The document is a Project Charter template that outlines the structure and key components necessary for project planning, including sections for executive summary, project overview, scope, conditions, structure, and team organization. It provides placeholders for goals, objectives, deliverables, risks, assumptions, and estimated costs. This template serves as a guide for documenting and managing project details effectively.

Uploaded by

eric.amiel1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Project Charter Template

The document is a Project Charter template that outlines the structure and key components necessary for project planning, including sections for executive summary, project overview, scope, conditions, structure, and team organization. It provides placeholders for goals, objectives, deliverables, risks, assumptions, and estimated costs. This template serves as a guide for documenting and managing project details effectively.

Uploaded by

eric.amiel1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Project Charter

Project Name:
Function:

Prepared By
Document Owner(s) Project/Organization Role

Confidential
Project Charter Template.docx
Project Charter

TABLE OF CONTENTS
1 PROJECT EXECUTIVE SUMMARY ....................................................................................... 3

2 PROJECT OVERVIEW ............................................................................................................ 3

3 PROJECT SCOPE................................................................................................................... 3

3.1 Goals and Objectives .................................................................................................. 3

3.2 Organizational Impacts ............................................................................................... 3

3.3 Project Deliverables .................................................................................................... 4

3.4 Deliverables Out of Scope .......................................................................................... 4

3.5 Project Estimated Costs & Duration............................................................................ 4

4 PROJECT CONDITIONS ........................................................................................................ 4

4.1 Project Assumptions ................................................................................................... 4

4.2 Project Issues.............................................................................................................. 4

4.3 Project Risks ............................................................................................................... 5

4.4 Project Constraints ...................................................................................................... 5

5 PROJECT STRUCTURE APPROACH ................................................................................... 5

6 PROJECT TEAM ORGANIZATION PLANS ........................................................................... 5

Confidential Page 2 29-Jan-25


Project Charter

1 PROJECT EXECUTIVE SUMMARY


[Replace this text with a high-level view of:
• project goals
• objectives
• scope
• assumptions
• risks
• costs
• timeline
• approach
• organization]

2 PROJECT OVERVIEW
[Replace this text with the rationale and business justification for undertaking this project.]

3 PROJECT SCOPE

3.1 Goals and Objectives

Goals Objectives
[Replace this text with [Replace this text with Objectives for each Goal. For
Project Goals. For example:
example: The project will 1. Develop a system by June that tracks an end-to-end
provide an improved process for 100% of product returns.
system for managing
product returns.] 2. Integrate new system with Sales in order to improve
customer satisfaction 40% by year end.]

3.2 Project Impacts

Area Impacted Impact

Confidential Page 3 29-Jan-25


Project Charter

3.3 Project Deliverables

Milestone Deliverable
1. [Milestone Description] • [Deliverable 1—description]
• [Deliverable 2—description]
• [Deliverable n—description]
2. [Milestone Description] • [Deliverable 1—description]
• [Deliverable 2—description]
• [Deliverable n—description]

3.4 Deliverables Out of Scope


[Replace this text with a description of key logical areas not considered part of the
boundaries of this project. Examples of these Out-of-Scope Deliverables may include data,
processes, applications, or business management.]

3.5 Project Estimated Costs & Duration

Project Date
Milestone Estimate Deliverable(s) Included Confidence Level
[Milestone 1] [mm/dd/yy] [Deliverable 1] [High/Medium/Low]
[Deliverable 2]

[Milestone 2] [mm/dd/yy] [Deliverable 1] [High/Medium/Low]


[Deliverable 2]

4 PROJECT CONDITIONS

4.1 Project Assumptions

• [Assumption 1]
• [Assumption 2]

4.2 Project Issues


Priority Criteria
1 − High-priority/critical-path issue; requires immediate follow-up and resolution.
2 − Medium-priority issue; requires follow-up before completion of next project milestone.
3 − Low-priority issue; to be resolved prior to project completion.
4 − Closed issue.

# Date Priority Owner Description Status & Resolution

Confidential Page 4 29-Jan-25


Project Charter

# Date Priority Owner Description Status & Resolution


1 [mm/dd/yy] [Issue 1 [Replace this text with
description] Status and Proposed or
Actual Resolution.]
2 [mm/dd/yy] [Issue 2 [Replace this text with
description] Status and Proposed or
Actual Resolution.]

4.3 Project Risks

# Risk Area Likelihood Risk Owner Project Impact-Mitigation Plan


1 [Project [High/Medium [Replace this text with a description
Risk] /Low] of the Mitigation Plan.]
2 [Project [High/Medium [Replace this text with a description
Risk] /Low] of the Mitigation Plan.]

4.4 Project Constraints

• [Replace this text with a description of a Constraint.]


• [Constraint 2]

5 Project Structure Approach


[Replace this text with a description of how the project will be structured and what
approach will be used to manage the project.
• What are the dependencies of the project?
• How will you Plan and Manage the project?]

6 Project Team Organization Plans

Project Team Role Project Team Member(s) Responsibilities


[Role Title] [Name(s)] [Replace this text with a
description of the Role
Responsibilities.]