4.2.14 Chennai Metro have submitted design documents for CMRL phase II project of
Annexure-B Rolling Stock Electrical through online portal on date 30.12.2023. The
same has been examined and comments sent to CMRL through online portal on
date 22.03.2024.
4.2.15 DMRC have submitted design documents for DMRC MRTS project of Annexure-B
Rolling Stock Electrical through online portal on date12.02.2024 . The same has
been examined and comments sent to DMRC through online portal on date
02.04.2024.
4.2.16 DMRC have submitted design documents for DMRC MRTS project of Annexure-D1
through online portal. The same has been examined and comments sent to DMRC on
date 22.03.2024 through online portal.
4.5 Swachhata :Directors and supervisors in UT Dte did inspection of House Keeping
and Cleaning work regularly and counselled Supervisor and Housekeeping staff for
maintaining cleanliness up to the mark.
5. Steps taken to improve customer interface (only new initiatives in the month be
listed):
5.1 It is planned to make necessary changes in the online UT portal to make it more user
friendly for Metros. RAILTEL has been advised to make arrangement in online
portal to smoothen the process of document approval.
6. Digital Initiatives:
6.1 All hard files have been scanned and new documents are available on on-line portal.
6.2 UT Directorate is making all Correspondence with Metro Rails and Railway Board
through e-mail and digitally signed letters.
Page 2 of 4
6.3 Updation of information pertains to UT Directorate available on RDSO website
(public & intranet)
7. Assistance required:
7.1 Posting of an officer as DD/Mech./UT, as post is vacant since 11.01.2023.
7.2 Posting of an officer on post of ADE/Civil/ UT, as Post is vacant since June, 2022.
7.3 Posting of an officer on post ofADE/Electrical/UT, as post is vacant.
7.4 Training requirements of the Officials of UT Directorate have been advised to ADG
RDSO vide this office note No. RDSO-UT0LKO (OS)/68/2021 Dated 21.02.2022.
7.5 Training in following fields is also required through International institutes like
KRRI, RTRI or RZD:-
i) High Speed Train Technologies (Track, Bridges, Signalling, OHE and Rolling
Stock).
ii) Metro Rail System Technologies (Rolling Stock, CBTC and TCMS).
iii Details of Zonal Railways and Board References Pending with RDSO,
ANNEXURE-III: NIL
Zonal Railway References : NA
Railway Board References : NIL
iv Status & progress in Centres of Railway Research & Work done by
professional chair at IIT/Roorkee, Railway Technology cell at
IIT/Kanpur, ANNEXURE-IV:
A. Status of the progress of setting of the CRRs : NA
B. Status of projects undertaken under CRR : NA
C. Progress of work done by professional chair at IIT/Roorkee, RTC at NIL
IIT/Kanpur:
v Progress in projects approved by MICC to TMIR, ANNEXURE-V: NIL
ix Specifications/codes/manuals/reports, ANNEXURE-IX : NA
(Amit Srivastava)
ED (UT) RDSO