0% found this document useful (0 votes)
26 views

MOC List

Uploaded by

ganesh kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

MOC List

Uploaded by

ganesh kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

ADNOC Classification: Public # _ x0 0 0 D _

Status
Site Visit Number of
Due Date for MOC Instrument Scope Instrument Scope Completed/Under Based on discussion with ADNOC
No. Contractor MOC# MOC Description S.O No. Area Required Drawings for Remark Based on discussion with ADNOC (13/06/2024) Status as on 21/06/2024 Status as on 24/06/2024 Status as on 02/07/2024
closure Yes/No Details progress/Waiting for (12/06/2024)
Yes/No action
details/ No action

1 DES 612 Shrinkage Tester unreadable 4200460624 ASAB No N/A No N/A No Action Scope not related to Instrumentation Reviewed as part of Task order Action list review
MOC scope related to electrical. No scope for instrumentation
2 DES 5173 Digitalization of CP & CIP for Wells 4200460624 BAB- GAS No N/A No N/A No Action Reviewed as part of Task order Action list review
documents/drawings.
MOC scope related to Piping. No scope for instrumentation
3 DES 10858 Installation of closed sampling systems 4200460624 BAB- GAS No N/A No N/A No Action Reviewed as part of Task order Action list review
documents/drawings.
ADNOC has shared the details of the Typical loops to be
Site visit will be planned. For SPI drawings, DES will For SPI drawings, DES will share the typical ILD and ICD Typicals under preparation in SPI and will be shared to
followed for the tags of Bb-485 connected to the
share the typical ILD and ICD for review before for review before proceeding. Prepared Typicals will ADNOC for review. Once the typicals are approved, SPI
C&E & IO list markup received as MOC inputs. However upon reviewing DES to verify the nest loading with the loops (for Yokogawa PLC (10 loop typicals, 175 signals excluding
2D layouts, ILD, ICD, Vendor proceeding. Prepared Typicals will have the changes have the changes done as per the excel file shared by ILD & ICD can be issued for the tag list received from
4 DES 12255 DIGITALIZATION OF GAS BAB WELL BB485 4200460624 BAB- GAS Yes Yes Refer Remarks Waiting for details the scope, there may be approx. changes to be made in 500 field inst) for ILD and ICD. For 2D & vendor spares).DES will study and prepare the typical loop
drawings, C&E, Schedules. done as per the excel file shared by ADNOC and other ADNOC and other details (Instrument to JB) will be ADNOC. For 2D layouts, C&E and layouts are under
documents/drawings. Inputs are awaited from ADNOC. drawing, DES to check for site visit and revert drawings in SPI and share for ADNOC review. Once the
details (Instrument to JB) will be retained as per the retained as per the connection in SPI. review for updation.
same is finalised, DES will submit the ILD and ICD
connection in SPI. Site visit is requirement is also intiated from DES end. Site visit is requirement is also intiated from DES end.
affected based on this MOC in approx. 10 working days.
ILD & ICD drawing kept on HOLD due to BAB OIL
database generation and setup Audit. C&E drawing will
PID updation to be done for the Flare PIDs
be reviewed by DES and discussed with ADNOC before
Interconnection drawing markups are awaited. System logic drawing including the flare ignition panel PIDs - ignition
To revoke the Total plant Shutdown on HP & Spare /LP Flame Master native files for the 2D layout will be requested Master native file request sent to ADNOC.ILD & ICD proceeding.
5 DES 4366 4200460951 BAB-OIL 6/28/2024 Yes C&E, Logic drawing, ILD, ICD No 2/19/1900 Under progress changes shall be taken care by ADNOC as per the modifications system). Flare ignition vendor wiring drawing to
detection Failure seperately drawing generation under progress. For ILD & ICD, SPI drawings are reviewed and ready for
proposed in MOC. be shared. Interconnection drawing inputs not
generation. However meeting will be scheduled with
required.
ADNOC inst FP & IES team SPI FP to discuss on the
updation before proceeding.
Scope related to additional Piping connection based on the MOC
6 DES 10233 Bb-805 & Bb-117 to cls-6 4"water injection flowline 4200460951 BAB-OIL 6/28/2024 No N/A No N/A No Action Noted
requirement.
Process PIDs. Alarm & trip set point list to be updated as per the inputs Alarm & trip schedule to be updated & revised as Document ready. Awaiting Master serial number from Document ready. Awaiting Master serial number from
7 DES 10465 Booster pumps discharge trip value change 4200460951 BAB-OIL 6/28/2024 Yes Alarm & trip schedule No 367 (ROWS) Under progress Noted Document submitted for ADNOC review
and MOC scope requirement. per MOC requirements. Process PID to be updated. ADNOC. ADNOC.

INTERCONNECTION BETWEEN WATER INJECTION CLUSTERS Scope related to additional Piping connection based on the MOC
8 DES 12502 4200460951 BAB-OIL 6/28/2024 No N/A No N/A No Action Noted
CL#43 - CL#1&2 AT BAB requirement.

BCDS Garo VRC bearing temp Set Pt Change VRC(11-01-K- Process PIDs. Alarm & trip set point list to be updated as per the inputs Alarm & trip schedule to be updated & revised as Document ready. Awaiting Master serial number from Document ready. Awaiting Master serial number from
9 DES 12537 4200460951 BAB-OIL 6/28/2024 Yes Alarm & trip schedule No 77 (ROWS) Under progress Noted Document submitted for ADNOC review
3810) and MOC scope requirement. per MOC requirements. Process PID to be updated. ADNOC. ADNOC.

iNTERCONNECTION BETWEEN WATER INJECTION CLUSTERS Scope related to additional Piping connection based on the MOC
10 DES 12673 4200460951 BAB-OIL 6/28/2024 No N/A No N/A No Action Noted
CL#42 & CLS#24 AT BAB requirement.

11 DES 0638 Change In Material Of Construction Of HE 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action No scope for instrumentation as the MOC is related to Mechanical/static Reviewed as part of Task order Action list review
MOC scope is related to electrical. No scope envisaged for
12 DES 0771 Upgradation of SHAH SCMS system 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action Reviewed as part of Task order Action list review
Instrumentation.
PID update for the Low pressure set point. No scope for
13 DES 3911 To reduce the Low Pressure set point 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action Reviewed as part of Task order Action list review
instrumentation.
PID received & reviewed. However no scope envisaged for
14 DES 3924 Utilization of WAG portable biocide chem 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action Reviewed as part of Task order Action list review
instrumentation.
15 DES 3935 Replace PC Gateways with PLC-based solution 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action No scope for instrumentation as the MOC is related to electrical Reviewed as part of Task order Action list review

16 DES 3940 Upgrade the Capacity of SA old MOL Pumps 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action As per scope of MOC, no scope for inst documents Reviewed as part of Task order Action list review
PID received & reviewed. However no scope envisaged for
17 DES 3951 Utilization of unused methanol injection 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action Reviewed as part of Task order Action list review
instrumentation.
Proposal sketch reviewed. Detailed PIDs and other instrumentation
18 DES 4094 MSAS- VR Sensors Installation in GL Well 4200467907 SAHIL 6/28/2024 No N/A No N/A No Action documents not received. However as per MOC, no action for Reviewed as part of Task order Action list review
instrumentation,
PID updation is envisaged. No updation for instrumentation
19 DES 6339 Gas lift line PSLL set valve in WH 4200467907 SAHIL No N/A No N/A No Action Reviewed as part of Task order Action list review
documents/drawings
Set point update. No scope for any instrumentation document/drawing
20 DES 5201 PH-3 disposal pump high pressure trip set point 4200471290 RUMAITHA 6/28/2024 No N/A No N/A No Action Reviewed as part of Task order Action list review
update
Set point update. No scope for any instrumentation document/drawing
21 DES 5447 CO2 wells- injection choke D/S pressure 4200471290 RUMAITHA 6/28/2024 No N/A No N/A No Action Reviewed as part of Task order Action list review
update
Set point update. No scope for any instrumentation document/drawing
22 DES 6237 Gas injection choke upstream pressure 4200471290 AL DABBIYA 6/28/2024 No N/A No N/A No Action Reviewed as part of Task order Action list review
update
MOC scope related to electrical. No scope related to
23 DES 6322 LINK OHL4 & OHL2 AS MUTUAL BACKUP SOURCE 4200320149 SHAH 6/28/2024 No N/A No N/A No Action
Instrumentation.
24 DES 6539 ASAB CDS FST-803 CP System Repairs 4200320149 ASAB 6/28/2024 No N/A No N/A No Action No scope for instrumentation as per MOC requirements.
ILD drawings are already prepared and approved through teams
discussion with ADNOC FP on March 19th 2024. However DES is
Project booking approval recd on 12th June 2024.
Remotely Switching the Lighting System from Control Room in MENDER/SHAH/ awaiting for the confirmation on the Project booking for the invoice Master drawings approved. QC submission done and Master drawings approved. QC submission done and
25 DES 864 4200320149 6/28/2024 Yes ILD No 9 Closed ILDs sent on 12th June 2024 and transmittal
Mender, Qushawira & Shah regions for security purposes QUSHAWIRA claim. These documents have already been submitted through e- approval received. approval received.
shared for reference via mail on 12th June 2024.
transmittal on 10th June'2024. Mail has been intiated by DES to ADNOC
TO FP and
As per MOC FPheld
discussion on 10th
with June 2024.
ADNOC FP on February 29, 2024, there is
26 DES 4523 Qw CDS Instrument Air compressor Logic change 4200320149 QUSAHWIRA 6/19/2024 No Logic changes No N/A No Action no drawing updaes only Logic changes needs to be done on the Reviewed as part of Task order Action list review
software as per the MOC.
DES Process to check and discuss with ADNOC process List of Mender ESP wells to be finalised between DES
MOC is related to all Mender ESP oil producer wells HPU solenoid field List of Mender ESP wells to be finalised between DES Reply awaited from ADNOC process FP on the list of
Details to be collected from site team. Site visit to FP on the list of Mender ESP oil producer well with PID process and ADNOC process FP. Further to the same,
27 DES 5282 To remove HPU solenoid additional field reset 4200320149 MENDER 6/19/2024 Yes ILD, ICD, C&E No Refer Remarks Waiting for details reset. Awaiting for inputs from Site team regarding the wells which are process and ADNOC process FP. Reply awaited from Mender ESP wells to further check on the affected C&E
be checked. markups. Accordingly the information can be checked C&E can be checked for those wells if the MOC details
affected. DES has sent mail for the same to ADNOC on 8th June 2024. ADNOC process team to proceed further. drawings for the particular wells.
in relevant C&E, ILDs etc. to be updated.
MOC is related to the hookup modification of the pressure transmitter
at choke downstream to measure the C-C annulus pressure. As per the
28 DES 5284 MN wells c-c annulus pressure monitoring 4200320149 QUSAHWIRA 6/19/2024 No N/A No N/A No Action Noted
technical report it is clear there is no new transmitter is added and
existing Pressure transmitter hookup is modified.
As per discussion held with ADNOC FP on February 29, 2024, there is
ASAB, Qushawira & Mender Shutdown Valves Reset philosophy MENDER/ASAB/
29 DES 5280 4200320149 6/19/2024 No Logic changes No N/A No Action no drawing updaes only Logic changes needs to be done on the Reviewed as part of Task order Action list review
changes. QUSHAWIRA
software as per the MOC.
As per discussion held with ADNOC FP on February 29, 2024, there is
30 DES 5281 Qw CDS GDU Logic change 4200320149 QUSAHWIRA 6/19/2024 No Logic changes No N/A No Action no drawing updaes only Logic changes needs to be done on the Reviewed as part of Task order Action list review
software as per the MOC.
As per discussion held with ADNOC FP on February 29, 2024, there is
31 DES 5283 To segregate GIC HH Pressure trip set point 4200320149 QUSAHWIRA 6/19/2024 No N/A No N/A No Action no drawing updaes only Logic changes needs to be done on the Reviewed as part of Task order Action list review
software as per the MOC.

For 2D drawings, Project native files shall be converted For 2D drawings, Area and plant area code have been
F&G detector layout, C&E,Cable As per the inputs received F&G cause & effect, cable routing layout, to master as existing master drawings are not reviewed with piping and confirmed. After piping plot
F&G Tags to be Updated for the devices coming under Ejector Master native files for the 2D layout will be requested
32 DES 5251 4200314459 BAB-GAS Yes routing layout,logic changes, ILD, No 24 Under progress F&G detector location layout, ILD, ICD has to be revised. Accordingly Noted available. Masdter serial number request raised to plan and GA drawing approval, F&G detector layout and
Skid seperately
ICD count has been mentioned for the number of drawings. ADNOC and details are awaited. cable routing to be prepared.
For ILD & ICD,SPI drawing generation under progress.

33 DES 6457 Adapter change Xmass configuration 4200467907 ASAB No N/A No N/A No Action No scope for instrumentation as per MOC requirements. Noted
Mail has been intiated by DES to MOC FP and Task
Details on the instrumentation documnts and drawings Mail has been intiated by DES to MOC FP and Task
As per scope, we understand new WSW Bb-1733 to tie-in with WIC-18 Site visit will be planned. No instrumentation order FP requesting for the inputs for the subject MOC
2D layouts, ILD, ICD, Vendor which are affected based on this MOC is not available order FP requesting for the inputs for the subject MOC
34 DES 636 Cl#18 New WSW flow line installation 4200320149 BAB 6/28/2024 Yes Yes Refer Remarks Waiting for details cluster. Affected drawings of WSW well Bb-1733 and WIC-18 cluster to - documents/drawings markups have been provided as on 24th June 2024 & reminder for the same sent on
drawings, C&E, Schedules. to check and verify. Same will be informed to ADNOC on 24th June 2024. Site visit requirement shall be
be shared for review to identify the number of affected drawings. part of MOC inputs. 2nd July 2024. Site visit requirement shall be checked
MOC FP & TO FP via DES projects team. checked and decided based on reply from ADNOC.
and decided based on reply from ADNOC.
MOC received on 28th June 2024 from ADNOC to DES.
35 DES 1549 utilisation of S.I tank as Biocide skid 4200467907 ASAB No N/A No N/A No Action Upon review the scope is related to the piping drawings
& PID updation. No instrumentation scope is envisaged

MOC received on 2nd July 2024 from ADNOC to DES.


36 DES 3912 2nd Biocide Injection storage tank in RDS-6 4200467907 ASAB No N/A No N/A No Action Upon review the scope is related to the piping drawings
& PID updation. No instrumentation scope is envisaged

MOC received on 2nd July 2024 from ADNOC to DES.


37 DES 8326 Introduce a break flange on SB-12 FL 4200467907 ASAB No N/A No N/A No Action Upon review the scope is related to the piping drawings
& PID updation. No instrumentation scope is envisaged
MOC received on 2nd July 2024 from ADNOC to DES.
Upon review the scope is related the change in type of
38 DES 11894 Replacement of Desalter level LTs 4200467907 ASAB No N/A No N/A No Action Level transmitter i.e replacement of Capacitance LTs
with GWR LT . No scope for insttrumentation
document/drawings envisaged

39 DES 924 Qw RDS Closed drawin pump S/U logic change 4200467907 Qusahwira Yes Logic changes, C&E No 1 Under progress

Logic changes, C&E, ILD,ICD, CBD,


40 DES 1489 Qw-32 natural flow oil producers to ESP conversion 4200467907 Qusahwira Yes Yes TBD Waiting for details
cable routing etc.

41 DES 11484 Qw GS1 (RDS) wells ESD trip logic change 4200467907 Qusahwira Yes Logic changes, C&E No 1 Under progress

42 DES 11485 Qw-GS2 24" Transfer line PSDL reduction 4200467907 Qusahwira Yes Logic changes, C&E No 5 Under progress

43 DES 14943 Fuel gas to N2 conversion for blanketing 4200467907 Qusahwira Yes Logic changes, C&E No 2 Under progress

44 DES 14953 Reduction of GICs Contactor Pressure for Startup 4200467907 Qusahwira No - No N/A No Action

45 DES 15012 Qw CDS Disposal pumps logic changes 4200467907 Qusahwira No - No N/A No Action
ADNOC Classification: Public # _ x0 0 0 D _

46 DES 807 Converting Sa-131 in ESP well 4200467907 Sahil No - No TBD Waiting for details

47 DES 3932 Level piping instrumentation - Train-2 4200467907 Sahil No - No N/A No Action

48 DES 3933 Replace LCP of Fire & diesel driven Fire pump motor 4200467907 Sahil No - No N/A No Action

49 DES 3937 Upgrade chiller PLC to redundant configuration 4200467907 Sahil No Logic changes, Vendor drawings No 25 Waiting for details

50 DES 3947 Power requirement at SAHIL CICPA compound 4200467907 Sahil No - No NA No action

51 DES 5458 Delay timer for Disposal water pumps 4200467907 Sahil Yes Logic changes No NA No action

Configuration of alarm
52 DES 8567 MOC 761 Alarm management at SAHIL 4200467907 Sahil Yes management through software No NA No action
modifications

53 DES 8981 Sa-23 ESP well annulus bleed off lne in 4200467907 Sahil No - No NA No action

54 DES 14647 SAHIL HIQUAD PLC Modernisation project for Gas compressors 4200467907 Sahil Yes Logic changes, Vendor drawings No 40 Under progress

System architecture, Control room


55 DES 15002 Remote operations of Sahil from Asab 4200467907 Sahil Yes No TBD Waiting for details
layout
ADNOC Classification: Public # _ x0 0 0 D _

Status as on 18/07/2024

Typicals under preparation in SPI and will be shared to


ADNOC for review. Once the typicals are approved, SPI
ILD & ICD can be issued for the tag list received from
ADNOC. For 2D layouts, C&E and layouts are under
review for updation.
Site visit is requirement is also intiated from DES end.
ILD & ICD drawing kept on HOLD due to BAB OIL
database generation and setup Audit. C&E drawing will
be reviewed by DES and discussed with ADNOC before
proceeding.
For ILD & ICD, SPI drawings are reviewed and ready for
generation. However meeting will be scheduled with
ADNOC inst FP & IES team SPI FP to discuss on the
updation before proceeding.

Document submitted for ADNOC review

Document submitted for ADNOC review

Reply awaited from ADNOC process FP on the list of


Mender ESP wells to further check on the affected C&E
drawings for the particular wells.

For 2D drawings, Area and plant area code have been


reviewed with piping and confirmed. After piping plot
plan and GA drawing approval, F&G detector layout and
cable routing to be prepared.

Mail has been intiated by DES to MOC FP and Task


order FP requesting for the inputs for the subject MOC
on 24th June 2024 & reminder for the same sent on
2nd July 2024. Site visit requirement shall be checked
and decided based on reply from ADNOC.

As per the MOC received on 11th July 2024, C&E


drawings updation is required. Logic changes to be
taken care at site by operation team. Process to update
the PID. Native MASTER file fo C&E needed to update
theper
As changes.
the MOC received on 11th July 2024, revised PID
for Qw-32 required to indicate the new instruments and
logic changes which are needed for the ESP well. There
is no clarity on the scope of this MOC as per inputs
received and also need to know if ADNOC has
proceeded for the permanent modification of
converting to ESP well. If so, all the site modification
RLM will be needed to revise and submit the relevant
ILD, ICD, C&E, CBD, cable routing etc if new
instruments are added for the remote monitoring of
wellhead.
As per the MOC received on 11th July 2024, C&E
drawings updation is required. Logic changes to be
taken care at site by operation team. Process to update
the PID. Native MASTER file of C&E needed to update
the changes.

As per the MOC received on 11th July 2024, C&E


drawings updation is required. Logic changes to be
taken care at site by operation team. Process to update
the PID. Native MASTER file of C&E needed to update
the changes.

As per the MOC received on 11th July 2024, C&E


drawings updation is required. Logic changes to be
taken care at site by operation team. Process to update
the PID. Native MASTER file of C&E needed to update
the changes.

As per the MOC received on 11th July 2024,it is


understood from the Technical assessment that the
setpoint is not required to be changed and no action for
this MOC.

As per the MOC received on 11th July 2024,it is


understood from the Technical assessment that the
changes are with the logic portion for the soft tags
only. Same to be taken care by site operation team.
ADNOC Classification: Public # _ x0 0 0 D _

As per the MOC received on 11th July 2024,it is


understood from the HAZOP report that the conversion
of Sa-131 to ESP oil producer well is proceeded as a
pilot project. However it is not clear whether the site
team have implemented these changes and no site
markups on the Instrumentation documents have been
received. Scope clarity is missing.

As per the MOC received on 11th July 2024,it is


understood from the MOC is related to Level piping
material change. No scope for instrumentation.

As per the MOC received on 11th July 2024,it is


understood from the MOC that it is related to the Fire
water pump LCP location. No scope for instrumentation.

As per the MOC received on 11th July 2024,it is


understood from the MOC that it is related to the
modification of the non-redundant ABB PLC to
redundant configuration (hardware changes and soft
logic changes). Logic changes to be carried by site
operation team. For the hardware changes made,
ADNOC to share the site markup to prepare the master
drawings for the Panel layout and wiring drawings.
Panel layout markup is received, however wiring
drawings are yet to be received.

As per the MOC received on 11th July 2024,it is


understood from the MOC is related to the power
cabling for OHL for SAHIL CICPA compound and Civil
scope related to the civil construction. No scope for
instrumentation.

As per the MOC received on 11th July 2024,it is


understood from the MOC is related to adding delay
timer of 20 sec for the disposal water pumps which
should be taken care in the logics by site operation
team. Process PID to be updated.
No scope for instrumentation documents and drawings
as no site markup is received.

As per the MOC received on 11th July 2024,it is


understood from the MOC is related to alarm
management at SAHIL which needs to be performed by
site oepration team as per the ADNOC standards. No
scope of modification required for instrumentation
documents/drawings.

As per the MOC received on 11th July 2024,it is


understood from the MOC is related to monitoring the
integrity of Annlus bleed line. No scope for
instrumentation documents & drawings.

As per the MOC received on 11th July 2024,it is


understood from the MOC is related to the replacement
of HIMA PLC HI-QUAD to HI-QUAD-X system with
redundant CPU and communication module. Software
logic changes to be taken care by site operation team.
Panel layout and wiring drawings to be updated as per
the inputs received

As per the MOC received on 11th July 2024,it is


understood from the MOC is related to provide
additional consoles in ASAB control room and to
develop the graphics and logics in ASAB to perform
remote operations at SAHIL area from ASAB. Control
room layout of ASAB and SAHIL CCR, System
architecture drawings are required from ADNOC to
implement the changes.
MOC ELECTRICAL INSTRUMENTATION PROCESS PIPING
MOC # AREA
DESCRIPTION STATUS REMARKS STATUS REMARKS AFFECTED DRAWINGS REMARKS
As per the MOC SOW, Oil Producer SA-131 was converted to an ESP well, but none of the
electrical or other discipline drawings have been received, except for the P&ID. As per the MOC received on 11th July 2024, C&E drawings updation is Since Sa-131 well is converted to ESP (Artificial lift well) Plot,
Converting Sa-131 in ESP Therefore, the relevant electrical as-built mark-up drawings need to be collected from required. Logic changes to be taken care at site by operation team. Piping GA and piping layouts need to be prepared. But, the
807 Sahil Waiting for Inputs Waiting for details MASTER-16-71-08-0213-1
well the MOC focal point. We are currently awaiting the completion of other discipline studies. Process to update the PID. Native MASTER file fo C&E needed to said documents are not available with the received MOC
Once these are completed, we will need to send a mail to the company to address any update the changes. documents.
missing inputs.
required to indicate the new instruments and logic changes which are
needed for the ESP well. There is no clarity on the scope of this MOC
Qw RDS Closed drawin as per inputs received and also need to know if ADNOC has proceeded
924 Qusahwira Under progress P14364-58-11-08-1610-1 No Scope
pump S/U logic change for the permanent modification of converting to ESP well. If so, all the
site modification RLM will be needed to revise and submit the relevant
ILD, ICD, C&E, CBD, cable routing etc if new instruments are added for

As per the MOC SOW, the QW-32 modification was done in the ESP artificial lift well.
However, the current master status of QW-32 still reflects it as an oil producer well in the
As per the MOC received on 11th July 2024, C&E drawings updation is
drawings. Therefore, the conversion of QW-32 from an oil producer to an ESP artificial lift
Qw-32 natural flow oil required. Logic changes to be taken care at site by operation team.
1489 Qusahwira Waiting for Inputs well must first be documented in the master project engineering drawings. Only after Waiting for details QW-32 PID P14395-58-71-08-1686 No Scope
producers to ESP conversion Process to update the PID. Native MASTER file of C&E needed to
this update can the MOC proceed. We are currently awaiting the completion of other
update the changes.
discipline studies. Once these are completed, we will need to send a mail to the
company to address any missing information and discuss the way forward.
As per the MOC received on 11th July 2024, C&E drawings updation is
Level piping instrumentation required. Logic changes to be taken care at site by operation team.
3932 Sahil No Action MASTER-16-01-08-1121-1 No Scope
- Train-2 Process to update the PID. Native MASTER file of C&E needed to
update the changes.
As per the MOC SOW, the fire pump panel and diesel-driven pump panel were replaced
due to obsolete spare parts. However, none of the electrical or other discipline drawings As per the MOC received on 11th July 2024, C&E drawings updation is
Replace LCP of Fire & diesel have been received, except for a few vendor drawings. Therefore, the relevant electrical required. Logic changes to be taken care at site by operation team.
3933 Sahil Waiting for Inputs No Action NO SCOPE No Scope
driven Fire pump motor as-built mark-up drawings need to be collected from the MOC focal point. We are Process to update the PID. Native MASTER file of C&E needed to
currently awaiting the completion of other discipline studies. Once these are completed, update the changes.
we will need to send a mail to the company to address any missing inputs.

As per the MOC received on 11th July 2024,it is understood from the
Upgrade chiller PLC to
3937 Sahil Waiting for details Technical assessment that the setpoint is not required to be changed NO SCOPE No Scope
redundant configuration
and no action for this MOC.
As per the MOC received on 11th July 2024,it is understood from the
Power requirement at SAHIL There is an electrical scope. Existing master drawings need to be collected from the
3947 Sahil Under Study No action Technical assessment that the changes are with the logic portion for NO SCOPE No Scope
CICPA compound company. After a detailed study, the number of action drawings will be estimated.
the soft tags only. Same to be taken care by site operation team.
As per the MOC received on 11th July 2024,it is understood from the
HAZOP report that the conversion of Sa-131 to ESP oil producer well is
Delay timer for Disposal proceeded as a pilot project. However it is not clear whether the site
5458 Sahil No action MASTER-1601-08-0251-1 No Scope
water pumps team have implemented these changes and no site markups on the
Instrumentation documents have been received. Scope clarity is
missing.
As per the MOC received on 11th July 2024,it is understood from the
MOC 761 Alarm
8657 Sahil No action MOC is related to Level piping material change. No scope for NO SCOPE No Scope
management at SAHIL
instrumentation.
As per the MOC received on 11th July 2024,it is understood from the
Sa-23 ESP well annulus
8981 Sahil No action MOC that it is related to the Fire water pump LCP location. No scope NO SCOPE No Scope
bleed off lne in
for instrumentation.
MOC that it is related to the modification of the non-redundant ABB
PLC to redundant configuration (hardware changes and soft logic
Qw GS1 (RDS) wells ESD trip changes). Logic changes to be carried by site operation team. For the
11484 Qusahwira Under progress NO SCOPE No Scope
logic change hardware changes made, ADNOC to share the site markup to prepare
the master drawings for the Panel layout and wiring drawings. Panel
layout
As per markup
the MOCisreceived
received,onhowever
11th Julywiring drawings
2024,it are yetfrom
is understood to bethe
Qw-GS2 24" Transfer line MOC is related to the power cabling for OHL for SAHIL CICPA
11485 Qusahwira Under progress P14395-58-12-08-1621-1 & P14395-58-12-08-162 No Scope
PSDL reduction compound and Civil scope related to the civil construction. No scope
As per the MOC received on 11th July 2024,it is understood from the
for instrumentation.
MOC is related to adding delay timer of 20 sec for the disposal water
SAHIL HIQUAD PLC
pumps which should be taken care in the logics by site operation
14647 Sahil Modernisation project for Under progress NO SCOPE No Scope
team. Process PID to be updated.
Gas compressors
No scope for instrumentation documents and drawings as no site
As per the MOC received on 11th July 2024,it is understood from the
markup is received.
MOC is related to alarm management at SAHIL which needs to be
Fuel gas to N2 conversion
14943 Qusahwira Under progress performed by site oepration team as per the ADNOC standards. No MASTER-58-01-08-0134-2 & MASTER-58-01-08-01 No Scope
for blanketing
scope of modification required for instrumentation
As per the MOC received on 11th July 2024,it is understood from the
documents/drawings.
Reduction of GICs Contactor
14953 Qusahwira No Action MOC is related to monitoring the integrity of Annlus bleed line. No NO SCOPE No Scope
Pressure for Startup As per for
theinstrumentation
MOC received on 11th July 2024,it is understood from the
scope documents & drawings.
MOC is related to the replacement of HIMA PLC HI-QUAD to HI-QUAD-X
Remote operations of Sahil
15002 Sahil Waiting for details system with redundant CPU and communication module. Software NO SCOPE No Scope
from Asab
logic changes to be taken care by site operation team. Panel layout
As per the MOC received on 11th July 2024,it is understood from the
and wiring drawings to be updated as per the inputs received
MOC is related to provide additional consoles in ASAB control room
Qw CDS Disposal pumps and to develop the graphics and logics in ASAB to perform remote
15012 Qusahwira No Action
operations at SAHIL area from ASAB. Control room layout of ASAB and
NO SCOPE No Scope
logic changes
SAHIL CCR, System architecture drawings are required from ADNOC to
implement the changes.
S.No MOC #
8 807
1 924
2 1489
9 3932
10 3933
11 3937
12 3947
13 5458
14 5657
15 8981
3 11484
4 11485
16 14647
5 14943
6 14953
17 15002
7 15012
DRAWING NUMBER
MASTER-16-71-08-0213-1
P14364-58-11-08-1610-1
QW-32 PID P14395-58-71-08-1686
MASTER-16-01-08-1121-1
NO SCOPE
NO SCOPE
NO SCOPE
MASTER-1601-08-0251-1
NO SCOPE
NO SCOPE
NO SCOPE
P14395-58-12-08-1621-1 & P14395-58-12-08-1624-1
NO SCOPE
MASTER-58-01-08-0134-2 & MASTER-58-01-08-0137-3
NO SCOPE
NO SCOPE
NO SCOPE
MOC
MOC # AREA ELECTRICAL INSTRUMENTATION PROCESS PIPING/Civil/Pipeline REMARKS
DESCRIPTION

Converting Sa-131 in ESP As per the MOC 807 SOW, Oil Producer SA-131 was converted to an ESP well, but none of
807 Sahil Waiting for Inputs Waiting for Inputs Received Waiting for Inputs
well the Discipline drawings have been received, except for the P&ID.

As per the MOC 1489 SOW, the QW-32 modification was done in the ESP artificial lift
well. However, the current master status of QW-32 still reflects it as an oil producer well
Qw-32 natural flow oil
1489 Qusahwira Waiting for Inputs Waiting for Inputs Received Waiting for Inputs in the drawings. Therefore, the conversion of QW-32 from an oil producer to an ESP
producers to ESP conversion
artificial lift well must first be documented in the master project engineering drawings.
but none of the Discipline drawings have been received, except for the P&ID.