0% found this document useful (0 votes)
34 views6 pages

Ongrid 15 KW With 18kw PV Masjid

Uploaded by

Abdur Rehman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views6 pages

Ongrid 15 KW With 18kw PV Masjid

Uploaded by

Abdur Rehman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

V-Energy

Proposal of 15kw with 18kw PV On-Grid System

“Our central goal is to deliver dependable, protected and modest energy-saving


arrangements with a guarantee to serve them in the smallest degree times”

Head office:
Suite 606 AL-Samad Tower Main University Road
Gulshan Iqbal Block 13-C, Karachi, Pakistan
ASSALAM O ALAIKUM

Subject: Proposal of 15kw with 18kw PV On-grid system

Dear Committee Member,

We, V Energy, are satisfied to get the opportunity to advance our functioning as this Sunlight
based energy framework's proposition to give you greatest advantage and great profit from
speculation. In this proposition, we have furnished citation alongside agreements as well as
recompense examination and specialized particulars.

The proposed on-grid gadget is entirely reasonable in high billing hit regions, which has the fast
restitution, higher future, simple arrangement and solid plan. The significant advantage of the gadget
is that it keeps generating its energy age while the weather is cloudy.
Withstanding, on the off chance that the client wants reinforcement energy during the blackouts,
he/she wants to introduce reinforcement generator or Solar UPS. Thus, assuming that you're leaned
to introduce the Solar Net Metering as well for reinforcement energy then the equivalent might be
combined with this gadget and with the guide of utilizing similar sunlight powered chargers.
We are given to an uncommon set up and to ensuring your general objective accomplishment with
our items and administrations. We look forward to supporting you to get power independency,
introducing a decent reserve funds long into the future and supporting you to make a top notch
ecological effect.

We will circle back to you an opportunity in time to come to an ultimate choice in regards to the
proposition.

Regards,

V-Energy.

Head office:
Suite 606 AL-Samad Tower Main University Road
Gulshan Iqbal Block 13-C, Karachi, Pakistan
Quotation: 0010703-24 Date: 12-nov-2024

15kw with 18kw PV On-grid system

Sr. Components Qty. Make Price (Rs.)


No
Imported Items
Solar PV Modules: 585W Grade A, Tier 1,
1 26 Tier 1 (Grade A)
Mono-Perc (Jinko) 940,440
(Documented panels)
2 Inverter: Three Phase On-Grid Inverter 15kw Growatt

Local Items

3 Structure Type/ Elevated Structure with 1 job 14 guage poles with


customized Civil Pads double garder of 12
guage
4 DC Cables: 1 Core, 4mm2/6mm2, Cu/PVC 1 job Pakistan Cables/LS Cables

5 AC Power Cables: 4 Core, 10mm2, Standard, 1 job Pakistan Cables


698,650
Cu/PVC
6 Earthing Cables: 1 Core, 4mm2, Cu/PVC 1 job Pakistan Cables/LS Cables

7 DC Breaker Box: DB Local, DC Breakers 16A 2P 1 job Schneider

8 AC Combiner: DB Local, SPD 1 job Schneider

9 PVC and channel duct Pipes with complete set 1 job

Services

10 Installation and Commissioning 1 job

11 Transportation 1 job
187,993
12 DC Earthing and Lightning Arrestor 1 job Ac and Dc earthing

13 Net Metering Service Charges 1 job All the KESC matters

Total Amount (PKR) of 15kw 1,831,084

Total Amount with special discount for Masjid 1,700,000

Head office:
Suite 606 AL-Samad Tower Main University Road
Gulshan Iqbal Block 13-C, Karachi, Pakistan
TERMS & CONDITIONS
Price Validity Prices quoted are valid for 3 days from the date of quotation. Prices may vary
based on any depreciation in PKR parity rate with USD.

80% Advance
Payment Terms: 20% After Delivery
No work will be started at the site until the receipt of complete 100% payment

Delivery and Within 7-14 days from date of confirmation of order. Order will be deemed
Installation confirmed after receipt of 80% advance payment.

Payment Mode Cross cheque in favor of V-Energy

Price does not include:


 Out of City system delivery to site
 Net-Metering Charges which will be charged by K-Electric and NEPRA
(i.e. approx.Rs.100,000) will be charged by KE for the change of meter
Scope of Work and approx. Rs.1,000 per kW will be charged by NEPRA as an
application processing fee for the system greater than 25kw
(Not Included)
 Any other points which are not mentioned in the offer
 Booking Reversal Within 3 days: 5% of Advance received will be
deducted.
 After 3 days: 10% of the amount will be deducted from Advance. The
ownership of the System will be considered transferred to the
Customer upon delivery of the System at Customer's site. The sale is
final. V-Energy will not be liable to buy back the System under any
Circumstances.
 The customer shall provide un-interrupted internet access for the solar
system to function. If due to non-connectivity of internet, access to
company’s after sales services results in damage to the solar system,
then such damage shall not be covered under Product Warranty.
 Any electric or civil work including concealing of wires or pipes,
additional breakers or changeovers, etc. will be client’s responsibilities

Force Majeure The universally accepted force majeure clause applies to our proposal

If the building height exceeds 40ft, Rs.35000/= will be charged extra for the
Lightning Arrestor
lightning arrestor as per the KE regulations. (If not added in the quotation)

Head office:
Suite 606 AL-Samad Tower Main University Road
Gulshan Iqbal Block 13-C, Karachi, Pakistan
Customer acknowledges that getting the required clearance of Licenses from
NEPRA & Distribution Company are customer’s own responsibility. V-ENERGY will
only assist the customer in preparing the required documentation for Net-
Metering with the NEPRA or Distribution Company and V-Energy also charges the
customer separately for these assistance services.
Net-Metering
Other Customer responsibilities for Net Metering include:
 Meter name change (if required)
 Sanction Load Change (if required)
 Any other documents required by KE or NEPRA for the processing of Net
Metering file
 All payments for Bi-Directional Meter, Demand Note Charges to
Distribution Company or NEPRA
Timeline for Net-metering depends on NEPRA’s & Distribution Company’s
approval. V-ENERGY can never be held liable, for any delay or decline of
approvals either from NEPRA or Distribution Company

V-Energy is committed to provide one window solution to its customers. In order


Outsourcing and to do so any contracts or agreements the company makes with other third party
Third Party vendors is company’s internal business and V-Energy can never be questioned by
Contracts any client for any such contracts.

Material Unit Quantity


Scope Of Work Ducting Meters 45
(Material for I&C Material Set 1
Standard 10kw Wiring AC 10mm² Meters 10
System) Wiring DC 6mm²/4mm² Meters 180
Earth wire Y/G 4mm² Meters 90

Hybrid System:
One month complimentary O&M Services, after one month a separate contract
will be signed for the continuation of the O&M services
O&M Services Residential Grid Tied System Up to 50kw:
Three months complimentary O&M Services, after one year a separate contract
will be signed for the continuation of the O&M services
Commercial Grid Tied System:
One month complimentary O&M Services, after one month a separate contract
will be signed for the continuation of the O&M services

Note: O&M services do not include cleaning of solar panels

Solar Panels: 25 years performance and 12 years workmanship warranty


System Warranties Inverter: 5 Years Product Warranty

Head office:
Suite 606 AL-Samad Tower Main University Road
Gulshan Iqbal Block 13-C, Karachi, Pakistan
ACKNOWLEDGMENT

It is to acknowledge that I have perused the agreements completely of this proposition and
totally comprehend what is referenced in it. I totally consent to every one of the agreements
set out thus and stick to every one of the installments standards and other extra
commitments. In marking this proposition, I am not depending on some other portrayal made
by the organization time.

Customer Signature Sales Manager Signature

Name:

Date:

CNIC No.