progress report

The weekly progress report details the ongoing construction tasks, including excavation, foundation works, and painting, with most tasks nearing completion at 99%. Some tasks are pending due to weather conditions and electrical issues, affecting overall progress. The document also includes a breakdown of materials needed for various project locations, totaling significant lengths of steel rebar required.

Uploaded by

lunamarvin047
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

progress report

The weekly progress report details the ongoing construction tasks, including excavation, foundation works, and painting, with most tasks nearing completion at 99%. Some tasks are pending due to weather conditions and electrical issues, affecting overall progress. The document also includes a breakdown of materials needed for various project locations, totaling significant lengths of steel rebar required.

Uploaded by

lunamarvin047
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Weekly progress report

Description of works
Ground floor:
Excavate works;
Pedestal works;
Rebars Installation etc.
Total of Pedestal = 133

Pedestal works 100%


Not include 30%
Balance 3%
Balance `
Not include
Pedestal works
0% 20% 40% 60% 80% 100% 120%
WEEKLY PROGRESS REPORT
Project
Task Description Start date End date Duration Status Acc.% Remarks
details

Task 1 Excavation and site preparation 10/21/2024 10/26/2024 5 On-going 99%

Weather conditions may


Task 2 Foundation and footing works 10/21/2024 10/26/2024 5 On-going 99%
impact progress

Task 3 Primer paint for "I" Beam 10/21/2024 10/26/2024 5 On-going 99%

Task 4 Welding Works 10/21/2024 10/26/2024 1 Pending 1% Electrical short circuit

WEEKLY PROGRESS REPORT


Project
Task Description Start date End date Duration Status Acc.% Remarks
details

Task 1 Excavation and site preparation 10/28/2024 11/02/2024 5 On-going 99%

Task 2 Foundation and footing works 10/28/2024 10/30/2024 2 On-going 99%

Regular Holiday of November


Task 3 Backfilling of soil and leveling 10/28/2024 11/02/2024 5 On-going 99%
1&2 all souls day
Regular Holiday of November
1&2 all souls day

Task 4 Sewer works 10/31/2024 11/02/2024 2 On-going 99%

Task 5 Primer paint for I Beam" 10/28/2024 10/31/2024 3 On-going 90%

24

24

24

24

4
20

20

20

20

02

02

02
/2

/2

/2
8/

9/

0/

1/
/2

/2

/3

/3

/1

/2

/3
10

10

10

10

11

11

11
Excavation and site preparation

Foundation and footing works

Backfilling of soil and leveling

Sewer works

Primer paint for I Beam"

WEEKLY PROGRESS REPORT


Project
Task Description Start date End date Duration Status Acc.% Remarks
details
Backhoe excavator sunk in the
Task 1 Excavation and site preparation 11/6/2024 11/9/2024 3 On-going 80%
mud
Weather conditions may
Task 3 Backfilling of soil and leveling 11/7/2024 11/9/2024 2 On-going 80%
impact progress
Workers "AWOL"(Adbsent
Task 5 Applied Primer paint for I Beam" 11/5/2024 11/9/2024 4 On-going 80%
without leave)

24 24 24 24 24 24 24
20 20 20 20 20 20 / 20
/ / / / / / 0
/4 /5 /6 /7 /8 /9 /1
11 11 11 11 11 11 11

Excavation and site preparation 11/6/2024 3


24 24 24 24 24 24 24
20 20 20 20 20 20 / 20
/ / / / / / 0
/4 /5 /6 /7 /8 /9 /1
11 11 11 11 11 11 11

Excavation and site preparation 11/6/2024 3

Backfilling of soil and leveling 11/7/2024 2

Applied Primer paint for I Beam" 11/5/2024 4


10/21/2024 10/22/2024 10/23/2024 10/24/2024 10/25/2024 10/26/2024

Primer paint for "I" Beam


10/26/2024
BILL OF MATERIALS
BREAK DOWN;

MATERIALS DESCRIPTION:

STEEL REBARS SIZES; 20Ø


16Ø

PROPOSED LOCATIONWARE HOUSE & SUPER MARKET


TOTAL AREA OF: 2,088 (SQM)

VERTICAL ROW (BEAM&COLUMNS)

20Ø 39m X 4 = 154m X 4 = 642 m


16Ø 39m X 2 = 78m X 4 = 312 m

20Ø 32m X 4 = 128m X 7 = 896 m


16Ø 32m X 4 = 64m X 7 = 448 m

HORIZONTAL ROW (BEAM&COLUMNS)

20Ø 33m X 4 = 132 m


16Ø 33m X4 = 66 m

20Ø 90m X 4 = 360m X 4 = 1,440 m


16Ø 90m X 2 = 180m X4 = 360 m

TOTAL METERS: 20Ø 3,110 m


16Ø 1,186 m

LOCATION:
TOTAL AREA OF; 566 (SQM)

HORIZONTAL ROW (BEAM&COLUMNS)

20Ø 16m X4 = 64m X 6 = 384 m


16Ø 16m X 2 = 32m X 6 = 192 m
PROPOSED LOCATIONGROCERY STORE
TOTAL AREA OF; 2,016 (SQM)

VERTICAL ROW (BEAM&COLUMNS)

20Ø 32m X 4 = 128m X 8 = 1,024 m


16Ø 32m X 2 = 64m X 8 = 512 m

HORIZONTAL ROW (BEAM&COLUMNS)

20Ø 56m X 4 = 224m X 4 = 896 m


16Ø 56m X 2 = 112m X 4 = 448 m

TOTAL METERS: 20Ø 2,304 m


16Ø 1,152 m

LOCATION:
TOTAL AREA OF; 520 (SQM)

20Ø 16m X 4 = 64m X 5 = 320 m


16Ø 16m X 4 = 32m X 5 = 160 m

20Ø 42m X 4 = 168 m


16Ø 42m X 4 = 84 m

PROPOSED LOCATIONHARD WARE


TOTAL AREA OF; 1,014 (SQM)

20Ø 41m X 4 = 164 m


16Ø 41m X 2 = 82 m

20Ø 32m X 4 = 128 m


16Ø 32m X 2 = 64 m

20Ø 32m X 4 = 128 m


16Ø 32m X 2 = 64 m

20Ø 41m X 4 = 164 m


16Ø 41m X 4 = 82 m
20Ø 8m X 4 = 32 m
16Ø 8m X 4 = 16 m

TOTAL METERS: 20Ø 1104 m


16Ø 552 m

FINAL TOTAL METERS OF; 20Ø 6,518 m 724 PCS


16Ø 2,890 m 321 PCS

PREPARED BY;
Calvin tabada
WEEKLY PROGRESS REPORT CHART

Project
Task description Start date End date Status acc.% Remarks
details

Task 1 Excavation and site preparation 10/21/2024 10/26/2024 in progress 99%


Weather conditions may impact
Task 2 Foundation and footing works 10/21/2024 10/26/2024 in progress 99%
progress
Task 3 Primer paint for "I beam" 10/21/2024 10/26/2024 in progress 99%

Task 4 Welding works 10/21/2024 10/26/2024 pending 11% Electrical short circuit

WEEKLY PROGRESS REPORT CHART

Remarks

acc.%

0% 20% 40% 60% 80% 100% 120%

Task 4 Welding works 10/21/2024 10/26/2024 pending Task 3 Primer paint for "I beam" 10/21/2024 10/26/2024 in progress
Task 2 Foundation and footing works 10/21/2024 10/26/2024 in progress Task 1 Excavation and site preparation 10/21/2024 10/26/2024 in progress