The document is a detailed estimate for the construction of a proposed one-storey building owned by Joannie A. Arpay, located in Brgy, Anajawan, General Luna, Surigao Del Norte. It includes itemized costs for various construction activities such as clearing, earthworks, formworks, concrete works, masonry, ceiling, doors and windows, roofing, tiles, plumbing, and electrical works, along with associated materials and labor costs. The total estimate encompasses quantities, unit prices, and total costs for each item, providing a comprehensive financial overview of the project.

Uploaded by

Vilia Galano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

estimate 1

The document is a detailed estimate for the construction of a proposed one-storey building owned by Joannie A. Arpay, located in Brgy, Anajawan, General Luna, Surigao Del Norte. It includes itemized costs for various construction activities such as clearing, earthworks, formworks, concrete works, masonry, ceiling, doors and windows, roofing, tiles, plumbing, and electrical works, along with associated materials and labor costs. The total estimate encompasses quantities, unit prices, and total costs for each item, providing a comprehensive financial overview of the project.

Uploaded by

Vilia Galano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

DETAILED ESTIMATE

NAME : Proposed One Storey Building


OWNER : Joannie A. Arpay
LOCATION : Brgy, Anajawan, General Luna, Surigao Del Norte

Item I - Clearing / Layout


QTY= 37.44 sq.m.

A. Materials

2 pcs # 30 Nylon @ 20.00 40.00


12 pcs 2"x2"x10' Coco Lumber @ 40.00 480.00
12 pcs 2"x3"x10' Coco Lumber @ 60.00 720.00
1 kls #3 1/2" CWN nails @ 95.00 95.00
P 1,335.00
B. Labor

1 Foreman for 1.00 days @ 700.00 700.00


1 Carpenter for 1.00 days @ 500.00 500.00
1 Helper for 1.00 days @ 350.00 350.00
P 1,550.00

Item II - Earthworks (Excavation & Back fill)


QTY= 26.33 cu.m.

A. Materials

1 cu.m. Gravel Fill @ 3,000.00 1,500.00


P 1,500.00
B. Labor

1 Foreman for 1.00 days @ 700.00 700.00


5 Laborers for 6.00 days @ 350.00 10,500.00
P 11,200.00

Item III - Formworks and Scaffolding


QTY= 102.93 sq.m.

A. Materials

7 pcs. 8'x4'1/4"thk Marine Plywood @ 360.00 P 2,520.00


100.0 bd.ft. 2"x2"x10 Coco Lumber Forms @ 17.00 1,700.00
180.0 bd.ft. 2"x2"x10 Coco Lumber Forms @ 17.00 3,060.00
12 kls. Assorted CWN Nails @ 95.00 1,140.00
5 kls. Tie Wire # 16 @ 85.00 425.00
P 8,845.00
B. Labor

1 Foreman for 8.00 days @ 700.00 5,600.00


2 Carpenters for 8.00 days @ 500.00 P 8,000.00
4 Laborers for 8.00 days @ 350.00 11,200.00
P 24,800.00

Item IV - Concrete Works


QTY= 11.31 cu.m.

A. Materials

Proposed One Storey Building Page 1 of 5 ESTIMATE


112 bags Portland Cement @ 280.00 P 31,360.00
6.0 cu.m. Sand @ 2,100.00 12,600.00
12 cu.m. Gravel @ 2,100.00 25,200.00
37 kls. 16mm dia.def.bar @ 295.00 10,915.00
80 pcs. 10mm dia.def.bar @ 160.00 12,800.00
15 kls. Tie Wire # 16 @ 85.00 1,275.00
P 94,150.00
B. Labor

1 Foreman for 10.00 days @ 700.00 7,000.00


2 Steelman for 10.00 days @ 500.00 P 10,000.00
4 Laborers for 10.00 days @ 350.00 14,000.00
P 31,000.00

Item V - Masonry Works


QTY= 53.00 sq.m.

A. Materials

700 pcs. CHB # 4" @ 30.00 P 21,000.00


4 cu.m. Sand @ 2,100.00 8,400.00
50 bags Portland Cement @ 240.00 12,000.00
20 pcs. 10mm dia.def.bar @ 160.00 3,200.00
5 kls. Tie Wire # 16 @ 85.00 425.00
P 45,025.00
B. Labor

1 Foreman for 12.00 days @ 700.00 8,400.00


2 Mason for 12.00 days @ 500.00 P 12,000.00
4 Laborers for 12.00 days @ 350.00 16,800.00
P 37,200.00

Item VI - Ceiling Works


QTY= 35.44 sq.m.

A. Materials

8 shts. 8'x4'x1/4" Marine Plywood @ 480.00 P 3,840.00


10 shts. AMAKAN (Waved Bamboo) @ 500.00 P 5,000.00
230 bd.ft. 2"x2"x12' Good Lumber @ 25.00 5,750.00
10 kls. C.W. Nails 4" @ 80.00 800.00
20 kls. C.W. Nails 2 1/2" @ 85.00 1,700.00
20 kls. C.W. Nails 1/2" @ 95.00 1,900.00
10 kls. Concrete Nails 4" @ 120.00 1,200.00
P 20,190.00
B. Labor

1 Foreman for 4.00 days @ 700.00 2,800.00


2 Carpenters for 4.00 days @ 500.00 P 4,000.00
4 Laborers for 4.00 days @ 350.00 5,600.00
P 12,400.00
Item VII - Doors and Windows
QTY= 35.44 sq.m.

A. Materials

Proposed One Storey Building Page 2 of 5 ESTIMATE


1 set Fixed & Sliding Door with 1/4" THK.
Clear Glass Complete with Hardware
& Accessories (3.0m x2.1m) @ 7,500.00 7,500.00
1 set Fixed & Sliding Window 1/4" thk
THK Clear Glass Complete with
Hardware & Accessories (1.6 x 1.2) @ 3,000.00 3,000.00
1 set Fixed & Sliding Window 1/4"
THK Clear Glass Complete with
Hardware & Accessories (.90m x 0.65m) @ 2,500.00 2,500.00
P 13,000.00

Item VIII - Roofing and Roof Framing


QTY= 67.26 sq.m.

A. Materials

80 shts. Corrugated Metal Sheets @ 400.00 P 32,000.00


10 shts. Plain G.I. Shts @ 550.00 5,500.00
200 Bd.Ft. Good Lumber 2x6x20 @ 75.00 15,000.00
144 Bd.Ft. Good Lumber 2x3x12 @ 75.00 10,800.00
20 kls. C.W. Nails 2 1/2" @ 90.00 1,800.00
20 kls. Umbrella Nails 3" @ 100.00 2,000.00
2 qrtz. Vulca Seal @ 450.00 900.00
P 68,000.00
B. Labor

1 Foreman for 4.00 days @ 700.00 2,800.00


2 Carpenters for 4.00 days @ 500.00 P 4,000.00
4 Laborers for 4.00 days @ 350.00 5,600.00
P 12,400.00

Item IX - Tiles Works


QTY= 28.00 sq.m.

A. Materials

30 pcs. Floor Tiles 0.40 x 0.40 Non Slip-tile (CR) @ 45.00 1,350.00
135 pcs. Floor Tiles 0.60 x 0.60 Ceramic Tiles @ 110.00 14,850.00
56 bags ABC Tile Grout @ 45.00 2,520.00
1 cu.m. Sand @ 2,100.00 2,100.00
8 bags Cement @ 280.00 2,240.00
P 23,060.00
B. Labor

1 Foreman for 3.00 days @ 700.00 2,100.00


2 Mason for 3.00 days @ 500.00 P 3,000.00
2 Laborers for 3.00 days @ 350.00 2,100.00
P 7,200.00

Item X - Plumbing Works


QTY= 1.00 unit

SANITARY LINE

3 pcs. PVC P-Trap 2" dia. @ 180.00 P 540.00


2 pcs. PVC WYE 4" dia.x 4" dia. @ 160.00 320.00
1 pcs. PVC Tee 4" dia.x 2" dia. @ 80.00 80.00

Proposed One Storey Building Page 3 of 5 ESTIMATE


1 pcs. PVC Clean Out Plug 4" dia. @ 60.00 60.00
2 pcs. PVC Elbow 4" dia.x 90 deg. @ 80.00 160.00
3 pcs. PVC Elbow 2" dia.x 90 deg. @ 40.00 120.00
3 pcs. PVC Elbow 4" dia.x45 deg. @ 80.00 240.00
1 pcs. PVC WYE 4" dia.x2" dia. @ 160.00 160.00
2 pcs. PVC Pipe 4" dia. @ 780.00 1,560.00
6 pcs. PVC Pipe 2" dia. @ 230.00 1,380.00
1 ltr. Solvent Cement @ 300.00 300.00
1 sets Water Closet w/ Accessories @ 9,500.00 9,500.00
1 pcs. Floor Drain @ 55.00 55.00

WATER LINE

3 pcs. Faucet @ 180.00 P 540.00


4 pcs. PVCElbow 1/2" dia. 90 deg. @ 15.00 60.00
2 pcs. St. Elbow 1/2" dia. @ 15.00 30.00
6 pcs. Union 1/2" dia. @ 45.00 270.00
10 pcs. Coupling 1/2" dia. @ 15.00 150.00
8 pcs. Tee 1/2" dia. @ 25.00 200.00
4 pcs. PVC Pipe 1/2" dia.x 6m Sch.40 @ 365.00 1,460.00
1 pc. Gate Valve 1/2" dia. @ 350.00 350.00
2 pcs. Teflon 3/4" dia. @ 15.00 30.00
P 17,565.00
B. Labor

1 Foreman for 4.00 days @ 700.00 2,800.00


2 Plumber for 4.00 days @ 500.00 4,000.00
2 Laborers for 4.00 days @ 350.00 2,800.00
P 6,800.00

Item XI - Electrical Works


QTY= 1.00 unit

A. Materials

3 pcs. PVC Conduit 1 1/2" dia. @ 160.00 480.00


1 pc. Weather Cup for # 38.0mm2 THW @ 300.00 300.00
1 sets 60 Ampere Circuit Breaker 1 phase @ 2,000.00 2,000.00
220 volts 6 CKTS.2-15A,1-20A,3-30A -
1 roll THW Wire # 14.0mm2 @ 3,000.00 3,000.00
20 sets Pinlight # 6 18 watts @ 350.00 7,000.00
1 sets Flush Type Switch Single @ 126.00 126.00
2 sets Flush Type Switch Double @ 126.00 252.00
10 pcs. Utility Box 2 x 4" @ 22.00 220.00
1 rolls THW Wire # 5.5mm2 @ 6,600.00 6,600.00
3 rolls Electrical Tape Big @ 35.00 105.00
1 rolls Rubber Installation Tape Big @ 135.00 135.00
1 rolls Flexible Conduit 3/4" dia. @ 2,000.00 2,000.00
P 22,218.00
B. Labor

1 Foreman for 10.00 days @ 700.00 7,000.00


1 Electrician for 10.00 days @ 500.00 5,000.00
1 Laborers for 10.00 days @ 350.00 3,500.00
P 15,500.00
Item XII - Painting Works
Qty: 1,840.00 sq.m.

Proposed One Storey Building Page 4 of 5 ESTIMATE


A. Materials

15 gals. Gloss Latex Paint White @ 700.00 P 10,500.00


15 gals. Flat Latex Paint White @ 650.00 9,750.00
5 gals. Quick Dry Enamel Paint @ 700.00 3,500.00
5 gals. Flatwall Enamel Paint @ 650.00 3,250.00
3 gals. Paint Thinner @ 250.00 750.00
6 pcs. Paint Roller @ 250.00 1,500.00
6 pcs. Paint Brush 4" @ 70.00 420.00
4 pcs. Paint Brush 2" @ 35.00 140.00
10 cans. Tinting Color @ 110.00 1,100.00
P 30,910.00
B. Labor

2 Painter for 12.00 Days @ 500.00 P 12,000.00


2 Laborers for 12.00 Days @ 400.00 9,600.00
P 21,600.00

S U M M A R Y
MATERIALS P 345,798.00
LABOR 181,650.00
CONTINGENCIES 3,400.00
P 530,848.00

Prepared By:

Civil Engineer
PTR NO:
DATE ISSUED:
PLACE ISSUED
PRC NO:
TIN NO:

Proposed One Storey Building Page 5 of 5 ESTIMATE