Work Breakdown Structure
Work Breakdown Structure
IMPIANMNI/TNB DONE
IMPIANMNI DONE
IMPIANMNI DONE
PTEMBER
TNB DONE
TNB DONE
IMPIANMNI/TNB DONE
Pending approval
IMPIANMNI/TNB DONE
OCTOBER
IMPIANMNI DONE
IMPIANMNI DONE
IMPIANMNI/TNB DONE
IMPIANMNI/TNB DONE
TNB PLAN
TNB PLAN
Design Doc to be present in CS high council for DARAB
IMPIANMNI/TNB DONE
In House (IMPIANMNI)
IMPIANMNI DONE
in House (IMPIANMNI)
IMPIANMNI DONE in House (IMPIANMNI)
IMPIANMNI/TNB DONE
IMPIANMNI/TNB DONE
IMPIANMNI/TNB PLAN POSTPONE DUE TO PIC NOT AVAILABLE
IMPIANMNI/TNB PLAN POSTPONE DUE TO PIC NOT AVAILABLE
PLAN No Rack Space (Downtime)
PLAN No Rack Space (Downtime)
IMPIANMNI/TNB DONE
OVEMBER
IMPIANMNI/TNB DONE
Percentage Completion
100%
83%
100%
63%
Downtime
Downtime
7.6%
Bil Task Julai August September
Week 1 2 3 4 1 2 3 4 1 2 3 4
1 Stackholder Engagement Meeting
2 KickOff Meeting
3 Harware Ordering
4 Site Visit FG61-F
5 Technical Workshop FG61-F
6 Cabling Ordering FG61-F
7 Technical Design Document FG61-F
8 Technical Design Document Endorsement
9 Site Visit FG101-F
10 Technical Workshop FG101-F
11 Technical Design Document FG101-F
12 Cabling ordering FG101-F
13 Test Plan & Strategy FG61-F
14 Test Plan & Strategy FG101-F
15 Discussion & Finalization Design Document (FG61-F)
16 Discussion & Finalization Design Document (FG101-F)
17 DARAB Slide preparation (FG61-F)
18 DARAB Slide preparation (FG101F)
19 DARAB Slide discussion & finalization (FG61-F)
20 DARAB Slide discussion & finalization (FG101F)
21 DARAB Slide presentation to HC (FG61-F&FG101F)
22 Design Document Endorsement in DARAB
23 Hardware Delivery
24 Hardware Staging FG61-F
25 Hardware Staging FG101-F
26 Cabling work & testing FG61-F (MRCC/SRCC)
27 Cabling work & testing FG61-F (NERCC-PENANG)
28 Cabling work & testing FG101-F (COIT)
29 Cabling work & testing FG101-F (NLDC)
30 FG101-F Physical Installation (COIT)
31 FG101-F Physical Installation (NLDC)
32 FG61-F Physical Installation (MRCC/SRCC)
33 FG61-F Physical Installation (NERCC-PENANG)
34 Testing & Commisioning
35 CSRA
36 VA (MRCC/SRCC) FG61-F
37 VA (NERCC-PENANG) FG61-F
38 VA (COIT-BANGI) FG101-F
39 VA (NLDC-BANGSAR) FG101-F
40 UAT FG61-F
41 CAB
42 Go Live FG61-F
43 Project Handover FG61-F
44 Project Handover FG101-F (2023)
45 Project Closure
October November
1 2 3 4 1 2 3 4