0% found this document useful (0 votes)
20 views10 pages

25.SWMS Of Installation of HT & LT Cable

This Safe Work Method Statement outlines the procedures, hazards, risks, and control measures for the installation of HT & LT cables at HILTI Manufacturing India Pvt. Ltd. The document details specific tasks, potential hazards, and the necessary safety protocols to ensure worker safety, including training requirements and personal protective equipment. It also emphasizes the importance of supervision and compliance with relevant legislation and standards.

Uploaded by

NAGARJUNA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views10 pages

25.SWMS Of Installation of HT & LT Cable

This Safe Work Method Statement outlines the procedures, hazards, risks, and control measures for the installation of HT & LT cables at HILTI Manufacturing India Pvt. Ltd. The document details specific tasks, potential hazards, and the necessary safety protocols to ensure worker safety, including training requirements and personal protective equipment. It also emphasizes the importance of supervision and compliance with relevant legislation and standards.

Uploaded by

NAGARJUNA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 10

Safe Work Method Statement

Project Name: HILTI MANUFACTURING INDIA PVT. LTD. Address: Savli, Gujarat
Company Name: SCON Projects Private Limited Activity/Work: Installation of HT & LT Cable
Address: Samarth House S.No. 116, Hissa No. 3/1,3/3, 3/10, Pune Bangalore Highway, Near Shell Petrol Pump, Warje, Pune-411058
Office Contact No: 020-25286425
PM/Supervisor Name: Mr. Vithal Chitte Contact No.:- 9008855602
Person who
Procedure (in steps) Possible Hazards Risk Control Measures
will ensure
(Break the job down into (Identify the hazards associated with Rating (Describe what action or procedure will be taken to eliminate or minimize
steps. Each step should each step. Examine each to find (See the risk of injury or damage. Use the Hierarchy of Controls below as a this happens
accomplish some major possibilities that could lead to an below) guide
task and be in logical accident or potential harm arising.) 1. Eliminate the Hazard
sequence.) 2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE

Prepared by Reviewed by Reviewed by Reviewed by Approved by


SCON HSE SCON Project Manager JLL HSE HILTI HSE HILTI Project Manager
 Only inducted worker shall be deputed at the work place
1
Manpower Mobilization  Deployment of untrained/ M  Ensure Tool Box Talk shall be conducted to all workers. Project
inexperienced Person  To ensure no entry of child labour at site. Manager/
 Lack of awareness about  No worker shall be permitted to work influence of alcohol. Admin/
construction hazards M  Safety Induction & information of site, rules & regulations prior to Safety
enter work site. Officer
 Medical & physical fitness certify workers shall be deploying for this
activity.
 Gate pass for all worker & staff shall be providing.
 Tool box talk should be conducted before starting activity.
 Only trained person shall be deployed.
 Mandatory PPE’s shall be providing.
 Permit to Work shall be taken prior to work.
 Ensure housekeeping before & after activity.

2 Unloading & Storage  Fall of materials  Safe access and egress to be provided Area
 Over wait materials H  Working area must be barricaded for unauthorized entry. Supervisor
 Hit by crane M  All equipments , machinery and tools & tackles should be good condition and and
inspected.
M Engineer
 Authorized and trained with valid licensed crane operator.
 Ensure follow SWL Safe distance to be maintained form crane.
 Materials should be proper stack as per standard and barricade.
 All personal protective equipment such as Safety helmet, safety shoes,
reflective jacket, hand gloves, safety goggles, nose mask etc. shall be provided.

3 Excavation  Underground Utility M  Safe access and egress to be provided For men and vehicle. Area
 Generation of dust & noise  Before start work all tools & tackles , equipments & machiner should be checked. Supervisor
 Topple of machine M  Skilled operator and work continue under supervision and
 Fall of person into trench Engineer
 Identify the all Underground lines before start the work .
M  Trained worker’s to be deployed this work.
 Work related safety signage’s should be displayed at work location.
M  After completation of work proper housekeeping must be required.
 Working area must be barricaded for unauthorized entry.
 All personal protective equipment such as Safety helmet, safety shoes,
reflective jacket, hand gloves, safety goggles, dust mask etc. shall be provide.
Area
Maggering  Defective equipments H  Trained and competent person to be deployed this work. Supervisor
4
 Electrical Hazard M  Maggering machine should be calibrated. and
 Safety training given to all members for this activity. Engineer
 All electrical connection should be given by authorized electrician.
 Ensure electrical connection through field distribution panel having 30 mA
ELCB.
 Restrict work area for unauthorized personnel.

5 Cable laying underground  Falling of cable drums M  Manually unrolling of cable shall be performed in a slow and study manner. Area
or cable trench  Entrapment M  Any return back movement due to slipping of cable or tension shall be Supervisor
 Manual Handling M immediately stopped and such provision shall be made. and
 Any deviation on loading cable jack shall be closed monitored. Engineer
 Personnel shall be suitably instructed in cable pulling / Laying technique.
 Assign sufficient personnel for manual unrolling of cable .
 Proper hand protection and excess caution during cable pulling/ Laying.
 Ensure competent supervision.
 Barricade the area with caution/ warning signage.
 Gas testing shall be carried out before entry into confined space trench.
6 Laying on cable tray  Improper electrical connections  All equipments and tools & tackles should be good condition and inspected. Area
 Electrocution  Trained worker’s to be deployed this work. Supervisor
 Lack of supervision  Scaffold should be checked / inspected before start the work and tag provided and
 Scaffolding bracing, platform blanks (MS only) should be tied securely.
Engineer
 Ensure electrical connection through field distribution panel having 30 mA
ELCB.
 Double insulated cable should be used.
 All personal protective equipment such as Safety helmet, safety shoes,
reflective jacket, hand gloves, safety goggles etc. shall be provide.

7 Testing & Commissioning  Compliance  Appropriate testing Area


 Marking location of conduits on as built drawings. Supervisor
 Coordination with site personnel regarding penetration and notification of and
any conduit damage.
Engineer

Personnel Summary

SUPERVISOR’S DETAILS
Supervisors Name & Qualifications: Name: Mr. Sahil Pawar
Experience: 04 Years
Qualifications: BE ( Ele.)
Supervisor’s Responsibilities: In addition to the above, the supervisor is to provide training in the use of this SWMS, issue PPE and
provide training in the same, supervise the work, ensure conformity with this SWMS, amend the SWMS
when additional hazards are found (and if applicable, ensure all workers receive a tool-box talk to discuss
the control measures for the additional hazards).

DESCRIPTION OF TRAINING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK

H&S GENERAL INDUCTION: General Safety Induction Yes

WORK ACTIVITY TRAINING:

SITE INDUCTION: Site safety induction, Yes

OTHER: (List other training undertaken by workers):


TICKETS, PERMITS or LICENCES REQUIRED undertaking this work (ie. Certificates of Competency, Confined Spaces etc):

Vehicle Insurance, PUC, Driver License

LEGISLATION, CODES OF PRACTICE and GUIDELINES applicable to this work

BOCW ACT 1996 & RULES 2003, GUJARAT BUILDING AND OTHER CONSTRUCTION WORKERS (REGULATION OF EMPLOYMENT AND CONDITIONS OF
SERVICE).
Additional Codes and Standards applicable to this trade:
Equipment & Material Summary
PLANT and EQUIPMENT USED and MAINTENANCE FREQUENCY :

Serial Plant/Equipment Contractor Work cover Plant Maintenance/service records and log books
Registration Hazards sighted by Principal Contractor prior to
No (if identified equipment being used on site?
applicable) and
controlle Yes No Sign Date
d within
SWMS?
1
2

ELECTRICAL EQUIPMENT USED DURING THE WORKS (Attach Electrical Equipment Register if applicable):
Item Tag/ Testers Name License Test Result Test Result
Item & Signature Number Date Date
Number
____
____ /___
/____ _
/____ /___
_
____
____ /___
/____ _
/____ /___
_
HAZARDOUS SUBSTANCES or DANGEROUS GOODS USED IN THE WORKS and anticipated volumes (Attach MSDS if
applicable):
Purpose Location & MSDS
Date MSD
(i.e. Volume Controls Attache
Date on Site Left Product Name S
Applicatio Used on (& PPE to be worn) d
Site Date
n on site) Site (Y/N)
/ / / / Cement / /
/ / / / / /
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and storing these chemicals. Disposal
is to be as per the waste disposal methods in the MSDS. Spillage and leaks are to be cleaned up as per the spill/leak procedures identified in the MSDS.
We agree that we have been consulted in the hazards and control measures and agree to complete the work in accordance with our Safe Work
Method Statement (SWMS).
We have been provided with training in all tasks outlined in our SWMS and in the Codes of Practice applicable to our work.

Sr. No. Employee / Worker Signature Date


1. / /
2. / /
3. / /
4. / /
5. / /
6. / /
Any changes, additions or deletions made to this SWMS are to be covered with the above personnel and the Principal Contractors representative at a
Toolbox meeting (Record date and time of Toolbox meeting below):

Date: Time:
Comments:

A copy of the Toolbox Meeting must be attached to this SWMS.

You might also like