SAP SD-MM Integration - The Third-Party Process
SAP SD-MM Integration - The Third-Party Process
SAP SD-MM
INTEGRATION: THE
THIRD-PARTY PROCESS
Scenario 2: -
In some scenarios even though company manufacture the products and if stock is not
available or if there is some problem in manufacturing unit then they go for third party
process.
In this situation we ask vendor to send shipping notification to the company which consists
of material details and quantity details which vendor has delivered to customer. Then we
can do MIGO in SAP and based on MIGO quantity we raise invoice to customer.
Billing relevance “G‟ controls that in third party with shipping notification if MIGO is
not created then system will not allow to create invoice to customer.
If we want third party process with shipping notification then we maintain billing
quantity “E” which helps to copy the quantity from MIGO to invoice while creating
invoice to customer in third party process.
2nd Step
Assign purchase organization to company code: -
SPRO enterprises structure assignment MM assign purchase organization to
company code position ZPUR ZALK save it
Go to the T-code [FTXP] and maintain tax code FTXP IN S1 description (Input
tax PO) tax type [V] (input tax) enter input tax [10%] save it.
T-code To create PO [ME21N]
4th Step: - Go to vendor master [XK01] Create, [XK02] change scroll down and
automatic PO save it.
5th Step: -
Maintain material info record or purchasing info record. The T-code is [ME11] material
vendor purchase organisation ZMUM enter net price [5000] max quantity
[10000] enter save it.
6th Step: -
Maintain source list T-code [ME01] material plant validity period [ 25.01.2014]
[31.01.2014] TVENDER1 ZPUR save it.
➢ create order, after the 1st time configuration go to ME59N (one time only) execute
purchase group [ ] purchase organisation [ ] vendor plant execute.
➢ Go to VA02 document flow Check whether PO is generated or not?
In copy control, order to billing for item category TAS change the billing quantity “F” to “E”.
• Billing relevance “G” controls that, while creating sale order in third party process
system checks whether MIGO is created or not. If MIGO is created then system will
allow to create invoice to customer.
• Billing quantity “E” will help to copy the quantity from MIGO to customer invoice.
• When we do MIGO in third party process system will treat it as dummy MIGO and
stock will not be updated. The control is item category [5] in schedule line category.
Step4: -
IN copy control VTFA maintain item category [TASG] for RE – RE combination
Maintain copy requirement as [028] VBRK / VBRP = [002]
Billing quantity [F] Plus / Minus [+], Pricing type [D]