0% found this document useful (0 votes)
12 views2 pages

GODHA - CL - 005 - Column or Shear Wall

Uploaded by

King Vithal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views2 pages

GODHA - CL - 005 - Column or Shear Wall

Uploaded by

King Vithal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Checklist for Column / Shearwall RCC Works

Doc. No : GODHA/CL/005/

Project: Date:

Contractor Name: Location / Grid No:

Reinforcement / Steel:
Quantity as per Drawing: Actual Quantity:
Shuttering / Formwork:
Quantity as per Drawing: Actual Quantity:
Concrete:
Quantity as per Drawing: Actual Quantity:

Status
Sl. No. Description Remarks
Yes No

Reinforcement

1 Check for reinforcement tested and satisfied as per specification.

2 Whether BBS handovered prior checking?

3 Check for grade of the steel.

4 Check for reinforcement diameter as per drawing.

5 Check for spacing as per drawing.

6 Check for laps provided as per drawing.

7 Check for sufficient bearing provided for beam and slab reinforcement.

8 Check for sufficient cover provided.

9 Check for reinforcement tied properly.

10 Check for additional rings/stirrups provided above the slab top.

11 Check for column reinforcement reduction / extension.

Formwork

1 Check for proper access provided.

2 Check for quality of form work.

3 Check for number of repetitions of ply wood and thickness.

4 Check for level/height.

5 Check for center lines.

6 Check for dimensions as per drawing.


7 Check for alignment.

8 Check for verticality.

9 Check for diagonal.

10 Check for supports are adequately provided.

11 Check for rigidity of support.

12 Check for extra supports required, specify location.

13 Check for insert plates and embedment.

Concrete Pour Card

1 Check for grade of concrete.

2 Check for slump.

3 Check for availability of vibrator.

4 Check for cubes are taken as per the requirement.

Post Concrete

1 Check for dimensions of core wall.

2 Check for dimensions of column at top, middle and bottom.

3 Check for shear keys provided.

4 Check for line, level and plumb.

5 Check for proper cleaning of reinforcement.

6 Check for de-shuttering done as per specified time.

7 Check for arrangement of curing and marking of the date.

8 Check for 7 days cube strength satisfied.

9 Check for 28 days cube strength satisfied.

Comments:

Contractor's Rep. :- Client's Rep. :-


Signature : Signature :

Name : Name :