2024-TD19026
2024-TD19026
# 2024-TD19026
Bill To
ERAM ENGINEERING
Level 5 Tower A
Khobar Business Gate
PO Box 76629 Al Khobar 33442
Saudi Arabia Quote Date : 12 Feb 2024
Subject :
RFQ FOR ERAM ENGINEERING
Material Specification:
Carbon Steel Plate
Base Metal Thickness:
1.5mm - 19mm
Groove:
35° bevel
Root Gap:
2mm - 6mm
Test Position:
3G Uphill
Weld Joint:
Butt Joint
Filler materials:
SMAW - E7018-1
GTAW - ER70S-6
Filler Metal Size:
SMAW - 2.5, 3.2 & 4.0mm
GTAW - 2.0 & 2.4mm
Gas Cup Size:
Number 5 - 8 (GTAW)
Shielded Gas:
100% Argon
Tungsten:
2% Thoriated (WT20)
2.4mm x 175mm
Filler Rod:
ER70S-6
2.4mm
Welding Pass/es:
Root pass - GTAW
Material Specification:
Carbon Steel Pipe
Sch. 40
SA 106 GR B
A333 GR6
API 5L GR B
SA 53 GR. B
Groove:
37° Single bevel
Root Gap
3 mm
Root face:
0 - 2mm
Test Position
6GR
Angle:
45°
Filler Materials:
SMAW E7016-1 2.5mm
FCAW E71T-1
Shielded Gas:
100% C02 - FCAW
Welding pass/es. Root Pass - SMAW
Filling - FCAW
Capping - FCAW
SMAW/FCAW
Material Specification:
Carbon Steel Pipe
Sch. 40
SA 106 GR B
A333 GR6
API 5L GR B
SA 53 GR. B
Groove:
37° Single bevel
Root Gap
3 mm
Root face:
0 - 2mm
Test Position
6GR
Angle:
45°
Filler Materials:
SMAW E7016-1 2.5mm
FCAW E71T-1
Shielded Gas:
100% C02 - FCAW
Welding pass/es. Root Pass - SMAW
Filling - FCAW
Capping - FCAW
Total $2,129.06
We are pleased to submit our formal quotation on the above subject as follows:
A. SCOPE OF WORK
Filjap Welding Institute shall provide the required manpower, equipment, materials and consumables necessary for welding tradetesting
of pipes/plates for employer/landbased recruitment agency/company screening to be conducted at 421 Palmera St cor Figueras St Brgy
402, Sampaloc City of Manila
B. COST OF PROPOSAL
For the implementation and completion of the above Scope of Work, Filjap Welding Institute shall charge the employes/landbased
recruitment agency/company addressed to this proposal as follows:
VAT in the Philippines is levied on almost all service and import sales, as well as the exchange, barter, or lease of goods or properties. The
tax is based on the gross selling price of properties and goods sold, or gross receipts from the sale of services, and is equivalent to a
uniform rate of 12%.
C.1 A Contract shall be issued in favor of Filjap Welding Institute prior to start of work; this proposal shall serve as a contract if
the “Conforme” portion hereunder is signed.
C.2 As per you our company policy, Customer’s Conforme and 50% down payment are required in processing of orders.
C.3 Plates and Pipes output after the tradetesting only have 15-calendar days leeway after the client has been notified to pick
up their plates and pipes, otherwise they will be deemed abandoned in favor of Filjap Welding Institute and Tradetest Center Inc.
C.4 No cancellation of order and down payment is non-refundable. Payment of the remaining balance shall be made on the day
of the actual testing.
D. VALIDITY
This quotation is valid only 5 days upon acknowledgement of receipt (if short notice please refer to expiry date of this quotation) otherwise
it shall be subject to our confirmation.
Thank you very much for giving us the opportunity to submit this quotation and we look forward to doing business with you soon.
CONFORME:
Please review the submitted quotation. In case you have any questions, please call our Hotline: +(63)2 83721419 or send email thru
[email protected]. Quoted prices are subject for final confirmation before placement and acceptance of formal order.