Shila & Brothers (Pvt.) Ltd. has issued work orders to MIS Sadakalo Enterprise for the supply of Sylhet sand and black stone chips for the Padma Bridge Rail Link Project, specifying quantities, rates, and delivery conditions. The orders detail quality requirements, payment terms, and the right to cancel the orders under certain conditions. The total amounts for the orders are 780 million Taka for sand and 4 billion Taka for stone chips.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0 ratings0% found this document useful (0 votes)
1 views3 pages
Experience Certificate
Shila & Brothers (Pvt.) Ltd. has issued work orders to MIS Sadakalo Enterprise for the supply of Sylhet sand and black stone chips for the Padma Bridge Rail Link Project, specifying quantities, rates, and delivery conditions. The orders detail quality requirements, payment terms, and the right to cancel the orders under certain conditions. The total amounts for the orders are 780 million Taka for sand and 4 billion Taka for stone chips.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
@ SHILA & BROTHERS (PVT.) LTD.
Export Import Stone Raw Cotton
(S™ FLOOR), RIDGE DALE TOWER, PROGOTI SARANI,
NORTH BADDA, DHAKA-1212.
MOB: 01713-044874, 01973-044874
WORK ORDER FOR SUPPLING SHYLHET SAND
Refi CRCSBLUG2UYZ ZC, Date: 27072019
To
MIS Sadakalo Enterprise
1806, Roisnagar Schoo! Road, Rayerbag,
Kadamtol, Dhaka-1362,
Mobile: 01766-777-999, 01972.097-867
‘Subject: Sylhet Sand_2.5 fm Supply Order For Shila & Brothers Project
With References to your intention dated 21.07.19 on the above-mentioned subject, We hereby placed
‘Supply order ofthe following material as per the Authority’ asking standard specification referred in
the atachment:
{SLINO [Material ‘Size/Spec | Quantity | Rate Total Amount
| }__ L ___|__(@DT)
1. | Sythet Sand 2. 1 2CroreCFT 39 thief 780,000,000/-
|Iin word: Seventy Eight Crore Taka Only
Present Dumping Point China Railway Project site for PADMA Bridge Rail Link, Pulia,
‘Shurjonagar, Bhanga, Faridpur (Opposite of MP Nixon Chowdhury House and Joy Bangla Circle.)
1. The sand has to be Sylhet origin and has to be submitted laboratory testing reports and import
documents copy to met-up the requirement of CREC referred inthe attachment also If
project concern not accepts supplied sand, that responsibility is yours.
2. ‘The rate is up to delivery at the dumping site. The Vat, Tax, Transport, Loading and
unloading cost are excluding from the rate.
‘Sand should have to be mud, soil and dirt free and with highest quality.
‘Payment: After every $0,000 CFT by Payee Cheque/Cash Within 03 Working Days.
‘Supplier will get Two Crore Tk LC For per One Crore CFT Sand after the Work Order.
We have the right to cancel this supply order at any time, without any reason/ any reason
arises from the authority or any side or any fault.
7. Supplier Or Authority Both should inform for the cancel the work order within minimum 2
‘month ago.
18. This work order will continues for | year.
Ifthe above terms & condition are acceptable to you, please sign this work order as taken of
‘your dealing acceptance to ensure the supply at the site in due ti
Shila: Pvt) Lid
‘Md. Awal Kran
Managing Director
Shila & Brother( pvt.)LtdSHILA & BROTHERS (PVT.). LTD.
Export Import Stone Raw Cotton
‘7S2CHA (5™ FLOOR), RIDGE DALE TOWER, PROGOTI SARANI,
NORTH BADDA, DHAKA-1212.
MOB: 01713-044874, 01973-044874
E-mail: shilabrothers14@ gmail.com
Ref, CRCE.SBI.(28)2019 ate: 25/08/2019
To
WIS Sadakalo Enterprise
1806, Roisnagar School Road, Rayerbag,
Kadamtoli, Dhaka-1362
Mobile: 01766-777-999, 01972-097-867
‘Sabject: Work Order LC Black Stone Chips Supply for Padma Bridge Rail Link Project,
Dear Sir,
With due respet as per your respective quotation & negotiation we are pleased to piace work order
{for black stone chips as per following tems snd conditions:
‘Here are the rate and specification:
‘SL | —Partcalars [Stone Size Quantity Rate (11) —| Total Amount
‘Oi | TC Black Sione Chips | 05-10 mm 05 Lac Metric Tan | 000/Tk per Tou | 2,000,00,000/-
(Dxbai/Oman).
TIC Black Sione Chips | 10-20 mm — [05 Las Wate Ton | 80007TK per Ton | 2,000,000,0007-
(Dubai/Oman)
"Tosa | 4000, 000,0007-
Ta word Four Hundred Crore Taka only
‘Terms & Condition:
1. Present Dumping Polnt: China Railway Project site for PADMA Bridge Rail Link, Poli,
Shurjonaga, Bhangs, Faripur (Opposite of MP Nixon Chowdhury House) (Site 10 mixing
‘Station, nd sso atthe next dupmping points asked by CREC.SHILA & BROTHERS (PVT.) LTD.
Export Import Stone Raw Cotton
‘7822CHA (5™ FLOOR), RIDGE DALE TOWER, PROGOTI SARANI,
NORTH BADDA, DHAKA-1212.
MOB: (0171.3-044874, 01973-04874
Esmail: sulabrothers1 4 gmail.com
2. The Stone chips has to be Black LC and Omar/Dubai origin and has tobe submitted laboratory
‘esting reports and import documents copy to met-up the requirement of CREC refered in the
attachment also. The Stone should have to mad, soil, and drt fre & highest quality. If project
‘concer not accep supplied stone, that responsibilty is yours.
5. The rate is up to delivery a the dumping site and unloading cot willbe provided by authority. The
‘Vat & Tax are excluding fiom the rat.
4. Delivery should be ensured with SBL. ““BNS-ESSENCE CONSORTIUM” challan copy, which
will be provided by us. Minimum billing quantity 1000 meric ton and suppliers have to submit
bill supported bythe delivery challn duty signed by authorized office.
5. LIC opening quantity 50,000 metric ton@4000 tk per ton amount in BDYT 200,000,000 and LiC
will be open 10% margin in smount BDT' 20,000,000/- balance amount LIC transfer after Bank to
‘Bank performance guarantee Iter.
‘6 L/C should be revolving every 50,000 metric ton @4000 tk per ton.
7. Payment terms: Bill should be submitted to the LIC receiver Bank after every 1,000 ton or above
and L/C sender Bank wil give us acceptance within 03 working days
8. The supplier shall start delivery of goods 5-10 mm and 10-20 mm black stone chips afte the date
of receiving L/C and as wel as complete the all Banking formalities of both party und continue of
delivery upto farther decision 02 years.
9. Failing of supply should be considered as paying of financial loss issue.
10, We have the right to eancel this supply order at any time, if any reason aise from the Authority or
any side or any fault
If you are acceptable the above terms & conditions, please sign this work order as taken of your
sealing acceptance to ensure the supply at the site in due time.
* a W, nde
‘Awal Khan ‘Shapno Pahar (Pv. Limited
‘Managing Director ‘Mossammot Nazma Akter
‘Shia & Brothers (Pvt) Li. ‘Managing Director
Accepted