0% found this document useful (0 votes)
7 views

group

Uploaded by

nuh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

group

Uploaded by

nuh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 13

AAHDPOKirkos sub-city

Construction
Construction of Cost Efficient Appartments
Contract Document
Bole Summit

SUMMERY

A) SUB STRUCTURE

1- EXCAVATION AND EARTH WORK --------------------- BIRR

2- CONCRETE WORK-------------------------------------------- BIRR

3- MASONERY WORK----------------------------------------- BIRR

TOTAL SUM OF A ---------


BIRR

B) SUPER STRUCTURE

1- CONCRETE WORK-------------------------------------------- BIRR

2- BLOCK WORK------------------------------------------------ BIRR

3- ROOFING WORK------------------------------------------- BIRR

4 CARPENTARY AND JOINERY -----------------------------------


BIRR

5 METEAL WORK---------------------------------------- BIRR

6 Structural steel work BIRR

7 FINSHING WORK------------------------------------------- BIRR

8 PAINTING------------------------------------------------------ BIRR

9 GLAZING BIRR

10 L;AND SCAPING BIRR

11 SANITARY WORK-------------------------------------------- BIRR

12 ELCTRICAL WORK-------------------------------------------- BIRR

TOTAL SUM OF B ----------


BIRR
C) GENERAL ITEM
1 Concrete quality test BIRR
TOTAL SUM OF C -------------------------

TOTAL SUM OF A,B& C BIRR


----

CONTINGENCY 10% BIRR

summary of A1 Shop in Z
BET Consulting architects
one 4
AAHDPOKirkos sub-city
Construction
Construction of Cost Efficient Appartments
Contract Document
Bole Summit
TOTAL WITH CONTINGENCY
BIRR

VAT 15 % BIRR

TOTAL WITH VAT----------


BIRR

summary of A1 Shop in Z
BET Consulting architects
one 4
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
Ite
Unit
m Description Unit Qty Amount
Rate
No
A. SUBSTRUCTURE
1. EXCAVATION AND EARTH WORK

Site clearing and removing the top 200 mm


1.01 thick soil m2 889

Bulk excavation in ordinary soil to a depth of


1.02 up to 1500 mm from reduced level. m3 654.00

Excavation for footing to a depth not exceeding


1.03 1500mm in ordinary soil m3 54
Ditto but exceeding 1500mm not exceeding
1.04 3000mm m3 98
1.05 Excavation for footing in hard rock m3 435
1.06 Excavation for footing in weathered rock m3 32

Trench excavation in ordinary soil for masonry


foundation to depth of 1500 mm from reduced
1.07 level. m3 654

Fill around footing and foundation columns


with imported selected materials from out side
well rolled and compacted in layers not
1.08 exceeding 200 mm thick. m3 654

Fill under hard core with imported selected


materials from out side well rolled and
compacted in layers not exceeding 200 mm
1.09 thick. m3 432

Fill under hard core with imported selected


materials from site well rolled and compacted
1.1 in layers not exceeding 200 mm thick. m3 787

Remove surplus excavated materials and


1.11 deposit to a distance 5Km. m3 56

250mm thick basaltic stone hardcore well


rolled, consolidated and blinded with crushed
1.12 stone . m2 976

Total Carried to Summary…………………

2. CONCRETE WORK
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )

Particular attention must be given to the


following notes along with the Technical
Specification and Method of Measurement
prepared by BaTCoDA.
Constituents of concrete:

The quality of ingredients of concrete must


fulfill the requirements, concrete trial mixes
shall be done and certified by laboratory test
results before casting of structural elements.
During concrete casting samples should be
taken for laboratory tests.

Concrete :

The specified concrete strength must be


confirmed by laboratory test.
Reinforcement bar :

The specified yield strength and other related


properties of reinforcement bar must be
certified either by manufacturer's
catalogue/manual or/and by laboratory test.
50mm lean concrete quality C-5, 150 kg of
2.01 cement/m3,
a) Under footing m2 113
b) Under floor slab m2 338
c) Under Grade Beam & Stone Masonary
Masonry foundation m2 87

Reinforced concrete quality C-25,minimum


cement content of 360 kg of cement/m3 filled
in to form work and vibrated around rod
reinforcement (formwork and reinforcement
2.02 measured separately)
a) To footing m3 79
b) To Foundation column m3 321
c) To grade beam and steps m 3
32
d) To 100mm thick ground floor slab m 2
98

Formwork shall be timbered or steel or a


combination of two, sufficient to contain the
wet concrete without leakage. Enough to
support temporary loading and pressure from
placing Compaction or vibration without
2.03 displacement or appreciable deflection.
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
a) Footing pad m2 89
b) Foundation column m 2
110
c) Grade beam m 2
103

Mild steel bar reinforcement according to


structural drawings. Reinforcement shall be
free from dirt, oil, grease, paint, readers paint,
etc and any other substances which may affect
the reinforcement and concrete bond (price
include cutting bending and placing in
2.04 position).
Dia. 6deformed bar kg 23
Dia. 8 deformed bar kg 76
Dia. 10 deformed bar kg 98
Dia. 12 deformed bar kg 654
Dia. 14 deformed bar kg 98
Dia. 16 deformed bar kg 654
Dia. 20 deformed bar kg 32
Concrete Ancillaries

10mm thick 150mm deep chipwood expansion


2.05 joint filler. ml 543

Total Carried to Summary…………………

3. MASONRY WORK

500 mm thick basaltic or equivalent type stone


masonry bedded in cement mortar(1:3) mix
below ground surface. price shall include
3.01 cement mortar bed. m3 98

500 mm thick basaltic or equivalent type stone


masonry bedded in cement mortar(1:3) mix
above ground surface. price shall include
3.02 cement mortar bed & pointing exposed face. m3 43

Total Carried to Summary…………………

C. SUPER-STRUCTURE
1. CONCRETE WORKS
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
1.1 Reinforced concrete in class C-25 (with a 28-
day 15cm cube crushing strength of 25MPa),
cast into formworks and vibrated around rod
reinforcement bars.( formwork & reinforcement
bars are measured separately.) in: "Type of
cement to be ordinary portland cement (OPC)"

a) elevation columns m3 35.00


b) intermediate & top tie beam m3 74.00
c) Stair case & Landing m 3
12.00
d) concrete fillers around columns & beam
connections at floor levels m3 5.00
1.2 Suspended ribbed slab of total 28cm thick
comprising of ribbed blocks rests on pre-cast
beams spaced at 62.5 cm c/c and 60mm thick
C-25 topping concrete over pre cast unit &
slab HCBand b/n HCB blocks . Price includes
placing in position 22cm thick Rosa-cometa
(hollow concrete ribbed block) type Class-C
with 28 days minimum crushing strength of
18kg/cm2, placed in position & bottom face left
for plastering and for props and joist under
280mm thick ribbed floor slabs ( props and joist
to support at mid quarter points of ribbed pre-
cast beams). Joists shall be of structural steel
50x50x2.5mm RHS sections or 50x70mm
seasoned Timber . Props may be tubular
sections or eucalyptus . Props spacing shall
not exceed two times ribbed spacing ( 1250mm
c/c . Price measured in m2 of the slab soffit

a) first floor ribbed slab m2 256.75


b) second floor ribbed slab m2 256.75
c) third floor ribbed slab m 2
256.75
d) fourth floor ribbed slab m 2
256.75

e) Pre-cast rib unit of size (493 X 12 X 8cm)


consisting of 19.2 kg of reinforcing bar and
0.05m3 of C-25 concrete (Price shall include
transportation and placing in position) pcs 212

f) Pre-cast rib unit of size (392 X 12 X 8cm)


consisting of 13.7 kg of reinforcing bar and
0.04m3 of C-25 concrete (Price shall include
transportation and placing in position) pcs 104
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )

g) Pre-cast rib unit of size (291X 12 X 8cm)


consisting of 10.2 kg of reinforcing bar and
0.03m3 of C-25 concrete (Price shall include
transportation and placing in position) pcs 28
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
h) Provide the necessary inputs (cement and
reinforcement) and supervise the production of
precast rib units by the client's nominated MSE.
The main Contractor shall be responsible for
the quality of the works and eventually
administer and commission the nominated MSE
by the Client.
ls 1.00
1.3 Sawn zigba wood form work for:
a) elevation columns m2 381.00
b) intermediate & top tie beam m2 628.00
c) Stair case & Landing m2 91.00
d) concrete fillers around columns & beam
connections at floor levels m2 16.00
1.4
Reinforcement steel bars according to
structural drawing. Price includes cutting,
bending, placing in position and tying wires.
a) dia. 6mm plain bar kg 2052.00
b) dia. 8mm deformed bar kg 2878.00
c) dia. 10mm deformed bar kg 527.00
d) dia. 12mm deformed bar kg 1952.00
e) dia. 14mm deformed bar kg 8293.00
f) dia. 16mm deformed bar kg 2729.00
g) dia. 20mm deformed bar kg 3916.00

TOTAL CARRIED TO SUMMARY ......

2. BLOCK WORK
2.1
Supply and construct class 'C'
200x200x400mm HCB wall with cement mortar
1:4 mix ratio. m2 1153.19
2.2 Ditto, item 2.1, for HCB veranda rail m 2

2.3
Supply and construct 10cm thick class C H.C.B
wall bedded and jointed with cement mortar
1:4. m3 633.10
2.4 Supply and fix double 100mm thick Agrostone
wall panel. m2
2.5 Supply and fix single 100mm thick Agrostone
wall panel. m2
2.6 Supply and fix 100mm thick and 900mm height
Agrostone wall panel for balcony. m2

TOTAL CARRIED TO SUMMARY ......

3. ROOFING
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
3.1
Roof cover in EGA - 500, 0.5mm thick fixed to
SHS purlins with standard hooks and washers.
Roof cover measured in horizontal projection.
Price includes ridge cover and two coats of
anti-rust paint. m2 309.00
3.2
Supply & fix G-28 galvanized flat metal sheet
gutter of dev. Length 66cm spliced at joints
and painted one coat of anti-rust and two coats
of synthetic paint. ml 88.00
3.3
Supply & fix 110mm diameter PVC down pipe
secured to wall with metal bracket with
ancorage distance of 800mm. ml 259.00
3.4 Supply &fix ridge cover G - 28, development
length 33cm ml 52.00

TOTAL CARRIED TO SUMMARY ......

4. JOINERY
4.1 Supply and fix flush wooden doors both sides
covered with 4mm thick good quality kerrero
ply wood with sides, top and bottom lipped and
edged with hard wood complete work with all
the necessary accessories. Price includes three
coats of varnish paint, locks, hinges & stopper.

a) Size: - 75 x 260cm (toilet) pcs 30


4.2 Provide the necessary civil work preparation
and supervise the installation of the above
Joinery work by the client's nominated MSE.
The main Contractor shall be responsible for
the quality of the works and eventually
administer and commission the nominated MSE
by the Client.
ls 1.00

TOTAL CARRIED TO SUMMARY ......

5. METAL WORK
5.1 Supply and fix 28mm black iron LTZ section
a) D-1profile
steel Size: -frame
100 xmetal
240cmdoor
(main entrance)
including all the pcs 40
necessary accessories. Unit price includes best
quality cylindrical door lock, one coat of anti-
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
b) WD1 Size: - 477x 240cm (shop) pcs
c) WD2 Size: - 376x 240cm (shop) pcs
5.2

Glazed metal windows made of 28mm black


iron LTZ section steel profile frame complete
with all the necessary accessories. Unit price
includes one coat of anti-rust and two coats of
synthetic enamel paint:
a) W1 Size: - 150 x 150cm (Living & dining) pcs 30
b) W2 Size: - 120 x 150cm (bed room) pcs 24
c) W3 Size: - 100 x 150cm (kitchen) pcs 28
d) W4 Size: - 60 x 70cm (toilet) pcs 30
5.3 Supply and fix stair balustrade made of R.H.S
50x50x2.5mm, R.H.S 30x30x2.5mm, R.H.S
20x20x1.5mm as shown on the drawing. Price
shall include one coat of anti-rust and two
coats of synthetic enamel paint and all the m2 22.00
necessary accessories.

5.4 Provide the necessary civil work preparation ls 1.00


and supervise the installation of the above
metal work
TOTAL byCARRIED
the client's nominated......
TO SUMMARY MSE. The
main Contractor shall be responsible for the

6. STRUCTURAL STEEL WORKS


Supply and erect steel roof structure all as
shown on the detail drawings. Apply two coats
of antirust paint. Price includes all necessary
preparation work such as cleaning, wire
brushing ,connecting plates, bolts, nuts, angle
iron, reinf bars finally two coats of anti-rust
paint.& all the necessary accessories.

6.1 Truss
Size:- 40 x 40 x 2.5mm kg 663.00
Size:- 30 x 30 x 2.5mm kg 268.00

6.2 Lattice Purline

Size:- 25 x 25 x 2.5mm kg 2,243.00


Size:- 25 x 25 x 2mm kg 259.00

6.3 Plate

a) Size:- 200 x 150 x 5mm pcs 56.00


Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
b) Size:- 200 x 200 x 5mm pcs
c) Size:- 250 x 150 x 5mm pcs
d) Size:- 300 x 100 x 5mm pcs
e) Size:- 300 x 150 x 5mm pcs
f) Size:- 500 x 150 x 5mm pcs

6.4 Gusset Plate


a) Size:- 300 x 100 x 3mm

pcs 12.00
b) Size:- 300 x 165 x 3mm pcs 40.00
c) Size:- 500 x 200 x 3mm pcs 12.00

6.5 J- bolts L = 235mm Grade 4.8


Size:- M12 pcs 56.00

TOTAL CARRIED TO SUMMARY ......

7. FINISHING

7.1 Wall finishing


7.1.1 Apply three coats of internal wall plastering
with cement mortar 1:3 mix ratio. m2 2560.00
7.1.2 Apply three coats of external wall plastering
with cement mortar 1:3 mix ratio. m2
7.1.3
Apply three coats of plastering with cement
mortar 1:3 mix ratio to concrete ceiling,
landing ,stair case beams & columns. m2 1259.00
7.1.4
Apply two coats of plastering with cement
mortartwo
Apply 1:3coats
mix ratio and final coat
of plastering with of tyrolean
cement
rendering
mortar 1:3to external
mix ratio toHCB walls.
receive ceramic wall m2 830.00
7.1.5 tile. m2 283.00
7.1.6 One coat of tyrolean rendering external
balcony Agrostone wall. m2
7.1.7
15x15x0.6cm white glazed ceramic wall tile for
toilet stuck to wall with cement mortar 1:3 to a
height of 150cm from finished floor level. Price
330x30mm terrazzo
includes white thread bedded and joined
cement. m2 283.00
7.1.8 with cement mortar 1:3 mix. ml 110.00
7.1.9 160x30mm terrazzo riser bedded and joined
with cement mortar 1:3 mix. ml 110.00
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
7.1.10
28x3cm terrazzo window sill bedded and
jointed with cement
20mm thick terrazzomortar
flooring1:3.
on and including ml 103.00
30mm cement sand screed (1:3) mix price
including
7.2 Floorgrinding and polishing for circulation
finishing
7.2.1 area. m2 243.00
7.2.2 40mm thick cement screeding with cement
mortar of ratio 1:3 mix. m2 817.00
7.2.3

Supply and coat MAYA PROOF WS-2 or Zypex


Equivalent semi elastic cementitious water
proofing as per the manufacturer's instruction
to first upto fourth floor toilet floor & wall. m2 67.00
7.2.4
Mosaic floor tiles or porcelain tiles on and
including cement sand screed (1:3)mix with a
total finished thickness of 50mm and joints
pointed in cement mortar (1:3) mix to toilet
rooms. m2 84.00

TOTAL CARRIED TO SUMMARY ......

8. PAINTING
8.1 Apply three coats of approved type plastic
paint
Ditto, for
itemVerenda
8.1, but&for
balcony wall
external surfaces.
rendered wall m2 305.00
8.2 surfaces. m 2
584.00
Prepared by BET Consulting Architects 02/04/2025

BoQ- ( SUB STRUCTURE ), TYPOLOGY = A1, BLOCK = SHOP, ZONE=4( 400 Kpa )
8.3 Ditto, item 8.1, but for sofit of stair, slab ,
beams and columns. m2 550.00
8.4 Ditto, item 8.1, for interior part of HCB
veranda rail8.1, for external rendered HCB
Ditto, item m2
8.5 veranda rail m2

TOTAL CARRIED TO SUMMARY ......

9. GLAZING
9.1
4mm thick clear glass glazed to windows with
putty. m2 137.00
9.2 Ditto, item 8.1, but figured glass to doors. m 2
88.00

TOTAL CARRIED TO SUMMARY ......

10. LANDSCAPING
10.1 Plant indigenous tree (two per block) at the
commencement of the works at a convenient
nearby location (species to be approved by the
engineer). The contractor is responsible for
watering and giving due care till the
completion of the project.
pcs 2.00

TOTAL CARRIED TO SUMMARY ......