The document outlines a hazard identification and risk control assessment for maintenance tasks related to air conditioning at the Egyptian Maintenance Company. It evaluates potential electrical hazards and Freon release, detailing risk levels and control measures. The conclusion indicates that while some risks can be managed, others require further safeguards before proceeding with the tasks.

Uploaded by

eng.ad.sallam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Air condition

The document outlines a hazard identification and risk control assessment for maintenance tasks related to air conditioning at the Egyptian Maintenance Company. It evaluates potential electrical hazards and Freon release, detailing risk levels and control measures. The conclusion indicates that while some risks can be managed, others require further safeguards before proceeding with the tasks.

Uploaded by

eng.ad.sallam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Egyptian Maintenance Co.

‫شركه مصر للصيانة‬

HAZARD IDENTIFICATION AND RISK CONTROL

Job Title :( (‫…………………………………………………………………………………… العمل‬.. Location: Air conditioner

Reported By :( ‫… ………………………………)تم بمعرفة‬..…Dept. :( ‫………… )االدارة‬.……… Day/Date:


………………………………………...…

Potential Acceptabl
Risk Evaluation Residual Risk
Hazardous Hazard Effect(s) Method(s) of control Done By e
Task(s) P S R.V P S R.V Y N
Electrical hazards Periodical check on the
(failure of the electrical and wiring Electrical
Single fatality 6 8 48 2 8 16 Y
isolation of the system of the heater dept.
power cable ) (At least monthly).
Periodical check on the
Freon release Serious injury 4 4 16 Inst. Dept. 2 2 4 Y
cooling system

We have considered the need for engineering change and /or processes shut down before this task is carried out. We believe, however, that the measures we
have specified are adequate to reduce the overall risk to an acceptable level without further safeguards, and we recommended that work should proceed.
We are not satisfied with the safeguards available to control risk and we recommend that this task should not proceed until further risk control measure can
be developed.

Conclusion/Comments:
…………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………
Name: ………………………… Signature: …………………….. Reviewed by HSE dept.
Name: ……………………….
P: probability S: severity R.V: Risk value Signature: ……………………
R.V= S xP Date: …………………………