TR.NEW
TR.NEW
NAME: CLINT D. APRASNO This will be collected by your trainer and submit the
same to the Vocational Instruction Supervisor (VIS) and shall
QUALIFICATION: Computer Systems Servicing NC II form part of the permanent trainee’s document on file.
TRAINING DURATION :______280_hrs_______
Instructions:
NOTES: __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
__________________________________________________________________ __________________________________________________________________
UNIT OF COMPETENCY: INSTALL AND CONFIGURE UNIT OF COMPETENCY: SET-UP COMPUTER NETWORKS
COMPUTER SYSTEMS Learning Task/Activity Required Date Industry Instruc
Learning Task/Activity Date Industry Instru Outcome Accompli Supervi tors
Outcome Required Accom Supervis ctors shed sor’s Remar
plishe or’s Remar Remark ks
d Remarks ks s
LO1: Plan cable routes July
LO1: Plan and prepare for June Install network Select networking materials
Assemble unit assembly cables Select tools, equipment and 1-2,
24,
computer Select materials, testing devices 2024
hardware tools, equipment and 2024 Install network cables and
testing devices cable raceway
Assemble computer Check installation work
hardware Dispose excess components
and materials following 3Rs
Configure Basic-input- waste management
output-system
LO2: Create portable June LO2: Check network connectivity July
Prepare installer bootable device Set network Diagnose fault or problem in
25, configuration the network system 3, 2024
Install portable
applications 2024 Configure network interface
card (NIC)
Carry out communication
LO3 Install operating June
checking
Install operating system (OS) 26,
system and Install and configure
drivers for peripheral/devices 2024 LO3 Configure client device July
Set router/Wi- systems settings
peripherals/ Install device drivers 4, 2024
Fi/ wireless Configure local area network
devices Check the quality of access (LAN)
work point/repeater Configure wide area network
LO4 Install application June configuration (WAN)
Install software 27, Configure wireless settings
application Update software Configure
software 2024 security/firewall/advance
settings
LO5 Test device/systems June
Conduct testing Conduct stress 28, LO4 Undertake final inspections July
and Inspect and test Check computer networks
testing 2024 5, 2024
documentation the configured Prepare reports
computer
networks
____________________ ____________________
Trainee’s Signature Trainer’s Signature ____________________ ____________________
Trainee’s Signature Trainer’s Signature
UNIT OF COMPETENCY: SET-UP COMPUTER SERVER SYSTEMS AND NETWORKS
Learning Task/Activity Date Industry Instru
Learning Task/Activity Date Industry Instru
Outcome Required Accom Supervis ctors
Outcome Required Accom Supervis ctors
plishe or’s Remar
plishe or’s Remar
d Remarks ks
d Remarks ks
LO1: Plan and prepare July
LO1: Create user folder July 8, Plan and prepare maintenance and/or
Set-up user Configure user access 15,
2024 for maintenance diagnosis of faults
access level 2024
and repair Select materials, tools,
Perform security
equipment and testing
check
devices
LO2: Check normal July 9, Check computer
Configure functions of server 2024 systems and networks
network services Install/update required
modules /add-ons LO2: Check function of July
Configure network Maintain computer systems 16,
services computer and networks
systems and Perform 2024
Check operation of
network networks scheduled/periodic
LO3 Undertake pre- July maintenance
Perform testing, deployment 10-12, LO3 Diagnose faults or July
documentation procedures Diagnose faults problems in the
and pre- Undertake operation 2024 17,
of computer computer systems
deployment and security check systems and Implement 2024
procedures Prepare reports networks contingency measures
____________________ ____________________
Trainee’s Signature Trainer’s Signature
UNIT OF COMPETENCY: MAINTAIN AND REPAIR COMPUTER