Annex Ure
Annex Ure
Covered Area-
= 8183 Sq x Rs 2199
= Rs 1,79,94,417 /-
In Words- One Crore Seventy-Nine Lakh Ninety-Four Thousand Four Hundred Seventeen
Only
• Building Eleva on Plan: Designed per your choice with mul ple op ons.
mely delivery.
• Ceiling Height: 10’0”- 10’9” (as per client choice) from finished floor to finished floor, 8’3”-
9’0” (as per client choice) for s lt parking.
• RMC: Used for slabs and founda ons for uniform strength.
• PCC Mix: 1:4:8 (1 Cement: 4 Coarse Sand: 8 Aggregate) for open areas.
Flooring Prepara on
recommenda ons. Vibrator and hammer used for proper mixing and smoothing.
• Waterproofing: Dr. Fixit applied in bathrooms, kitchens, underground tanks, and terraces.
Kitchen
• Windows/Doors: Aluminium Powder Coated as per design, with op ons for exhaust fan
and ceiling fan
installa ons.
• Appliances: Auto-clean chimney with hob (Glen, Faber, or equivalent) up to both total
₹25,000, Instant Geyser up to ₹4000, RO water purifier up to ₹15,000. Microwave, OTG,
Refrigerator, Dishwasher is not in contractor scope.
Bathrooms
• Sanitary Ware & Fi ngs: CP shower mixer, washbasin fi ngs up to ₹70,000 per master
bathroom.
• Fans/Exhaust Fans: Ceiling fan up to ₹2500 and exhaust fan included per bathroom.
• Accessories: Mirror, toothbrush holder, toilet paper holder, towel rack, towel ring, up to
₹12,000.
• Ligh ng: Ceiling lights up to 4 pcs, 1 LED tube light above mirror.
• Main Door: Teak door with teak frames, veneer finish, locks, hinges, stoppers, magic eye,
• External/Balcony Doors: Aluminum powder-coated, with fixed and sliding por ons,
• Bathroom Windows: Aluminum with exhaust fan fi ng. Wooden door frames with
termite treatment.
False Ceiling
• Design: Decora ve false ceiling as per your choice, with cove lights.
Paint Work
• Modular Wardrobes: Up to ₹1500 psf in all bedrooms with hanging rods, hinges, closing
Building Facade
• Materials: Mix of paint, MS work, railing, glass, HPL, texture paint, Italian marble/granite.
• Ligh ng: LED lights included as per design.
• Glass: Saint Gobain/ASI float glass, 8mm thick, with toughened glass for
exterior/balconies.
• Ligh ng & Security: Decora ve outdoor gate lights up to ₹10,000 total, video door phone
(CP Plus or equivalent), call bell, ramp as per architect design, 4 CCTV cameras up to
• Ligh ng: Branded ceiling lights up to ₹400 each, per room as specified.
• Fans: Ceiling fans up to ₹8000 each for bedrooms, and drawing rooms.
Miscellaneous
• Pooja Room: Included with lights, door, and all accessories, up to ₹20,000.
Points to Remember
• U li es: Water and electricity connec on for construc on to be provided by the owner.
• Marble Work: Available at addi onal cost, with le cost adjusted accordingly.
• Li Sha : Pit, li room civil work in the scope of the contractor. Cost of the li , cabling,
1. Handover of Site
No deduc ons will be applied for the non-performance of specific tasks such as
cutouts, li s, sha s, sunken areas, or combined wall and ceiling plaster.
3. Client Responsibili es
The client is responsible for all liaison, sanc ons, and approvals from various
departments, as well as all other legal formali es.
The client will cover the cost of all government taxes, du es, security deposits to
authori es/society/local bodies/police, building permits, plinth concrete, comple on
cer ficates, sewage connec ons, and both permanent and temporary water and
electricity connec ons on an actual cost basis.
Any project-specific approvals not listed above (e.g., tree cu ng, pole shi ing) are
excluded and must be paid for directly by the client.
4. Payment Terms
Structural Work
At the time of agreement 5%
At a time of Civil work start 5%
Start of Foundation work 15%
Start of First Floor Column 10%
Start of Second Floor Column 10%
Start of Third Floor Column 5%
Total 50%
Finishing Work
Start of GF Flooring & Finishing Work 15%
Start of FF Flooring & Finishing Work 15%
Start of SF Flooring & Finishing Work 10%
Start of TF Flooring & Finishing Work 5%
Start of Boundary Work 2.5%
Your dream Handover 2.5%
Total 50%
If other agencies need to work concurrently, they must be appointed well in advance.
6. Site Management
7. U li es and Permissions
The client will ensure the provision of water and electricity required for construc on
and domes c purposes for labour.
The client will obtain all necessary permissions from relevant authori es/builders/
society/ maintenance agencies to facilitate the smooth movement of resources.
Should the market price of cement exceed Rs. 400 per bag (including GST) or the
price of steel bars exceed Rs. 60 per kg (including GST), the client will bear the
addi onal cost.
10. Exclusions
Air condi oners, li s, servo systems, generators, ovens and Solar Panel are not
included in this contract.
Firefigh ng work, if required by regula ons, will be provided by the client.
Interior designer fees and related work are not included and will be charged
separately.
Ceiling plaster work is excluded except for the s lt, staircase, kitchen, balcony
ceilings, and passage areas.
Interior Wall Panelling, furniture (sofa, bed, dining table etc), Pergola, Gazebo is not
in contractor’s scope.
11. Quality Control
Cube tests for all significant concre ng work must be conducted and recorded for
future reference.
Any addi onal work will be performed with the client's consent and will be ini ated
a er agreement.
Site photographs and tes monials may be u lized for business or promo onal
purposes, including online pos ng on social media or for marke ng and adver sing.
All disputes will be resolved through binding arbitra on in accordance with Indian
Arbitra on Law, with jurisdic on in Faridabad, Haryana.
The arbitrator will be appointed by RCC.