Capex 2024 IBIS - Status Report 1
Capex 2024 IBIS - Status Report 1
1 BUDGETED FF&E IT
1 BUDGETED FF&E Engineering
2 BUDGETED FF&E Engineering
2 BUDGETED FF&E IT
2 BUDGETED FF&E Engineering
2 BUDGETED CAPEX Engineering
3 BUDGETED CAPEX Engineering
3 BUDGETED FF&E Engineering
4 BUDGETED CAPEX Engineering
5 BUDGETED CAPEX Rooms
5 BUDGETED CAPEX Engineering
5 BUDGETED CAPEX Engineering
5 BUDGETED FF&E Engineering
6 BUDGETED CAPEX Engineering
9 BUDGETED FF&E Engineering
10 Non-Budgeted Rooms
11 Non-Budgeted Engineering
12 Non-Budgeted Engineering
13 Non-Budgeted IT
14 Non-Budgeted Engineering
15 Non-Budgeted IT
509,172
93,600
14,080
11,457
119,137
Code Balance
HO-ITE-0001-NB (1,911)
HO-EEM-0009-1 ,HO-EEM-0009-NB2 (4,850)
HO-EEM-0003/1 -
HO-ITE-0004 -
H0-EEM-0002 , HO-Rooms-0002 (2,075)
HO-EEM-0004 , HO-ITE-0002-NB,HO-ITE-0004 (30,543)
HO-Rooms-0003 (1,560)
HO-EEM-0004/NB1 (800)
HO-EEM-0004 -
HO-Rooms-0002 0
H0-BAT-0004 (230)
(8,000)
H0-EEM-0001 (200)
HO-EEM-0004 -
H0-EEM-0002 -
- (50,169)
YTD Current FF&E reserve: 99,702
YTD Current year expensed: 509,172
YTD balance: (409,470)
Apr-24 1,994,049
May-24 (1,994,049)