0% found this document useful (0 votes)
5 views3 pages

M & R Civil

Uploaded by

urveshdudhat11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views3 pages

M & R Civil

Uploaded by

urveshdudhat11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

SCHEDULE - O&M Civil

ANNEXURE NO.1 B
Remodelling of UMRALA ZONE WATER SUPPLY SCHEME
Statement Showing Annual Maintanance and Repairs Cost
Sr. Net cost incl.
Particulars Av. M&R Amount for M & R Re marks
No. contigency
1 2 3 4 5 6
A-Proposed Work
1 WTP at Umarala & Magariya H/W 68,458,300.0 1% 684583.00
2 Rising main pipeline 26,640,100.0 0.25% 66600.25
3 Gravity Main Non Metalic Pipe 342,824,100.0 0.25% 857060.25
4 RCC ESR 21,979,700.0 0.50% 109898.50
5 RCC HGLR 49,846,100.0 0.50% 249230.50
6 Pump house 4,150,700.0 0.50% 20753.50
7 Chlorination Arrangement 555,700.0 2.50% 13892.50
Total Rs. 2002018.50

B-Aug. Work likely to be comp. within 6 months


(1) Kalatalav Group: 450 MM Dia DI Rising Main upto Magariya 11485000.00 0.25% 28712.50

(2) Vallabhipur to Umrala MHW 500 MM Dia DI Rising Main 22030000.00 0.25% 55075.00

(3 )Piprali Group: RM from Umrala HW to Piparali 250 mm PVC 10935000.00 0.25% 27337.50

(4) Kalatalav Gr. Gravity Main 23593000.00 0.25% 58982.50

(5) GM for Chamardi 10646000.00 0.25% 26615.00


(6) GM for Rajpipla to Ingorala 315 mm PVC 13296000.00 0.25% 33240.00
(7) GM forKalatalav to Vadod PVC 180/140 mm Dia 3617000.00 0.25% 9042.50
(8)Rajpipla group : Pump House of Size : 12.0 x 8.0 Mt 1634000.00 0.50% 8170.00
(9)Piprali HW New 5 LL Sump & PHRajpipla group : Pump House of Size 2187000.00 0.50% 10935.00
: 12.0 x 8.0 Mt wall for Rajpipla/Almpra & Limda HW
(10)Compound 4000000.00 0.50% 20000.00
Total for Aug. Work Component 278110.00
C-Existing Work
Sr. Net cost incl.
Particulars Av. M&R Amount for M & R Re marks
No. contigency
1 2 3 4 5 6
(A) Rising main & Gravity Main pipeline
(1) Rajasthali Group: 250 MM Dia AC & 200 MM to 90 MM Dia PVC Pipe
5019800.00 0.30% 15059.40
for villages.
(2) Piprali Group: RM from Umrala HW to Piparali & GM Pipe of Diff.sizes
Canceled 0.30% 0.00
for villages
(3)Rajpipla group : RM,GM Pipe of Diff.sizes for villages for Rajpipala
118696200.00 0.30% 356088.60
Group
(4) Kala talav group : RM,GM Pipe of Diff.sizes for villages for Kalatalav
62000000.00 0.30% 186000.00
Group
Total Rs. 557148.00
(B) Pump house
(1) Rajasthali Group: Pump House of Size : 14.0 x 8.0 Mt. 1.0 No. 477000.00 0.50% 2385.00
(2) Piprali Group: Pump House of Size : 4.0 x 3.0 Mt. 1.0 No. Demolish 0.50% 0.00
(3)Rajpipla group : Pump House of Size : 8.0 x 5.0 Mt.@ Rajpipala MHW
318000.00 0.50% 1590.00
1.0 No. & Pump House of Size : 8.0 x 5.0 Mt.@ Limada SHW 1.0 No.
(4) Kala talav group :Pump House of Size : 8.0 x 5.0 Mt.@ Kalatalav MHW
318000.00 0.50% 1590.00
1.0 No. & Pump House of Size : 8.0 x 5.0 Mt.@ Alampar SHW 1.0 No.
Total Rs. 5565.00
(C) RCC Sump
(1) Rajasthali Group: RCC U/G Sump 20.00 Lacs Liters Capicity @ Umrala 2072400.00 0.50% 10362.00
MHW 1.0 No.
(2)Rajpipla group :RCC U/G Sump 20.00 Lacs Liters Capicity @ Rajpipala
3325600.00 0.50% 16628.00
MHW 1.0 No. & RCC U/G Sump 10.00 Lacs Liters Capicity @ Limada
SHW 1.0 No.
(3) Kala talav group : RCC U/G Sump 18.00 Lacs Liters Capicity @
Kalatalav MHW 1.0 No. & RCC U/G Sump 5.00 Lacs Liters Capicity @
5877240.00 0.50% 29386.20
Kalatalav MHW 1.0 No. & RCC U/G Sump 2.50 Lacs Liters Capicity @
Alampar SHW 1.0 No.
Total Rs. 56376.20
(D) RCC ESR
(1) Rajasthali Group: RCC ESR 7.0 Lacs Lit. Cap. & 15.0 M.Ht.@ Umrala 2642700.00 0.50% 13213.50
MHW 1.0 No.
(2) Piprali Group: RCC ESR 1.80 Lacs Lit. Cap. & 10.0 M.Ht.@ Piparali
SHW 1.0 No. & RCC ESR 2.50 Lacs Lit. Cap. & 12.0 M.Ht.@ Piparali SHW 1865200.00 0.50% 9326.00
1.0 No.
(3)Rajpipla group RCC ESR 6.30 Lacs Lit. Cap. & 15.0 M.Ht.@ Rajpipala
2924500.00 0.50% 14622.50
MHW 1.0 No. & RCC ESR 2.70 Lacs Lit. Cap. & 18.0 M.Ht.@ Rajpipala
MHW 1.0
(4) Kala No. group : RCC ESR 2.50 Lacs Lit. Cap. & 15.0 M.Ht.@
talav
910400.00 0.50% 4552.00
Kalatalav MHW 1.0 No.
Total Rs. 41714.00
(E) RCC HGLR
(1) Kala talav group : RCC HGLR 10.00 Lacs Liters Capicity @ Maghariya
1162000.00 0.50% 5810.00
MHW 1.0 No.
Total Rs. 5810.00
(F) Well

(1) Piprali group : Well 6.00 Mtr. Dia. & 20.00 mtr. Depth 1.0 No. 600000.00 0.50% 3000.00
Total Rs. 3000.00

Grand Total Rs. 669613.20


Grand Total (A+B+C) 2949741.70
Say Rs.. 2949750.00
Deduct 70 % of Material Cost of RM and GM 1203869.45
Net M & R cost for One year Rs. 1745880.55
Say Rs.. 1745881.00

Executive Engineer Dy.Executive Engineer


P. H. W. Division P. H. Sub. Division .
Bhavnagar Umrala