2 g )1 / 2 LDd [( Du  Dd )  (1  e) ] (5.19)
2g

Where:
Q = Discharge at a section just downstream of the bridge (m3/s)
g = Acceleration due to gravity (9.81 m/s2)
L = Linear waterway, i.e. distance between abutments minus width of piers,
measured perpendicular to the flow (m)
Du = Depth of water immediately upstream of the bridge measured from marks
left by the river in flood (m)
Dd = Depth of water immediately downstream of the bridge measured from marks
on the piers, abutments or wing walls (m)
V = Mean velocity of approach (m/s)
Co and e are coefficients to account for the effect of the structure on flow, as listed
in Table 5.2. Definition sketch of the Orifice formula is shown in Figure 5.8.

Table 5-2. Values of Co and e in the orifice formula, L = Width of waterway, and W
=unobstructed width of the stream as defined in Figure 5.9:
L/W Co e
0.50 0.892 1.050
0.55 0.880 1.030
0.60 0.870 1.000
0.65 0.867 0.975
0.70 0.865 0.925
0.75 0.868 0.860
0.80 0.875 0.720
0.85 0.897 0.510
0.90 0.923 0.285
0.95 0.960 0.125

It is to be noted that whenever possible, flow volumes should be calculated by


both the area-velocity and orifice formula methods, and compared.
115

Example 5.4 Calculate the discharge passing through a bridge with a waterway width of
18 m across a stream 30 m wide. In flood the average depth of flow just downstream of
the bridge is 2.0 m and the depth of flow upstream is 2.2 m.

Solution. Discharge at a section just upstream of the bridge, assuming a rectangular


section is A. V = 2.2 x 30 V = 66 V m3/s. Discharge at a section just downstream of the
bridge will be the same and will be given by the orifice formula:
V 2 (1 / 2 )
Q  C o (2 g )1 / 2 LDd [( Du  Dd )  (1  e) ]
2g
L =18, W = 30, L/W = 0.6, thus C0 and e are 0.87 and 1.00 respectively.
V 2 (1 / 2 )
Q  0.87(2 * 9.81)1 / 2 18 * 2[(2.2  2)  (1  1) ]
2 * 9.81
Q = 138.6[0.2 + 0.102V2/(2*9.81)]0.5

Substituting for Q, 66V, we get 66V = 138.6[0.2 + 0.102V2/(2*9.81)]0.5, V= 1.265

Now Q = 66 V = 66 *1.265 = 83.5 m/s


116

Figure 5-8. Definition sketch of the orifice formula


117

5.7 Stage discharge relationship - rating curve

The rating curve is constructed by plotting successive measurements of the


discharge and gage height on a graph. Figure 5.9 shows an example of rating
curves in linear and logarithmic scale for Zarema river a tributary of Tekeze river
near the foot of Semen Mountains.

Rating curve of Zarema river at Zarema

7
6
5
Stage (m)

4
3
2
1
0
0 200 400 600 800 1000 1200 1400 1600
Q (m3/s)

Rating curve of Zarema river at Zarema

10

1
Stage (m)

0.1

0.01
0.01 0.1 1 10 100 1000 10000

Q (m3/s)

Figure 5-9. Rating curves in linear (Top) and logarithmic scale of Zarema
river near Zarema, a tributary of Tekeze river (MWR)..
118

A rating curve must be checked periodically to ensure that the relationship


between Q and H has remained constant. Scouring of the stream bed or deposition
of sediment in the stream can cause the rating curve to change so that the same
recorded gage height produces different Q.

The rating curve is described by a rating equation of the form

Q = a(H + H 0 )b (5.20)

where a, b, and H0 are coefficients.

Having paired measured data of (H, Q) the coefficients a and b can be estimated
by taking a trial value of H0 which gives a straight line of the equation:

log Q = log a + b log(H + H 0 ) (5.21)

Or value of H0 adjustment for the low flow, can be estimated with the following
method. Three values of discharge (Q1, Q2, Q3) are selected from known portion
of the curve. One of these should be near the middle of the curve, and the other
value should be near the upper end of the curve. Then the third intermediate value
is estimated by

Q2 = Q1 Q3 (5.22)

If H1, H2, and H3 represent the gage heights corresponding to Q1, Q2, and Q3 then
Ho is estimated by

2
H1 H3 - H2
H0= (5.23)
H1+ H3  2 H 2

A full rating curve can consist of different rating equation, e.g., one for low flows
and one for high flows, and often for low flows b > 2, for high flows b < 2.

Example5.4 Developed rating curve for the river Zarema near Zarema a tributary of
the Tekeze river having a watershed area of 3259 km2 has the following rating curves:
119

Q = 4.241(H + 0.201)3.057 for low flow upto H  0.43m

Q = 69.997 (H + (-0.345)1.680 for high flow upto H > 0.43m

where H is in m and Q in m3/s. Figure 5.10 shows the graphical form of the above
equations.

Extrapolation of ratings. Extrapolation of ratings is necessary when a water


level is recorded above the highest level and flow gauged level. Without
considering the cross-section geometry and controls, large error may result.
Where the cross section is stable, a simple method is to extend the stage-area and
stage velocity curves and, for given stage values, take the product of velocity and
cross-section area to give discharge values beyond the stage values that have been
gauged.

Stage-area and stage velocity curves can easily produced from the data that are
used for establishing the rating curve of the same river. The stage-area curve then
can be extended above the active channel by using standard land-surveying
methods. Extrapolation of the stage-velocity curve requires understanding of the
high stage control. Where there is channel control and where Manning roughness
is not varying with stage, the Manning equation may be used to estimate the
extrapolated velocity. It is to be noted that an upper bound on velocity is normally
imposed by the Froude number V/(gh)0.5 knowing that the Froude number rarely
exceeds unity in alluvial channels.

Shifting in rating curves. The stage-discharge relationship can vary with time, in
response to degradation, aggradation, or a change in channel shape at the control
section. Shifts in rating curves are best detected from regular gaugings and
become evident when several gaugings deviate from the established curve.
Sediment accumulation or vegetation growth at the control will cause deviation
which increases with time, but a flood can flush away sediment and aquatic weed
and cause a sudden reversal of the rating curve shift.

In gravel-bed rivers a flood may break up the armoring of the surface gravel
material, leading to general degradation until a new armoring layer becomes
established, and rating tend to shift between states of quasi-equilibrium. It may
then be possible to shift the rating curve up or down by the change in the mean
Watershed properties 120
_______________________________________________________________________________

bed level, as indicated by plots of stage and bed level versus time. Most of the rivers in
Wollo, such as Mille and Logia exhibit such phenomenon.

In rivers with gentle slopes. discharge for a given stage when the river is rising may
exceed discharge for the same stage when the river is falling (flood
subsiding). In such cases adjustment factors must be applied in calculating
discharge for rising and falling stages.

140.00 Wabi River at Melkawakana 1969