CV-EL-Civil Engineer-Bade Kartheek
CV-EL-Civil Engineer-Bade Kartheek
Email: [email protected]
Mobile no: +919704910962
To be part of an organization where growth prospects are unlimited and individual is recognized by
his work. As a professional, I am creative, innovative, and hardworking. I am looking forward to work
in a challenging environment and striving for excellence.
Profile Summary
❖ I have around 8+ years’ experience - Visakhapatnam Port trust (VPT), Agartala First Flyover
projects, & BMRCL-Projects.
❖ Working as an Execution engineer in Sam India Built Well Pvt Ltd, GR Infraprojects
Limited, NCC Limited and Saritha Infra & Geostructures.
❖ Viaducts & Stations in metro projects, Railway projects, Flyover project works, Marine
works, and Building works.
❖ Expertise in Execution of all Civil works like Foundation, Sub-structure, Structure,
Superstructure and Metro Station works.
❖ Experience in execution work of Pile Foundation, Pile caps, Piers, Pier caps, Pier Arms,
Erection of Parapets, little knowledge in LG work.
❖ Planning for the Execution of All works (i.e., Metro rail project, Flyovers, Buildings, Bridges,
Railway Bridges and Marine Projects.
❖ Performed the Pile Load tests (i.e., Lateral pile load test & Vertical Pile load test – Dynamic
method, Kent ledged method and Anchoring method).
❖ Prepares for Daily, weekly, monthly progress reports on behalf of the project management
team.
❖ Preparing of BBS as per drawings
❖ Procurement works also.
❖ Coordination with management and client.
❖ Resources mobilization includes Men, Material and Machinery as per the project work
planning at site level.
❖ Arranging of manpower(Labours)
❖ Preparing of RFI’s and Submission, preparing of Contractor Bills and Client bills.
Employer Details -01
Sam India Built Well Pvt Limited
Designation: Assistant Manager Period: July. 2024 - till now
Engineer: Site Execution Location: Chennai/India
Project: Construction of elevated viaduct (approximate length of 10 km), nine (9) elevated metro
stations at Sholinganallur Lake, Ponniamman Temple, Sathyabama University, Semmancheri, Gandhi
Nagar, Navallur, Siruseri, SIPCOT 1 and SIPCOT 2 and stabling viaduct at SIPCOT
Project Cost: 902 Crores (Approx.)
Client: Chennai Metro Rail Limited (CMRL)
ACADEMIC DETAILS: -
COMMUNICATION SKILLS:
Project name. : CSW Storage shed & Radio Station and G+5 Apartment.
Project Duration : 6 Months
Description : Construction of CSW storage shed and Radio station building at GMRIT
and G+ 5 floors Residential apartment at Vizianagaram.
Internship Experience:
PERSONAL PROFILE:
DECLEARATION:
I hereby declare that all the information mentioned above is true to the best of my knowledge.
Date: -
Place: - (KARTHEEK BADE)