0% found this document useful (0 votes)
5 views

project_work_Time_line_A

The document outlines the timeline and deliverables for the Mini Project course for CSE(DS) students at Gokaraju Rangaraju Institute of Engineering and Technology for the academic year 2024-2025. It details the various project reviews, including requirements for presentations and submissions at each stage, from project title selection to final execution and participation in a roadshow. Additionally, it emphasizes the importance of following guidelines set by the project supervisor and adhering to plagiarism policies.

Uploaded by

bhoyarsaraswathi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

project_work_Time_line_A

The document outlines the timeline and deliverables for the Mini Project course for CSE(DS) students at Gokaraju Rangaraju Institute of Engineering and Technology for the academic year 2024-2025. It details the various project reviews, including requirements for presentations and submissions at each stage, from project title selection to final execution and participation in a roadshow. Additionally, it emphasizes the importance of following guidelines set by the project supervisor and adhering to plagiarism policies.

Uploaded by

bhoyarsaraswathi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

GOKARAJU RANGARAJU INSTITUTE OF ENGINEERING AND TECHNOLOGY

(Autonomous)
Department of Data Science
III B. Tech II Semester Mini Project
Project work TimeLine
Branch : CSE(DS), A-Section Academic year : 2024-2025
Course name : Mini Project with Seminar Course Code : GR22A3089
Dates
Project reviews Description/Deliverables (subject to
change)
Review 0: Project title ⮚ Student has to prepare a presentation highlighting his ideas
selection on 3 different topics. 28th Jan 2025
Deliverables:
⮚ Tile of the finalized project.
⮚ Student should give the abstract view of the project work;
Review 1: Abstract briefing the methodologies, importance etc.
presentation 4th Feb 2025
Deliverables:
⮚ Two pages draft of the project work an abstract view of what
the student is going to do.

⮚ Student has to prepare slides which should include literature


survey (minimum of 20 papers to be referred) and identify
the issues/gaps, problem statement, objectives and
Review 2: Architectural architectural diagram. 11th Feb 2025
Design Presentation &
th
Deliverables: 18 Feb 2025
⮚ A Drafted copy of the same has to be submitted.

⮚ Student has to present in detail about their project modules,


methodologies and implementation details. 25th Feb 2025
Review 3: Modules &
Presentation Deliverables: th
4 Mar 2025
⮚ Have to submit the same in the draft form.

⮚ Student should execute the project before the committee


along with code go through, and also present the test case
that are considered for evaluation.
Review 4: Execution 25th Mar 2025
Cycle 1 Presentation Deliverables: &
⮚ Has to submit the code with comments and relevant test 1th
Apr 2025
cases. He should follow coding standards.
⮚ Final presentation should include all those changes that have
been suggested in the previous Review 4. Freeze the project
for completion.
Review 5: Execution 8th Apr 2025
Cycle 2 Presentation Deliverables: &
Has to draft a paper for Technical Event participation in 15th Apr 2025
project area/ MOOCs Course in project area/ Paper
Publication/Publishing or Granting of a Patent/Hackathon
participation/Book Publication.
Roadshow ⮚ Has to participate in the road show organized by the
department.
29th Apr 2025
Deliverables:
Has to submit the Abstract Form, Project Pulse, manuscripts
along with the final draft.

Note:
1. Project Review Committee consists of HoD, Project Coordinator and Supervisor.
2. Student are deemed to follow the Supervisor/Guide throughout the project execution in all
aspects.
3. Supervisor/ Guide has to assess the student continuously and should evaluate the project
progress.
4. Plagiarism check is compulsory for project work report as per the plagiarism policy of
GRIET.
5. The internal exam shall be conducted before 14th May 2024.

Project Coordinator HOD

You might also like