0% found this document useful (0 votes)
53 views1 page

01009-OTK-PRO-DWG-0008 - HP Separator

The document outlines specifications for the HP Separator, including shutdown flushing points and required orifice straight lengths. It details operational parameters such as pressure, gas, oil, and water capacities, along with provisions for future chemical injection and instrument connections. Additionally, it specifies the flow station code and electrical panel requirements for each package.

Uploaded by

Morgan Sideso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views1 page

01009-OTK-PRO-DWG-0008 - HP Separator

The document outlines specifications for the HP Separator, including shutdown flushing points and required orifice straight lengths. It details operational parameters such as pressure, gas, oil, and water capacities, along with provisions for future chemical injection and instrument connections. Additionally, it specifies the flow station code and electrical panel requirements for each package.

Uploaded by

Morgan Sideso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ITEM NO: V-102 1. SHUTDOWN FLUSHING POINTS.

SK-005 2. SENIOR ORIFICE STRAIGHT LENGTH 10D UPSTREAM & 5D DOWNSTREAM ARE
UNIT: HP SEPARATOR
REQUIRED.
2,000 mm ID X 6,000 mm S/S
3. DELETED.
34.47 BARG(500 PSIG)@ 50℃
4. PROVISION FOR FUTURE CHEMICAL INJECTION.
20.86 BARG(303 PSIG) @ 45℃
5. VALVE TO BE CLOSED WHEN USING AIR FOR INSTRUMENTS.
30 MMSCFD GAS 3 MMSCFD GAS
6. DELETED.
20,000 BPD OIL 2,000 BPD OIL
1,000 BPD WATER 18,000 BPD WATER 7. PSV SPARED.
(5% WATER CUT CASE) (90% WATER CUT CASE) 8. BYPASS TURBINE METER TO BE USED DURING TURNDOWN OF 20000 BOPD.
9. DELETED.
10. DELETED.
11. OTAKIKPO FLOW STATION CODE SHALL BE 10, WHILE ALL INSTRUMENTS IN
OTAKIKPO PHASE 2 FLOW STATION SHALL BE PREFIXED WITH 05. E.g.
SK-005 SDV-101 WILL BE 1005-SDV-101.
12. EACH PACKAGE SHALL COME COMPLETE WITH AN ELECTRICAL PANEL FOR
PACKAGE ELECTRICAL LOADS.
13. THE PH OF THE MEDIUM IS LESS THAN 7 AND CONTAINING CO2. THE
FLUIDS ARE CRUDE OIL, WATER AND NATURAL GAS. THE MOLAR FRACTION
OF CO2 IS LESS THAN 0.18%.FLUIDS ARE CHLORIDE FREE.
14. THE DRAIN NOZZLE OF DRIP PAN SHALL BE 2”150 LB FLANGE CONNECTION.
15. THE Y-TYPE SHALL BE SUPPLIED WITH A DRAINAGE VALVE WITH NPT
THREADED CONNECTION AT THE BOTTOM.
16. ALL NITROGEN GAS DISTRIBUTION VALVES ARE SW X NPTF TYPE.