The document provides a detailed estimation of steel reinforcement and construction quantities for a project, including various structural elements like footings, beams, and slabs. It also outlines the quantities for road works, including embankment and structural quantities for different sections. Additionally, it includes a summary of material costs for tiles and other components required for the project.

Uploaded by

Praveen Chintada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

20250801-ESTIMATION-FORMAT-ASSYSTEM

The document provides a detailed estimation of steel reinforcement and construction quantities for a project, including various structural elements like footings, beams, and slabs. It also outlines the quantities for road works, including embankment and structural quantities for different sections. Additionally, it includes a summary of material costs for tiles and other components required for the project.

Uploaded by

Praveen Chintada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

ESTIMATION OF STEEL REINFORCMENT

Project
Employer Location :
Contractor
Structure : DRG. No : Rev--- Date:
Nos: of Bars Member length
Cutting Unit wt.
Sl: No of Lap Length Total Length Wastage Total Wastage Westage Weight in
Bar mark Description Shape of Bar Dia No: of No: of Total No: of length LAPS (Kg./Mtr. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 28 mm 32 mm 36 mm Remarks
No: Bars per (a) (b) (c) (d) (f) (Mtr.) (Mtr.) Per Rod in Stretch kgs
Elements sections (Mtr.) )
Section Bars bends IN NO's

"L" BAR
1 Top Cage 0.0 7775 300 25 57 1 13 741 0 7.775 0.3 1 8.000 0 0 5928 3.86 0 0 0 0 0 22882.08 0 0 0 4.00 2964.00 11441.04
- 1A

PILE CAP
S-N
1 "C" BAR REBAR in 28 1 2 295 590 0 0 0 2 -0.168 0 0 -99.12 4.84 0 0 0 0 0 0 -479.741 0 0 @200 C/C 12.168 7179.12 34746.9408
B.W

TOTAL 0 0 0 0 0 22882 -480 0 0 0 46187.98

Total (MT) 0.00 0.00 0.00 0.00 0.00 22.88 -0.48 0.00 0.00 46.1879808

GRAND TOTAL (MT) 22.40

1/8
ESTIMATION OF STRUCTURE / BUILDING
Data:
Sub & Super Structure
Plinth Level
EGL
FGL
BOF

FGL
FFL
Roof Level
Footing Bottom to FGL
PCC Thickness Below Footing
Depth of excavation
Working Space
Extra Col. Height for Future Expantion
Offset for PCC Below Footings
Width of Plinth Protection
Sand Filling Depth for Plinth Protection

Details for FGL to FL


PCC
Stone Soling with Gap Filling with Morum
Rammed Earth

Footings
F1-1900X1900X450
F2-1650X1650X400
F3-1400X1400X300

Plinth Beam- PB1


Plinth Beam- PB2
Plinth Beam- PB3
Plinth Beam- PB4

Grade Slab
Roof Slab

Column
From FDN. LVL to FGL
C1- (230X400)
C2- (230X400)

From FGL to Roof Lvl


C1- (230X400)
C2- (230X400)

Lintel Size (Considering Piece Lintel)


Chajja Size

S. No BOQ Item & No Description Unit No. Length Width Height


1 Excavation
Foundation Cum 1 3.000 3.000 1.500
Wall Cum 1 3.000 3.000 1.500
Circular Cum 1 0.786 1.500
Triangle Cum 1 0.125 1.500

2 Soling
Quantity Toatl Quantity

13.500
13.500
1.179
0.188
28.366
ESTIMATION OF ROAD WORKS (Except Structures)
Embankment Quantity from Km 0.00m to 12.428 Structural Quantity

Embk Top Average


Ch. Top Width Base Width
Sl NO G.L FRL Level = (FRL- Width Area Sqm Volume Cum Area Sq.m Volume Cum
(M) (M) (M)
0.990) (M)
1 - 2.47 6.00 5.01 29.10 39.26 34.18 86.82
2 10 2.51 5.91 4.92 29.10 38.73 33.92 81.67 842.43
3 20 2.51 5.82 4.83 29.10 38.36 33.73 78.08 798.77
Total Quantity 1,641.21 -
Deduction of Structures -
Quantity From Km 0.00m to 12.428 1,641.21

External Road From NH to Port From 0.00Km to 1.466Km Structural Quantity

Emkt Top Average


Chainage Road Top Base Width
Sl NO G.L Level = (FRL- Top Width Width Area Sqm Volume Cum Area Sq.m Volume Cum
(M) Level (M)
1.025) (M) (M)
1 - 20.39 24.57 23.58 26.81 20.43 65.20
14.05
2 10 20.27 24.44 23.45 26.78 20.42 64.98 650.91
14.05
3 20 20.22 24.31 23.32 26.45 20.25 62.78 638.80
14.05
Total Quantity 1,289.71 -
Deduction of Structures -
Quantity From 0.00Km to 1.466Km 1,289.71

Total Embankment Quantity for 4 Lane & 2 Lane Road ( Cum ) 2,930.92
Tunsia LT
45.84
0.135
339.5555556
346.3466667
57.66666667

Jhonson Make
S.No Description Unit Qty Price Amount
1 Aurea White (600MMX600MM) Boxes 246 627 154,242.00
2 Tunsia LT (300MMX450MM) Boxes 58 332 19,256.00
3 Tunsia HL (300MMX450MM) Boxes 58 332 19,256.00
4 Tunsia DK (300MMX450MM) Boxes 86 332 28,552.00
5 Tunsia F (300MMX300MM) Boxes 43 332 14,276.00
Total 235,582.00
Note: I will let you know the approximate square meter requirement for the
kitchen after completing the measurements. The requirement is
approximately 32 sqm, with two different colors in a 50:50 ratio.
Tunsia HL Tunsia DK Tunsia F
45.84 68 34
0.135 0.135 0.09
339.5556 503.7037 377.7778
346.3467 513.7778 385.3333
57.66667 85.66667 42.77778