Air condition
Air condition
Potential Acceptabl
Risk Evaluation Residual Risk
Hazardous Hazard Effect(s) Method(s) of control Done By e
Task(s) P S R.V P S R.V Y N
Electrical hazards Periodical check on the
(failure of the electrical and wiring Electrical
Single fatality 6 8 48 2 8 16 Y
isolation of the system of the heater dept.
power cable ) (At least monthly).
Periodical check on the
Freon release Serious injury 4 4 16 Inst. Dept. 2 2 4 Y
cooling system
We have considered the need for engineering change and /or processes shut down before this task is carried out. We believe, however, that the measures we
have specified are adequate to reduce the overall risk to an acceptable level without further safeguards, and we recommended that work should proceed.
We are not satisfied with the safeguards available to control risk and we recommend that this task should not proceed until further risk control measure can
be developed.
Conclusion/Comments:
…………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………
Name: ………………………… Signature: …………………….. Reviewed by HSE dept.
Name: ……………………….
P: probability S: severity R.V: Risk value Signature: ……………………
R.V= S xP Date: …………………………