0% found this document useful (0 votes)
8 views2 pages

PowerApplicationForm 280125-1858 (1)

This document is an application and agreement for power supply from TANESCO for an individual customer, Benedicto Lucas Masiaga, in Mwanza, Tanzania. It outlines customer details, installation inspection requirements, and conditions of power supply, including responsibilities and penalties for non-compliance. The application was submitted on January 28, 2025, with a focus on residential power supply.

Uploaded by

emmatabani23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views2 pages

PowerApplicationForm 280125-1858 (1)

This document is an application and agreement for power supply from TANESCO for an individual customer, Benedicto Lucas Masiaga, in Mwanza, Tanzania. It outlines customer details, installation inspection requirements, and conditions of power supply, including responsibilities and penalties for non-compliance. The application was submitted on January 28, 2025, with a focus on residential power supply.

Uploaded by

emmatabani23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

THE UNITED REPUBLIC OF TANZANIA

MINISTRY OF ENERGY
TANZANIA ELECTRIC SUPPLY COMPANY LIMITED
(TANESCO)

Plot No. 114, Block G, Dar es Salaam Road, P.O.Box 453 Dodoma, Contact: 0748550000, Mail: [email protected], Website: www.tanesco.co.tz

APPLICATION AND AGREEMENT FOR POWER SUPPLY


NYAKATO, LAKE ZONE
Category: NEW SUPPLY Application No: 280125-1858

CUSTOMER DETAILS
Name: BENEDICTO LUCAS MASIAGA

ID No: 19831122332190000227 ID Type: NATIONAL ID

Type of Customer: INDIVIDUAL

Property ownership: OWNER

Postal address: 163 MWANZA Telephone: +255757277784

Mobile No: +255757277784 E-mail: [email protected]

Surveyed area: Plot No: Block No:

Region: MWANZA District: ILEMELA

Ward: SHIBULA Street: MASEMELE

Special Mark: MASEMELE SENTA

Purpose of power supply: RESIDENTIAL

Application fee paid (TZS): FREE/HAIUZWI Receipt No: NOT APPLICABLE Date: 28-January-2025

ELECTRICAL CONTRACTOR PARTICULARS


Company name:

Address: Tel:

C.R.B Reg No: E.L.B Licence No:

INSTALLATION INSPECTION
a) Visual inspection: Earthing method:

b) Earthing resistance (ohms):

c) Insulation resistance (Mohms): R-E: Y-E: B-E:

R-Y: Y-B: B-R:

d) Earth fault loop impendance (ohms):

e) Earth leakage current protection device installed: Type: Rating (V):

Tripping earth leakage current (mA): Rating (A):

f) Anticipated load (kW):

g) The above installation will be ready for connection on (strictly date):

h) I certify that the installation detail in this card has been inspected in accordance with Electricity Act No. 10 of 2008 and that to the
best of my knowledge and the installation summarized in the drawings/schedules attached complies with those regulations current
at the date for the work.

Contractor's representative:

Signature and official stamp: Date:


THE CONDITIONS OF POWER SUPPLY
(Available at our office on request)

1. Not to alter or temper with the index of any meter or other instrument used on or in connection with any installation for recording

the output or consumption of electricity.

2. Not to fraudulently abstract, consume or use electricity contrary to the manner agreed herein. Errors resulting from tempering of

meters will be regarded as fraud and may result in prosecution in addition to penalty charges.

3. To install power stabilizer device(s) for the purpose of safeguarding the sensitive appliances of the capacity which is equivalent to

the actual consumption of power at his/her premises.

4. To install residual currency device (RCD) so as to protect against earth leakage. Also to install Circuit Breaker to protect against

short circuit or over current.

5. To install any other additional device(s) to protect the home electrical appliances against over current or short circuit.

6. Not to convert the uses of electricity to other uses contrary to use that is specified in the application and agreement form.

7. To strictly maintain the power factor of 0.95 for lighting and 0.9 power factor for other loads. That a factor of 2.9 will be multiplied

to the consumed energy as a surcharge against poor power factor whenever the billing power factor fall below 0.9

8. Any person who moves into a premise where TANESCO is providing supply should report to TANESCO offices within hours to

regularize the contract, failure to do that, will result in supply be disconnected and legal proceedings instituted

9. Any customer who intends to move out of a premise where TANESCO is providing supply should report to TANESCO offices

within 48 hours to cancel the existing contract. Failure to do so will result in the customer assuming all charge that may be

calculated after the vacation of premises.

10. Without prejudice to the generality of the above to comply in all respects with the provisions of any statutes and any other

obligations imposed by law or by any by-law applicable on electricity supply within Tanzania mainland.

11. The customer accepts the responsibility for the safe keeping of TANESCO's properties installed on the customer's premises,

especially the integrity of the meter and the associated seals, the breach of which will amount to statutory penalties and payment

of associated costs.

12. TANESCO reserve the rights to disconnect a customer in the event of any breach of these conditions

AGREEMENT
I the undersigned occupant of the above premise(s) have read, understood and accepted all conditions of power supply including

the above and hereby undertake with the company to take a supply of electricity at the above premise(s) in accordance with the

company's general conditions of supply for the purpose detailed above and agree to pay for such supply at the company's

standard rates in force from time to time.

28-January-2025

OCCUPANT/CUSTOMER SIGNATURE DATE

You might also like