20250801-ESTIMATION-FORMAT-ASSYSTEM
20250801-ESTIMATION-FORMAT-ASSYSTEM
Project
Employer Location :
Contractor
Structure : DRG. No : Rev--- Date:
Nos: of Bars Member length
Cutting Unit wt.
Sl: No of Lap Length Total Length Wastage Total Wastage Westage Weight in
Bar mark Description Shape of Bar Dia No: of No: of Total No: of length LAPS (Kg./Mtr. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 28 mm 32 mm 36 mm Remarks
No: Bars per (a) (b) (c) (d) (f) (Mtr.) (Mtr.) Per Rod in Stretch kgs
Elements sections (Mtr.) )
Section Bars bends IN NO's
"L" BAR
1 Top Cage 0.0 7775 300 25 57 1 13 741 0 7.775 0.3 1 8.000 0 0 5928 3.86 0 0 0 0 0 22882.08 0 0 0 4.00 2964.00 11441.04
- 1A
PILE CAP
S-N
1 "C" BAR REBAR in 28 1 2 295 590 0 0 0 2 -0.168 0 0 -99.12 4.84 0 0 0 0 0 0 -479.741 0 0 @200 C/C 12.168 7179.12 34746.9408
B.W
Total (MT) 0.00 0.00 0.00 0.00 0.00 22.88 -0.48 0.00 0.00 46.1879808
1/8
ESTIMATION OF STRUCTURE / BUILDING
Data:
Sub & Super Structure
Plinth Level
EGL
FGL
BOF
FGL
FFL
Roof Level
Footing Bottom to FGL
PCC Thickness Below Footing
Depth of excavation
Working Space
Extra Col. Height for Future Expantion
Offset for PCC Below Footings
Width of Plinth Protection
Sand Filling Depth for Plinth Protection
Footings
F1-1900X1900X450
F2-1650X1650X400
F3-1400X1400X300
Grade Slab
Roof Slab
Column
From FDN. LVL to FGL
C1- (230X400)
C2- (230X400)
2 Soling
Quantity Toatl Quantity
13.500
13.500
1.179
0.188
28.366
ESTIMATION OF ROAD WORKS (Except Structures)
Embankment Quantity from Km 0.00m to 12.428 Structural Quantity
Total Embankment Quantity for 4 Lane & 2 Lane Road ( Cum ) 2,930.92
Tunsia LT
45.84
0.135
339.5555556
346.3466667
57.66666667
Jhonson Make
S.No Description Unit Qty Price Amount
1 Aurea White (600MMX600MM) Boxes 246 627 154,242.00
2 Tunsia LT (300MMX450MM) Boxes 58 332 19,256.00
3 Tunsia HL (300MMX450MM) Boxes 58 332 19,256.00
4 Tunsia DK (300MMX450MM) Boxes 86 332 28,552.00
5 Tunsia F (300MMX300MM) Boxes 43 332 14,276.00
Total 235,582.00
Note: I will let you know the approximate square meter requirement for the
kitchen after completing the measurements. The requirement is
approximately 32 sqm, with two different colors in a 50:50 ratio.
Tunsia HL Tunsia DK Tunsia F
45.84 68 34
0.135 0.135 0.09
339.5556 503.7037 377.7778
346.3467 513.7778 385.3333
57.66667 85.66667 42.77778