The document contains a Certificate of Conformance for a work order related to a part ordered by Marinsa International, confirming that the part meets all specified requirements. It includes inspection details, testing reports for air leak and penetrant tests, both of which indicated no defects. The final inspection was conducted by Freddy Joseph, with the document dated October 26, 2023.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0 ratings0% found this document useful (0 votes)
2 views6 pages
Flexible_Fuelle_Escape
The document contains a Certificate of Conformance for a work order related to a part ordered by Marinsa International, confirming that the part meets all specified requirements. It includes inspection details, testing reports for air leak and penetrant tests, both of which indicated no defects. The final inspection was conducted by Freddy Joseph, with the document dated October 26, 2023.