Technical Report

The document outlines the findings from a site inspection and meeting regarding construction progress and issues. Key concerns include improper expansion joint filler, ground beam and block wall alignment, and poor column casting methods, with recommendations for corrections. The meeting also discussed progress updates and a payment request from the contractor, emphasizing the need for ongoing monitoring and compliance with project specifications.

Uploaded by

abbkasjhn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views3 pages

Technical Report

The document outlines the findings from a site inspection and meeting regarding construction progress and issues. Key concerns include improper expansion joint filler, ground beam and block wall alignment, and poor column casting methods, with recommendations for corrections. The meeting also discussed progress updates and a payment request from the contractor, emphasizing the need for ongoing monitoring and compliance with project specifications.

Uploaded by

abbkasjhn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

CONTENTS OUTLINE

1. Attendees....................................................................

2.Introductions................................................................

3. Site inspection findingss.............................................

a. Improper expansion joint filler.............................

b. Ground beam (plinth) and block wall issues.......

c. Poor column casting method...............................

4. Meeting discussions....................................................

a. Progress updates..................................................

b. Payment requests.................................................

5. Recommendationss.....................................................

6. Conclusions..................................................................

1. ATTENDEES

- Director of administration and finance for higher education, Lurwanu Abdulkadir

- Due process representatives

- Consultant-Architect

- Consultant-Quantity Surveyor

- Consultant-Structural Engineer

- Consultant-Mechanical Engineer

- Consultant-Electrical Engineer

- Contractor

- University representatives
2. INTRODUCTION

This report summarizes the findings from the site inspection and monthly meeting held on [Date]. The
purpose of the inspection was to monitor the construction progress, identify potential issues, and
ensure compliance with project specifications.

3. SITE INSPECTION FINDINGS

A. IMPROPER EXPANSION JOINT FILLER

Marine board was observed as the expansion joint filler, which is not suitable for this application.
Recommendations were made to replace it with Cellotex, particle board, or a proper expansion joint
filler.

B. GROUND BEAM ( PLINGTH) AND BLOCK WALL ISSUES

The ground beam extruded out to the verrender, and the block wall did not appear to properly rest on
the plinth. The structural engineer assured that this would not pose a structural problem since the block
wall is a non-load bearing partition wall. However, it is essential to ensure proper alignment and
installation.

C. POOR COLUMN CASTING METHOD

The method of casting columns resulted in non-uniform dimensions. This issue was noted, and
corrections will be made for future castings.

4. MEETING DISCUSSIONS

a. PROGRESS UPDATE

The construction progress was reviewed, and appreciation was expressed for the work accomplished.

b. PAYMENT REQUEST

The contractor requested payment to proceed with the construction work, citing good relations and the
need to avoid project delays. No solid agreement was reached.

5. RECOMMENDATIONS

- Replace marine board with suitable expansion joint filler.

- Verify proper alignment and installation of block walls on plinth.


- Implement corrected column casting method.

- Schedule a follow-up inspection to ensure compliance.

- Review payment request and negotiate a mutually agreeable solution.

6. CONCLUSION

The site inspection and meeting highlighted areas requiring attention to ensure project quality and
progress. Recommendations have been made to address these issues. Regular monitoring and
inspections will continue to ensure compliance with project specifications.