Static Stress Report setup
Static Stress Report setup
1. Input Listing :
1.1. Elements.
1.2. Reducers (optional).
1.3. SIF's and TEE's.
1.4. Material ID (optional).
1.5. Restraints.
1.6. Displacements.
1.7. Hangers.
1.8. Forces.
1.9. Uniform Loads.
1.10. Wind / Wave.
1.11. Nozzles (WRC 297).
1.12. Flanges.
1.13. Units.
1.14. Setup File.
1.15. Title.
2. Load Case Report.
3. Hanger Table (W/Text).
4. Restraint Summary Extended Multiple:
4.1. HYD.
4.2. OPE (T1÷TX) .
4.3. SUS. FRICTION
4.4. EXP1÷X.
4.5. OPE (TDESIGN) +WIND1÷4.
4.6. OPE (TDESIGN) +U1÷6.
4.7. OPE (TDESIGN) + DS.A.M.
4.8. OPE (TDESIGN) + FPSV.
4.9. Sign Max OPE (T1÷TX) + Sign Max WIND1÷4.
4.10. Sign Min OPE (T1÷TX) + Sign Min WIND1÷4.
4.11. Sign Max OPE (T1÷TX) + Sign Max U1÷6. NO
4.12. Sign Min OPE (T1÷TX) + Sign Min U1÷6.
FRICTION
4.13. Sign Max OPE (T1÷TX) + Sign Max DS.A.M.
4.14. Sign Min OPE (T1÷TX) + Sign Min DS.A.M.
4.15. Sign Max OPE (T1÷TX) + Sign Max FPSV.
4.16. Sign Min OPE (T1÷TX) + Sign Min FPSV.
* S.A.M. = Seismic Anchor Movements.
1
5. Displacements Report :
5.1. HYD.
5.2. OPE1÷X.
5.3. SUS.
5.4. OPE (TDESIGN) +WIND1÷4.
5.5. OPE (TDESIGN) +U1÷6.
5.6. OPE (TDESIGN) + DS.A.M.
5.7. OPE (TDESIGN) + FPSV.
6. Flange Peq. :
6.1. HYD.
6.2. OPE1÷X.
6.3. OPE (TDESIGN) +WIND1÷4.
6.4. OPE (TDESIGN) + FPSV.
7. Stress Summary:
7.1. HYD.
7.2. SUS.
7.3. EXP1÷X.
7.4. SUS + Sign Max WIND1÷4.
7.5. SUS + Sign Min WIND1÷4.
7.6. SUS + Sign Max U1÷6.
7.7. SUS + Sign Min U1÷6. NO
FRICTION
7.8. SUS + Sign Max FPSV.
7.9. SUS + Sign Min FPSV.
7.10. EXP + Sign Max DS.A.M.
7.11. EXP + Sign Min DS.A.M.
2
B. DYNAMIC STRESS REPORT :
1. Dynamic Input Report.
2. Active B.C.
3. Natural Frequencies.
4. Include Mass Report.
5. Displacements Report Operating + D.
6. Restraints Report Operating + D.
7. Stress Report Sustained + D
D. API Reports
3
E. Notes
O803300
Largest Dia. Rev. of
Pipe Line No. the Analysis
In system