Accomplishment
Accomplishment
1. Road Project
1.1 Alafashir - Faduni 10 km 250000 10 km 250000
1.2 Qedo Shonsho - Belfudi 8 km 200000 8 km 200000
1.3 Bildigilu - Belfudi 18 km 400000 18 km 400000
1.4 Wooden Bridge Work 1 in no 100000 2 in no 100000 3 in no 200000
1.5 Pipe Instalation 2 Place 100000 1 Place 50000 3 Place 150000
1.6 Bridge Construction (Baka & Gebo) 2 in no 2000000 2 in no 2000000
1.7 Bridge Study (Buchina & Anunu) 2 in no 350000 2 in no 350000
1.8 For Roads Maintenance 81 km 324000 117 km 461000 198 km 785000
1.9 Zumba - Gunfi 12 km 300000 12 km 300000
1.10 Gunfarba - Gunfioromiya 6 km 150000 6 km 150000
1.11 Haile - Buchi 6 km 120000 6 km 120000
1.12 Belfudi - Dabus 8 km 200000 8 km 200000
1.13 Bridge Construction (Buchina & Anunu) 2 in no 1600000 2 in no 1600000
4 Benshangul
Sub Total 3724000 2981000 6705000
2 Non Transport
2.1 Construction of H. post with furniture 2 in no 500000 1 in no 200000 700000
2.2 Construction of Primary School with furniture 2 in no 500000 500000
2.3 Purchasing Modern beehives 100 in no 50000 50000
2.4 Big Generator for irrigation 1 in no 120000 120000
2.5 Construction of Farmers Training Center 3 in no 200000 2 in no 140000 340000
2.6 Construction of Animal Health Station 4 in no 300000 2 in no 200000 500000
2.7 Grinding Mill (for Farmers assosiation) 2 in no 100000 100000
2.8 Moterized Spray Purchase 50000 50000
2.9 Construction of Secondary School with Furniture 2 in no 500000 500000
2.10 Fattening Cattles 25 in no 50000 50000
Sub Total 1770000 1140000 0 0 2910000
Total 5494000 4121000 9615000
Plan for 2000 Plan for 2001 Total
Physical
Physical Work Financial (Birr) Work Financial (Birr) Physical Work Financial (Birr)
No Region Description Grade PFP Community PFP Community PFP Community
1. Road Project
1.1 Fofa - Toba Completion Work 379362 Completion Work 379362
1.2 Bori - Semunama Completion Work 393168 Completion Work 393168
1.3 Fofa Toba - Sheteriya Completion Work 666596 Completion Work 666596
1.4 Keshli - Shosho Completion Work 301421 Completion Work 301421
1.4 Keshli - Geli Completion Work 402797 Completion Work 402797
1.5 Dori - Wangechi 4 km 274162 4 km 274162
1.6 Dori - Lepo 5 km 274162 5 km 274162
1.7 Bori - Semunama - Shosho 7 km 180000 7 km 180000
1.8 Fofa - Saja Junc. (Placing Selected Material) 5.1 km 150000 5.1 km 150000
1.9 Fofa Toba Megerna Azagni 3 km 274460 3 km 274460
1.10 Qoya Kepo Wesheklay - Dori Qeso 6 km 500000 6 km 500000
1.11 Fofa Toba Junc. - Fazelo School 2 km 80000 2 km 80000
1.12 Fofa Toba (Road Widening Work) 10 km 340000 10 km 340000
1.13 Keshli - Gesi (Placing Selected Material) 150000 150000
Sub Total 2143344 2222784 4366128
5 SNNP
2 Non Transport
2.1 Construction of Uninon Development Office 1 in no 147500 1 in no 147500 2 in no 295000
2.2 National resource & Forest Development 48000 60000 108000
2.3 Spring Construction 1 in no 182400 1 in no 182400
2.4 Hand Dug well Construction 250000 250000
2.5 Primary School Construction 1 in no 380000 1 in no 380000 2 in no 760000
2.6 Animal Health Post Construction 1 in no 136000 1 in no 136000 2 in no 272000
2.7 Farmers Training Center Construction 1 in no 86933.2 86933.2 1 in no 173866.4
2.8 fuel conserving stove & raw material purchase 50000 50000 100000
Sub Total 1030833.2 1110433.2 2141266.4 0
3 IMT
3.1 Moterized Bajaj (Three Tyre) 3 in no 198000 3 in no 198000
3.2 Cart (for Human) 10 in no 20000 10 in no 20000
3.3 Horse Purchase (for Cart) 10 in no 12000 10 in no 12000
Sub Total 230000 0 230000
Total 3404177.2 3333217.2 6737394.4
6 Somali
Physical Accomplishement
Road Length (km) Plan (km)
No Regions Plan Accomp. % 1997 1998 1999 2000 Total
1 Amhara 129.0 119.6 92.7 37.0 41.0 51.0 129.0
2 Benshangul Gumuz 118.0 116.4 98.6 27.0 16.0 51.0 24.0 118.0
3 Tigray 34.9 31.5 90.3 10.0 10.6 14.3 34.9
4 Oromiya 75.6 61.1 80.8 12.0 28.8 34.8 75.6
5 SNNP 60.0 63.1 105.2 14.0 30.0 16.0 60.0
6 Afar 61.0 30.0 49.2 18.0 12.0 31.0 61.0
7 Gambella 34.0 0.0 0.0 25.0 9.0 34.0
8 Somali 47.2 0.0 0.0 47.2 47.2
Total 559.7 421.7 75.3 190.2 138.4 207.1 24.0 559.7
1 Primary School
SNNP with Furniture
FTC With Furniture
Nursary
1 Tridel Pump
1 Health Post
Benshangul Gumuz 1 Health Post
1 FTC
Centrifugal Pump
2. Non Transport
2.1 Hand Dug well-with hand pump 1 in no 42000.00 1 in no 42000.00
2.2 Health Post construction 5 in no 276651.00 5 in no 276651.00
6 Afar 2.3 School construction (Primary) 1 in no 141452.00 1 in no 141452.00
2.4 RRA Capacity Building 287340.31 287340.31
2.5 Wereda Capacity Building 80009.00 80009.00
2.6 Equipment and Hand Tools 921373.00 921373.00
2.7 Sundries 55787.00 55787.00
2.8 Monitoring & Evaluation 25932.94 25932.94
2.9 Contingency 44000.00 44000.00
Sub Total 367349.31 1507195.94 0.00 0.00 1874545.25
Total 831605.51 2329717.94 0.00 0.00 30.0 3161323.45
Total Accomplishment (EFY)
Physical Work (EFY) Financial Accomplishment
Design Physical Financial
No Regions Description Standard 1997 1998 1999 2000 1997 1998 1999 2000
1.Road project 119060.05 119060.05
Korgeng-Katir 3.24 0.00
Korgeng-Kotonge 0.00
Korgeng-Nibnib 0.00
Sub Total 0 0 119060.05 0 119060.05
2. Non Transport
2.1 Veterinary post & Cattle crush 0.00
7 Gambella 2.2 water hand pump installation/hand dug well construction 132292.67 132292.67
2.3 Project Equipment 33052.34 557400.00 590452.34
2.4 Hand Tools 43140.37 6986.60 50126.97
2.5 Crush (Tender Document Preparation) 7228.00 7228.00
RRA Capacity 152722.00 149433.81 208485.38 510641.19
Wereda Capacity 62119.88 62119.88
Sub Total 361207.38 0.00 225768.29 765885.38 1352861.05
Total 361207.38 0.00 344828.34 765885.38 1471921.10
1.Road project
1.1 Galdile-Awbarre 0
1.2 Awbarre-Salahlay
1.3 Awbarre-TogWachale
1.4 Lafa isa-Heragal
Sub Total 0 0 0 0 0 0
2. Non Transport
8 Somali
2.1 Hand Dug Wells 3 in no 202952.82
2.2 Dam 1 in no 202952.82 0
2.3 Toilet 1 in no 0
3. Wereda Capacity Building 745647.38 745647.38
4. RRA Capacity Building 258332.25 258332.25
Sub Total 0 0 1206932.45 0 0 1206932.45
Total 0 0 1206932.45 0 0 1206932.45
GRAND TOTAL 421.70 32981434.19
1997 1998 1999 2000
% age Released % age
No Regions Released Fund Disbursed Released Fund (ETB) Disbursed Accomp. Fund (ETB) Disbursed Accomp.
USD ETB USD ETB USD ETB
1 Tigray 270507 2340561.82 182420.00 1584646.06 340393.50 2962342.51 0 #DIV/0!
2 Afar 240147 2077871.92 138160.00 1200170.31 415013.50 3611737.99 0 #DIV/0!
3 Amhara 270507 2340561.82 182420.00 1584646.06 340393.50 2962342.51 0 #DIV/0!
4 Oromiya 270507 2340561.82 182420.00 1584646.06 340393.50 2962342.51 0 #DIV/0!
5 SNNP 270507 2340561.82 182420.00 1584646.06 340393.50 2962342.51 0 #DIV/0!
6 Benishangul Gumz 240147 2077871.92 138160.00 1200170.31 2026443.00 415013.49 3611737.96 0 #DIV/0!
7 Gambella 240147 2077871.92 #DIV/0! #DIV/0!
8 Somali 240147 2077871.92 #DIV/0! #DIV/0!
Total 2042616 17673734.96 1006000.00 8738924.86 49.4458295 2191600.99 19072845.99 0.00 0 0 0 #DIV/0!
1998 (2005/06) (First & Second) 1999 (2006/07) (Third) 2000 (Fourth)
Released Fund Disbursed %age Released Fund Disbursed %age Released Fund Disbursed %age
Regions USD ETB ETB USD ETB ETB USD ETB ETB
Tigray 452927.00 3925207.88 0.00 0.0 340393.50 2962342.51
Afar 378307.00 3278042.23 0.00 0.0 415013.50 3611737.99
Amhara 452927.00 3925207.88 0.00 0.0 340393.50 2962342.51
Oromiya 452927.00 3925207.88 0.00 0.0 340393.50 2962342.51
SNNP 452927.00 3925207.88 0.00 0.0 340393.50 2962342.51
Benishangul Gumz 378307.00 3278042.23 2026443.00 61.8 415013.49 3611737.96 2669455.14 1943073.59
Gambella 240147.00 2077871.92 0.00 0.0 0.00 0.00
Somali 240147.00 2077871.92 0.00 0.0 0.00 0.00
Total 3048616.00 26412659.82 2026443.00 7.7 2191600.99 19072845.99
Total
Este - Walashi
Mekaneeyesus - Qomadebir DS 9 156.5 119.9
Mekaneeyesus -Agona
Walash - Jaragedo 5,786,034.00
Sub Total 156.5 119.9 5,786,034.00
2. Non Transport
Health post Construction 2, in no. 100% 159,500.00
Furniture for Farmer training center & Schools 100% 145,271.00
1 Amhara School Construction and furniture Purchase 2, in no. 100% 381,820.00
Construction of hand dug wells 13, in no. 75% 256,108.34
2. Non Transport
2.1 Hand Dug well-with hand pump 1, in no Completed 42,000.00
2.2 Health Post construction 5, in no Completed 276,651.00
6 Afar 2.3 School construction 1, in no Completed 141,452.00
2.4 RRA Capacity Building 287,340.31
2.5 Wereda Capacity Building 80,009.00
2.6 Equipment and Hand Tools 921,373.00
2.7 Sundries 55,787.00
2.8 Monitoring & Evaluation 25,932.94
2.9 Contingency 44,000.00
Sub Total 1,874,545.25
Total - 3,161,323.45
1.Road project 119,060.05
Korgeng-Katir 7 km
Korgeng-Kotonge 9 km
Korgeng-Nibnib 9 km
Sub Total 25km 119,060.05
2. Non Transport
2.1Veterinary post & Cattle crush 1, in no 0.00
23,268,628.54
669817.5
Released Fund to Regions for 1997, 1998 and 1999 EFY
1997 1998 1999 Total
No Regions USD ETB USD ETB USD ETB USD ETB
1 Tigray 270507.00 2340561.82 182420.00 1584646.06 340393.50 2962342.51 793320.50 6887550.39
2 Afar 240147.00 2077871.92 138160.00 1200170.31 415013.50 3611737.99 793320.50 6889780.22
3 Amhara 270507.00 2340561.82 182420.00 1584646.06 340393.50 2962342.51 793320.50 6887550.39
4 Oromiya 270507.00 2340561.82 182420.00 1584646.06 340393.50 2962342.51 793320.50 6887550.39
5 SNNP 270507.00 2340561.82 182420.00 1584646.06 340393.50 2962342.51 793320.50 6887550.39
6 Benishangul Gumz 240147.00 2077871.92 138160.00 1200170.31 415013.49 3611737.96 793320.49 6889780.19
7 Gambella 240147.00 2077871.92 0.00 0.00 0.00 0.00 240147.00 2077871.92
8 Somali 240147.00 2077871.92 0.00 0.00 0.00 0.00 240147.00 2077871.92
Total 2042616.00 17673734.96 1006000.00 8738924.86 2191600.99 19072845.99 5240216.99 45485505.81