0% found this document useful (0 votes)
8 views

Work Breakdown Structure

The document outlines a detailed work plan for a project, including tasks, target dates, and implementation dates from July to November 2022. It includes stakeholder engagement, hardware ordering, site visits, technical workshops, design document endorsements, and various installation and testing phases. The document also tracks the responsibility, status, and percentage completion of each task.

Uploaded by

Azizan Eyesoft
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Work Breakdown Structure

The document outlines a detailed work plan for a project, including tasks, target dates, and implementation dates from July to November 2022. It includes stakeholder engagement, hardware ordering, site visits, technical workshops, design document endorsements, and various installation and testing phases. The document also tracks the responsibility, status, and percentage completion of each task.

Uploaded by

Azizan Eyesoft
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

WORK PLANNING BREAKDOWN

Bil Task Target Date Implement Date


JULY
1 Stackholder Engagement Meeting 7/1/2022 7/1/2022
2 KickOff Meeting 7/5/2022 7/5/2022
3 Harware Ordering 7/5/2022 7/5/2022
4 Site Visit FG61-F 7/15/2022 7/13/2022
5 Technical Workshop FG61-F 7/20/2022 7/20/2022
6 Cabling Ordering FG61-F 7/25/2022 7/25/2022
AUGUST
7 Technical Design Document FG61-F 8/4/2022 8/4/2022
8 Technical Design Document Endorsement 8/30/2022
8/8/2022
8/24/2022
9 Site Visit FG101-F 24/8/2022
12/8/2022
8/26/2022
10 Technical Workshop FG101-F 26/8/2022
18/8/2022
8/30/2022
11 Technical Design Document FG101-F 30/8/2022
12 Cabling ordering FG101-F 8/30/2022 8/30/2022
SEPTEMBER
8/9/2022 22/9/2022
13 Test Plan & Strategy FG61-F 22/9/2022 31/10/2022
14 Test Plan & Strategy FG101-F 10/27/2022 11/3/2022
12/9/2022 29/9/2022
15 Discussion & Finalization Design Document (FG61-F) 7/10/2022 20/10/2022
16 Discussion & Finalization Design Document (FG101-F)
OCTOBER
17 DARAB Slide preparation (FG61-F) 11/3/2022 11/7/2022
18 DARAB Slide preparation (FG101F) 11/3/2022 11/7/2022
26/10/2022
19 DARAB Slide discussion & finalization (FG61-F) 31/10/2021 11/2/2022
20 DARAB Slide discussion & finalization (FG101F) 10/31/2021 11/2/2022
21 DARAB Slide presentation to HC (FG61-F&FG101F) 11/25/2022
TBD
22 Design Document Endorsement in DARAB
26/9/2022
10/6/2022
23 FG61-F Hardware Delivery 06/10/2022
28/9/2022
10/13/2022
24 Hardware Staging FG61-F 07/10/2022
25 Hardware Staging FG101-F 10/26/2022 10/26/2022
30/9/2022
10/13/2022
26 Cabling work & testing FG61-F (MRCC/SRCC) 13/10/2022
27 Cabling work & testing FG61-F (NERCC-PENANG) 10/17/2022 10/17/2022
28 Cabling work & testing FG101-F (COIT) 10/27/2022
29 Cabling work & testing FG101-F (NLDC) 10/28/2022
30 FG101-F Physical Installation (COIT) 10/27/2022
31 FG101-F Physical Installation (NLDC) 10/28/2022
30/9/2022
13/10/2022 10/31/2022
32 FG61-F Physical Installation (MRCC/SRCC) 28/10/2022
NOVEMBER
3/10/2022
14/10/2022 11/4/2022
33 FG61-F Physical Installation (NERCC-PENANG) 4/11/2022
34 Testing & Commisioning
35 CSRA
36 VA (MRCC/SRCC) FG61-F
37 VA (NERCC-PENANG) FG61-F
38 VA (COIT-BANGI) FG101-F
39 VA (NLDC-BANGSAR) FG101-F
40 UAT
41 CAB
42 Go Live
43 Project Handover FG61-F
44 Project Handover FG101-F
45 Project Closure
Responsibility Status Remark
JULY
IMPIANMNI/TNB DONE
IMPIANMNI/TNB DONE
IMPIANMNI DONE
IMPIANMNI/TNB DONE
IMPIANMNI/TNB DONE
IMPIANMNI DONE
AUGUST
IMPIANMNI DONE
IMPIANMNI/TNB PLAN Dependency On DARAB Approval
IMPIANMNI DONE

IMPIANMNI/TNB DONE

IMPIANMNI DONE

IMPIANMNI DONE
PTEMBER
TNB DONE

TNB DONE

IMPIANMNI/TNB DONE
Pending approval
IMPIANMNI/TNB DONE
OCTOBER
IMPIANMNI DONE
IMPIANMNI DONE

IMPIANMNI/TNB DONE

IMPIANMNI/TNB DONE
TNB PLAN

TNB PLAN
Design Doc to be present in CS high council for DARAB
IMPIANMNI/TNB DONE
In House (IMPIANMNI)
IMPIANMNI DONE
in House (IMPIANMNI)
IMPIANMNI DONE in House (IMPIANMNI)
IMPIANMNI/TNB DONE

IMPIANMNI/TNB DONE
IMPIANMNI/TNB PLAN POSTPONE DUE TO PIC NOT AVAILABLE
IMPIANMNI/TNB PLAN POSTPONE DUE TO PIC NOT AVAILABLE
PLAN No Rack Space (Downtime)
PLAN No Rack Space (Downtime)

IMPIANMNI/TNB DONE

OVEMBER

IMPIANMNI/TNB DONE
Percentage Completion

100%

83%

100%

63%
Downtime
Downtime

7.6%
Bil Task Julai August September
Week 1 2 3 4 1 2 3 4 1 2 3 4
1 Stackholder Engagement Meeting
2 KickOff Meeting
3 Harware Ordering
4 Site Visit FG61-F
5 Technical Workshop FG61-F
6 Cabling Ordering FG61-F
7 Technical Design Document FG61-F
8 Technical Design Document Endorsement
9 Site Visit FG101-F
10 Technical Workshop FG101-F
11 Technical Design Document FG101-F
12 Cabling ordering FG101-F
13 Test Plan & Strategy FG61-F
14 Test Plan & Strategy FG101-F
15 Discussion & Finalization Design Document (FG61-F)
16 Discussion & Finalization Design Document (FG101-F)
17 DARAB Slide preparation (FG61-F)
18 DARAB Slide preparation (FG101F)
19 DARAB Slide discussion & finalization (FG61-F)
20 DARAB Slide discussion & finalization (FG101F)
21 DARAB Slide presentation to HC (FG61-F&FG101F)
22 Design Document Endorsement in DARAB
23 Hardware Delivery
24 Hardware Staging FG61-F
25 Hardware Staging FG101-F
26 Cabling work & testing FG61-F (MRCC/SRCC)
27 Cabling work & testing FG61-F (NERCC-PENANG)
28 Cabling work & testing FG101-F (COIT)
29 Cabling work & testing FG101-F (NLDC)
30 FG101-F Physical Installation (COIT)
31 FG101-F Physical Installation (NLDC)
32 FG61-F Physical Installation (MRCC/SRCC)
33 FG61-F Physical Installation (NERCC-PENANG)
34 Testing & Commisioning
35 CSRA
36 VA (MRCC/SRCC) FG61-F
37 VA (NERCC-PENANG) FG61-F
38 VA (COIT-BANGI) FG101-F
39 VA (NLDC-BANGSAR) FG101-F
40 UAT FG61-F
41 CAB
42 Go Live FG61-F
43 Project Handover FG61-F
44 Project Handover FG101-F (2023)
45 Project Closure
October November