0% found this document useful (0 votes)
3 views

Travelling September

The document is a claim form for September 2024 submitted by employee Chirag Powar, a Project Manager at E Homemaker Solutions India Pvt Ltd. It details various trips made by the employee, including dates, purposes, project locations, kilometers traveled, mode of transport, and amounts claimed, totaling 3960. The form includes sections for signatures from the claimant, reporting manager, and accounts manager for approval and processing.

Uploaded by

chirag.powar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Travelling September

The document is a claim form for September 2024 submitted by employee Chirag Powar, a Project Manager at E Homemaker Solutions India Pvt Ltd. It details various trips made by the employee, including dates, purposes, project locations, kilometers traveled, mode of transport, and amounts claimed, totaling 3960. The form includes sections for signatures from the claimant, reporting manager, and accounts manager for approval and processing.

Uploaded by

chirag.powar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

E homemaker Solutions India Pvt Ltd

Claim Form for the month - September 2024


Employee Name: CHIRAG POWAR Employee Code: HI-12815
Reporting Manager: HARSH SHETH Designation of Employee: PROJECT MANAGER

Designation of Reporting OPERATION MANAGER


Manager:
Date Particulars - Purpose / From / To Project KMs Mode Amount
2-Sep-2024 Rutuja Borivali East 30 bike 120
3-Sep-2024 Neha Tanna Grant Rd Site 50 bike 200
4-Sep-2024 Usha kaushal Prabhadevi site 55 bike 220
5-Sep-2024 Neha Tanna Grant Rd Site 60 bike 240
6-Sep-2024 Rutuja Borivali 45 bike 180
7-Sep-2024 Usha kaushal Prabhadevi site 30 bike 120
9-Sep-2024 Usha kaushal Prabhadevi site 30 bike 120
10-Sep-2024 Deepak Yadav Borivali East 30 bike 120
11-Sep-2024 Usha kaushal Prabhadevi site 35 bike 140
12-Sep-2024 Rutuja Borivali East 45 bike 180
13-Sep-2024 Usha kaushal Prabhadevi site 30 bike 120
14-Sep-2024 Deepak Yadav Malad site 45 bike 180
16-Sep-2024 Usha kaushal Prabhadevi site 50 bike 200
17-Sep-2024 Usha kaushal Prabhadevi site 50 bike 200
18-Sep-2024 Deepak Yadav Borivali East 30 bike 120
19-Sep-2024 Usha kaushal & Dinesh Prabhadevi site 50 bike 200
20-Sep-2024 Deepak Yadav Borivali Site 30 bike 120
21-Sep-2024 Neha Tanna Grant Rd Site 60 bike 240
23-Sep-2024 Usha kaushal Prabhadevi site 55 bike 220
24-Sep-2024 Neha Tanna Grant Rd Site 60 bike 240
25-Sep-2024 Usha kaushal Prabhadevi site 30 bike 120
26-Sep-2024 Usha kaushal Prabhadevi site 30 bike 120
27-Sep-2024 Dinesh Singh Borivali East 30 bike 120
28-Sep-2024 Usha kaushal Prabhadevi site 30 bike 120
TOTAL 3960
Claimed by Approved by Processed by

(Signature) (Reporting Mngr. Signature) (Accounts Mngr Signature)

You might also like