0% found this document useful (0 votes)
17 views

50 Kw On Grid System without net metering

The document presents a commercial proposal for a 50 KW On-Grid solar system, detailing the system's components, costs, and warranties. The total cost for the system is 3,730,000 RS, which includes various solar panels, inverters, and additional services. It also outlines terms and conditions, payment terms, and unique after-sales services offered by the company.

Uploaded by

Ali Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

50 Kw On Grid System without net metering

The document presents a commercial proposal for a 50 KW On-Grid solar system, detailing the system's components, costs, and warranties. The total cost for the system is 3,730,000 RS, which includes various solar panels, inverters, and additional services. It also outlines terms and conditions, payment terms, and unique after-sales services offered by the company.

Uploaded by

Ali Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Date: Nov, 21, 2024

SOLAR SYSTEM COMMERCIAL PROPOSAL

EPC (Engineering, Procurement and Construction) Commercial


Proposal
Average
SR System System Type PV Module Inverter Monthly System
Capacity Output Cost
(Generated
Units) (Without
Taxes)
1 50 KW 50 KW On-Grid 580W/585W 50 KW 6000 3,730,000 RS
System (QTY 86)
*For Elevated Structure (Pole/Girder/C Channels/Nut bolts) 600,000 RS will be extra.

Solar Panels: Mono PERC Half Cut/Bi-facial ( LONGI, APEX, ZPM, JINKO, JA,
CANADIAN )
Solar ON-Grid Inverters: HUAWEI, SOLIS, GROWATT, SOFAR, HOPE WIND, INVEREX
Solar OFF-Grid / IP 21/22 Hybrid Inverters: CROWN, OMEGA, TESLA, MAX POWER, SOLAR MAX.
Solar Hybrid IP 65 Inverters: CROWN, GROWATT, INVEREX NITROX, TESLA, MAX
POWER, SOLAR MAX
Pre-Fabricated Structure: L2/L3 14 Gauge Galvanized Frames are used.
Elevated Structure: (Pole/Girder/C channel/nut bolts) / (Pole/Pipe)

Note: Any Panels, ON-Grid, OFF-Grid IP (21-22), Hybrid IP 65, Pre-Fabricated and Elevated Structure will be
delivered depends upon availability and demand by the customer

ENERGY ESSENTIALS - Unique Services:

1. A team of professional Engineers would be dedicated to each project


2. 1 Year Free Service Warranty of Solar System for (Distribution Board, Breakers, Volt and
Amp meters,Cabling, Frames, SPDs and Voltage Protection Device).
3. On Site Solar Panels Washing Services @100 Rs Per Panel.
4. Dedicated Customer Service Help Line Facility (0329-7711110, 0329-8811110)

Warranty (Solar Panel/Inverter)


 5 Years Warranty of ON Grid Solar Systems Inverters IP65/IP66.
 30 Years Warranty for Solar Panel Performance as per data Sheet from Manufacturer.
 12 Years Warranty of Solar Panel Product as per data sheet from Manufacturer.

Multan office: Office # 154, A Block, Model Town, Multan


Bahawalpur Office :Second floor OPTP building near kebabish Continental restaurant Welcome Chowk , Bahawalpur,
UAN: 0329-7711110 Cell: 0329-8811110
Date: Nov, 21, 2024

SOLAR SYSTEMCOMMERCIAL PROPOSAL


Company/Customer

Name:

Attn:

ContactNo:

EPC (Engineering, Procurement and Construction) Commercial Proposal

Installed
Project Name with KW Unit Solar PV Inverter QTY Final System
Sr.No QTY SolarPanels Cost
Power
1 50 KW ON-Grid without EPC-Set 86 01 50 W 3,730,000
Net-Metering
2 PV Upgrade Pcs

3 Inverter Upgrade Pcs

4 Net Metering Job Not Included

5 Elevated Structure EPC-Set Not Included


Included
6 Civil Work Job
Included
7 Transportation Job
8 Batteries Pcs

9 Any other Item


10 Any other Item
Total Price 3,730,000

ENERGY ESSENTIALS - Unique After - Sales Services:

• 1 Year Free Parts Warranty of Solar System for. (Distribution Board, Breakers, Volt and
Amp meters,Cabling, Frames) Except Visit and Traveling Charges.
• Solar Panels Cleaning Service at 100 Rs Per Solar Panel at Site.
• Dedicated Customer Post Service Help Line Facility.

Multan office: Office # 154, A Block, Model Town, Multan


Bahawalpur Office :Second floor OPTP building near kebabish Continental restaurant Welcome Chowk , Bahawalpur,
UAN: 0329-7711110 Cell: 0329-8811110
TERMSAND CONDITIONS:

1. The Company is responsible to install all deliverables within time frame except exceptions occur beyond over
reach.
2. This quotation is valid for 3 days.
3. The quotation include Civil Work/Transportation Cost as well.
4. Prices are fixed.
5. The system would be install after the Net Metering process would be completed.
6. In case of Malfunction in Inverter or any Part of Solar System, it will be repaired/replaced under warranty from
concerned manufacturer.
7. For ON Grid System, Customer must have 3-Phase Meter Connection with Approved Sanction Load. If there
is load extension required, it will be Customer responsibility.
8. For ON Grid Net Metering System, Customer must have 3 Phase Cables at his Wapda Pole where existing
Meter is installed.
9. For ON Grid Net Metering System, 3 Phase Cable from AC DB to Wapda Meter will be Charged as per Actual.
If it is required.
10. Pre-Fabricated Roof Mounted frame Structure L2/L3 Prices are included only in Price, If Customer need
Customized Heighted, Elevated or Ground Mounted Structure then Structure cost will be Customer
Responsibility.
11. For ON Grid Net Metering System, If Building height is 15m then Lightening Arrestor Required, Lightening
Arrestor Earthing Price is not Included in proposal, it will be charge 35,000 extras if needed.
12. Load Balancing & internal wiring will be done by Customer’s Electrician.
13. Voltage stabilization of MEPCO Grid will be done by Customer (Customer himself coordinate with MEPCO to
fix the issue.
14. For ON-Grid Solar system output will be 70% of Solar Panels Installed Capacity during Peak Day time withFully
Shiny Day and also with clean Solar Panels.
15. Company is responsible to submit the File in WAPDA for net meting process only, Net Metering Process will
be start after approved sanction Load and completion of installation and its complete procedure time is up
to 15-20 Working Days until Green Meter Installation, Time may vary, depends on MEPCO.
16. If meter in Box up to 20 KW System, then Rs. 150,000 will be Charged in addition to net metering cost.
17. In case of Malfunction in Inverter or any Part of Solar System, it will be repaired/replaced under warranty from
manufacturer.
18. The Company would not be responsible for any damages occurred due to Grid failure or Natural Disaster.

Payment Terms:

1. For ON-Grid Solar Projects 80% Advance, 10% after Installation and 10% after green Meter Installations.

Multan office: Office # 154, A Block, Model Town, Multan


Bahawalpur Office :Second floor OPTP building near kebabish Continental restaurant Welcome Chowk , Bahawalpur,
UAN: 03 29-7711110 Cell: 03 29-8811110
On Grid Solar System 50 KW
SR# ITEMS Type Brand Unit QTY Price Total Pice

Solar Panels Mono /Poly PERC Tier 1 Jinko N Type /Canadian 580/585 W 86 18,720 1,609,920
1 Pcs
2 Solar Penels MC-4 Connectors IP 65 / Coper Salves Pair China Pcs 60.00 300 18,000
3 Solar Penels Nut Bolts 13 No Color ( Galvanized) China Pcs 688.00 100 68,800
4 Solar Pre Fabricated Frame Structure ( Rust Free) L2 -Frames - Galvanized China / Pakistan Pcs 86.00 4,000 344,000
5 Rawal Bolts Pipe 3 Sutar ( Good Qulality) China Job 680.00 100 68,000
6 Inverter 1 On Grid Inverter with Wifi Goodwe/Fox/Growatt 50 KW Inverter Pcs 1 710,000 710,000
7 Inverter 2 Pcs - - -
8 DC Cable RED - Copper 6 mm World Wide / Imported Yardz 448.00 300 134,400
9 DC Cable Black - Copper 6 mm World Wide / Imported Yardz 448.00 300 134,400
10 Grounding Cable for Panles and Inverter to Busbar 4 mm Yellow / Green Cable Yardz 448.00 180 80,640
11 Thimbels for Grounding Cable for Panles U Type 6 mm SV 55-5 China Job 86.00 50 4,300
12 Main - Distribution Box Box Pakistani Made Pcs 1.00 35,000 35,000
13 DC Breaker for Strings 1000V, 63 Amp Schneider Pcs 6.00 3,500 21,000
14 DC SPD AM 40K ANSU / Imported Pcs 6.00 5,000 30,000
15 AC Breaker 4 Pole As per Invrter out Put Current Schneider Pcs 1 35,000 35,000
16 AC SPD AM 100K ANSU / Imported Pcs 1.00 8,000 8,000
17 AC Cable 4 Core ( Inverter to AC DB) 07 / 64 mm Copper Meter - - -
18 Thimbels for Ac 3P Cables 16 mm China Pcs 6.00 50 300
19 AC Volt & Amp Meter for Load Pcs Realness Pcs 3.00 550 1,650
20 Tubeless(I LUG) for Breakers Blue 10 mm China Job 48.00 20 960
21 Tubeless(I LUG) for Breakers Blue 16 mm China Job 8.00 25 200
22 Flexible Pipe for Panels Cabeling ( 150 Feet) 1 Inch Dia GM Roll 1.00 3,000 3,000
23 PVC Pipe for Earthing Cables 1 Inch Dia GM Pcs 60.00 150 9,000
24 Ducts for DC Cables from Panles to DCDB 33 x 33 Dia GM Pcs 30.00 400 12,000
25 DUCT for Inverter Cabeling - Indoor 60x60 Dia GM Pcs 1.00 500 500
26 Screw for Ducts ( 1.5 Inch) 1.5 Inch Adamjee Box 1.00 900 900
27 Washals for Screw 1.5 Inch Adamjee Box 1.00 250 250
28 Rawal Plugs for Screw 1.5 Inch Adamjee Pcs 1.00 250 250
29 Insulation Material Red NETO Pcs 60.00 30 1,800
30 Insulation Material Black NETO Pcs 60.00 30 1,800
31 Insulation Material White NETO Pcs 60.00 30 1,800
32 Silicon Black COTRAN Pcs 1.00 350 350
33 Cable Ties White 12 Inch China Pcs 12.00 500 6,000
34 Cable Ties White 10 Inch China Pcs 12.00 500 6,000
35 Cable Ties White 8 Inch China Pcs 12.00 500 6,000
36 Cable Sleves Red 6 mm China Meter 1.00 100 100
37 Cable Sleves Black 6 mm China Meter 1.00 100 100
38 Cable Sleves Red 16 mm China Meter 1.00 100 100
40 Bidirectional Green Meter Per Watt Pcs - 55,000 -
41 Current Transformer (CT) Job - 50,000 -
42 Net Metering Wapda Fee Job - 1,000 -

-
43 Net Metering File Processing with Generation Licience Per Watt Job - 240,000
44 Installation, Testing, Comissioning Per Watt Per Watt 50,310 4 201,240
45 Earth Boaring for AC Earthing 5 Feet more Untill Water Level Local Job Job 1 8000 8,000
46 Earth Boaring for DC Earthing 5 Feet more Untill Water Level Local Job Job 1 8000 8,000
47 Copper Wire 16 MM For AC Earthing Pakistani Made Feet 50 300 15,000
48 Copper Wire 16 MM For DC Earthing Pakistani Made Feet 50 300 15,000
49 Copper Plate ( 1 feet x 1.5 Inch) Pakistani Made Feet 3 2,500 7,500
50 Chemical Bag Pakistani Made Bag 3 900 2,700
51 Copper Cable Thimble Pakistani Made Pcs 6 50 300
52 Nut Bolts for Thimbels Pakistani Made Pcs 6 150 900
53 Grounding Base Plate ( 1 x 1.5 Inch) Pakistani Made Pcs 1 1,650 1,650
54 Ancor Bolts for Grounding Base Plate Pakistani Made Pcs 2 100 200
55 Grounding Base Plate Holders Pakistani Made Pcs 2 150 300
56 Earth Boaring for Lighting Arrestor Earthing 5 Feet more Untill Water Level Local Job Job 1 12000 12,000
58 Lighting Arrestor Pakistani Made Pcs 1 14,000 14,000
59 Lighting Arrestor Base Pakistani Made Feet 1 2,500 2,500
60 Copper Plate ( 3 x 1.5 Inch) Pakistani Made Feet 1 1,650 1,650
Transportation Customer will direct as per actual Local Job Job 1 12,000 12,000
Civil Work Customer will direct as per actual Local Job Job 1 73,000 73,000
Total 3,730,460

Multan office: Office # 154, A Block, Model Town, Multan


Bahawalpur Office :Second floor OPTP building near kebabish Continental restaurant Welcome Chowk , Bahawalpur,
UAN: 03 29-7711110 Cell: 03 29-8811110

You might also like