This letter addresses non-compliance issues related to Health, Safety, and Environment (HSE) observations for the construction of a swimming pool in Balasore. The contractor, M/s Bansal Infraprojects Pvt. Ltd., is required to rectify the issues within a week and submit a closure report. Additionally, a safety representative must be appointed for monitoring compliance across all project areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Letter No 247 (Swimming Pool, Balasore) NCR - 4

This letter addresses non-compliance issues related to Health, Safety, and Environment (HSE) observations for the construction of a swimming pool in Balasore. The contractor, M/s Bansal Infraprojects Pvt. Ltd., is required to rectify the issues within a week and submit a closure report. Additionally, a safety representative must be appointed for monitoring compliance across all project areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Letter No: SMCPL/BBSR/PMC/OBCC/PgMC/2024-25/161/ Date: 21.01.

2025

To
The Project Manager
M/s Bansal Infraprojects Pvt. Ltd.
Balangir, Odisha.

Sub: Construction of Swimming Pool at Balasore on Turnkey Basis: Non-Compliance report (NCR)-04 -HSE.

Ref: i) Agreement No- 32/Turnkey-Lumpsum/2022-23, Date- 28.03.2023


ii) DAILY UA/UC OBSERVATION SHEET- 1 Date- 20.01.2025

Sir,

Please find attached herewith DAILY UA/UC OBSERVATION REPORT (HSE)-1, dated 20.01.2025,.Please take
a note that all the HSE observations as specified need to be complied within a week & a closure report shall be
submitted to the engineer with a copy to OBCC officially.
With reference to the report attached, please note that the comments/observation given is not limited &
exhausted to the area marked/displayed in the report only .It is also applicable to all other areas of the project
sites potentially hazardous . Necessary suitable rectification/correction as per relevant State & National laws
should be applied as remedial /control measures. You are requested to appoint a representative of safety for
proper monitoring & compliance.
This is for your necessary information & immediate action please.

Thanking You,
Yours faithfully,

Col. J.K Satpathy (Retd.)


Team Leader cum Project Management Expert
SM Consultants Pvt. ltd.

Enclosure:
1) DAILY UA/UC OBSERVATION SHEET- 1 Date- 20.01.2025

Cc:
 Chief General Manager- III, OB&CC Ltd. Vikash Bhawan, Bhubaneswar. for your kind information and
necessary action.
 General Manager EKAMRA Division, OB&CC Ltd. Bhubaneswar. for your kind information and necessary
action.