main db
main db
cable +
16sq mm E.W
AUTO
CHANGEOVER 4c x 10sq mm
SWITCH cable +
16sq mm E.W
100KVA Generator
Schneider Shutdown
Contactor
Electric
R
100A Y 63A
SP
63A 63A
TP
50A
SP
63A
SP Schneider
10A
SP
63A
TP
10A
SP
TP SP Electric
B Schneider Schneider
Schneider Schneider Schneider
Schneider
Electric Schneider
Electric
Electric Electric Electric
Electric Electric
1 3 1 3 1 3
Daylight Switch
Overide switch
SURGE PROTECTORS
Photocell
in DB
Schneider
Schneider
E N Electric 2 4 2 4 2 4
Electric N
Con
Schneider
Electric
LEGEND
1. Installation to comply with Government of Zimbabwe Standard Electrical Specification (latest edition), SAZ & CAS wiring regulations.
2. All DBs are to be balanced over phases..
Single Pole MCB. SPD Surge Protection Device. 3. All incoming water and gas services shall each be separately bonded at the point of entry via 16 sqmm BCEW in conduit and connected to the earth bar in the associated distribution board.
4c x 25sq mm The electrical Subcontractor shall ascertain the exact locations from the main Contractor.
4. All cable trenches shall be 1000mm deep x 500mm wide. Cables shall be laid on 75mm sand and riddled earth carpet covered by 75mm sand blanket and 225mm x 150mm cable warning
Triple Pole MCB.
32mmsq cable + Copper tiles to BS 2484 or equivalant. The earth shall be reinstated in 100mm layers, hand ramming the first 2 layers.
5. A 150mm wide micron rot resistant polythene cable warning tape shall be installed at 500mm below ground level and above cables. Separate warning tapes shall be provided for each trench.
PVC/SWA 6. All contactor boards and double pole switches shall be installed by the electrical Subcontractor adjascent to the respective equipment. The electrical Subcontractor shall ascertain the exact
32sq mm E.W CABLE FROM SUPPLY Triple Pole Circuit Breaker. locations from the main Contractor.
AUTHORITY METER POINT 7. All trenching shall be done by the electrical Subcontractor. The afore-said carries the responsibility of providing PVC sleeves including the necessary draw wires.
10. Circuitry on lighting and power drawings shall take precedence over figures shown on distribution board schedules.
Allow local Earth 11. All distribution board spare ways shall be blanked off but labelled to indicate the respective ratings.
MAT to SUPPLY Contactor AC 3 Rated. 13. Unless indicated otherwise, all distribution boards shall be equiped with 5KA minimum breaking capacity MCBs.
LOCAL AUTHORITY 14. All electrical services drawings shall be read in conjunction with all other services drawings
REQUIREMENTS ELCB Earth Leakage Circuit Breaker.
RCD Residual Current Device.
VIVO
AMENDMENT Director Client Centre
Notes Description : Architect
VIVO ENERGY
Lttr date Init
Branch Head
MAIN DB
Designed Title
Scale
DISTRIBUTION BOARD SCHEMATIC
Drawn
Date
Description Distribution Board Schematic, Changeover Switch Schematic
Micro-film
Drwg No
ENERGY
ZIMBABWE
Checked
Telephone
Fax
File Ref Stock Drwg No
Shutdown Contactor, Pump Control System,
G.P. No Proj No