Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
DATA HALL 1 1869.1 Aug 1500 106679 10.0 2241.6 47.59
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.031 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4529.6 BTU/(hr-CFM)
Site Altitude = 1289.0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.031 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4529.6 BTU/(hr-CFM)
Site Altitude = 1289.0 ft
1. Outdoor Air
2. Mixed Air
3. Central Cooling Coil Outlet 1 0.024
4. Supply Fan Outlet
5. Room Air
0.022
0.020
0.016
0.012
0.010
0.008
324 0.006
5
1 0.004
0.002
0.000
30 40 50 60 70 80 90 100
Temperature ( °F )