INSTITUTIONAL ASSESSMENT
INSTITUTIONAL ASSESSMENT
INSTITUTIONAL ASSESSMENT
Name: Date:
Qualification Title:
CARPENTRY NC II
COURSE STRUCTURE
Basic Competencies:
Participate in Workplace Communication
Work in a Team Environment
Solve/ Address General Workplace Problems
Develop Career and Life Decisions
Contribute to Workplace Innovations
Present Relevant Information
Practice Occupational Health and Safety Procedures
Working in a Team Environment Exercise and Efficient ABD
Effective Sustainable Practices in the Workplace
Practice Entrepreneurial skills in the Workplace
Common Competencies:
Prepare Construction Materials And Tools
Observe Procedures Specifications And Manuals Of Instructions
Perform Mensurations And Calculations
Maintain Tools And Equipment
Core Competencies:
Lay-Out Reference Lines
Fabricate, install and remove wooden formworkks
Install wooden door jamb, window frame and panels
Install ceiling and wall frames and panels
Fabricate and Install wooden Stairs
Install Wooden Supports and Panels
Fabricate and Install roofing system
Fabricate and Install wooden cabinet
ASSESSMENT METHOD:
Demonstration
Oral Questioning
Wriiten Test
INSTRUMENT FOR INSTITUTIONAL ASSESSMENT
EVIDENCE PLAN
Third party
Demonstra
Question/i
nterview
Written
report
tion
Prepares materials, tools and equipment in line with job X
requirements
Sets batter boards in line with job requirements X
Prepared Date:
by:
Checked Date:
by:
Assessor’s Name:
Qualification: CARPENTRY NC II
Date of Assessment:
Assessment Center:
B. Written Exam
Recommendation
For re-assessment.
For issuance of NC
Candidate’s
signature: Date:
Assessor’s
Date:
signature:
Candidate’s
Name:
Assessor’s Name:
Assessment
Center:
Qualification: CARPENTRY NC II
Unit of
Competency INSTALL FORM WORKS
Date of observation:
Description of assessment
activity:
Location of assessment
activity:
Satisfactory
response
Feedback to candidate:
The candidate’s overall performance was:
Satisfactory Not Satisfactory
Candidate’s
Name:
Assessor’s Name:
Assessment
Center:
Qualification: CARPENTRY NC II
Unit of
Competency
INSTALL FORM WORKS
Date of observation:
Description of assessment
activity:
Location of assessment
activity:
Qualification: CARPENTRY NC II
2. What would you do if you were told to use a spirit level instead of a six-
meter long leveling hose in getting the horizontal elevation? How would you go
about it?
Answer:
3. What would you do in the event your co-worker was hit in the
hand by a sledgehammer?
Answer:
4. What would you do if you found out there are bubbles inside the leveling
hose while using it?
Answer:
5. What would you do if after setting the elevation of the batter boards your last
reference point / elevation did not coincide with the first reference point /
elevation?
Answer:
Third party
Demonstra
Question/i
nterview
Written
report
tion
Prepares materials, tools and equipment in line with job X
requirements
Lays-out / erects and assembles post, girts and supports X
according to plans and specifications
Lays-out / installs floor joist according to plans and X
specifications
Lays-out install wall studs in line with plans and X
specifications
Lays-out / fabricates / installs wall frames in line with job X
requirements and specifications
Lays-out / installs ceiling joists / frames in line with job X
requirements and specifications
Prepared Date:
by:
Checked Date:
by:
Assessor’s Name:
Qualification: CARPENTRY NC II
Date of Assessment:
Assessment Center:
B. Written Exam
For issuance of NC
Candidate’s
signature: Date:
Assessor’s
Date:
signature:
Candidate’s
Name:
Assessor’s Name:
Assessment
Center:
Qualification: CARPENTRY NC II
Unit of
Competency
INSTALL FRAMING WORK
Date of observation:
Description of assessment
activity:
Location of assessment
activity:
Satisfactory
response
Feedback to candidate:
Candidate’s
Name:
Assessor’s Name:
Assessment
Center:
Qualification: CARPENTRY NC II
Unit of
Competency
INSTALL FRAMING WORK
Date of observation:
Description of assessment
activity:
Location of assessment
activity:
Qualification: CARPENTRY NC II
3. What precaution must you take when you layout and erect a post?
Answer:
Answer:
5. What would you do in the event the wall studs, which is designed for single
walling, was suddenly changed to double walling?
Answer:
1. (a) Report it immediately to your superior; (b) Stage and do some remedial action.
2. Follow the instruction of the immediate superior.
3. Check properly the layout position and secure braces rigidly after testing the alignment and
plumbness
4. Always have an accurate reference lines longitudinal and latitudinal and in other strategic
places
5. Check studs that are not in conformity with the dimensions / width and do remedial actions.