Facility-Inspection-Simple_Example
Facility-Inspection-Simple_Example
Shop Office Broken desk leg Jane - Moved manuals C June 15th
and inspection logs to
reduce stress load.
Jane - New desk was
already ordered and is
on the way.
Shop Floor Racking was struck Jane – Immediately had A June 15th
and leg is bent column unloaded and
Poor housekeeping taped off. C
Jane – New upright to June 2nd
be ordered.
Omar – Conduct safety
meeting on both topics
Loading Dock Exterior light broken Jane – Will have Todd B June 2nd
Yellow tape is peeled replace light. C
off ground (safe-zone Jane – Will order more June 15th
markings) tape. Have Todd replace
markings once it arrives.
Guidance:
A − Indicates that the deficiency must be marked and isolated if possible. Work must stop and an assessment must be
conducted to determine the appropriate corrective action. Supervisor sign-off is required before restarting.
B − Indicates that the deficiency must be reported to a supervisor immediately. Also, a short-term corrective action plan
must be designed and implemented before work continues.
C − Indicates that the deficiency should be noted and reported to a supervisor by the end of the shift. The deficiency
needs to be communicated to all workers on-site immediately. Corrective action must be designed and implemented
within three days.