0% found this document useful (0 votes)
30 views3 pages

2500203-55010160-FBQ-Al Yamamah Company-ASWARI Project NCR#06

The water has been filtered and is now clean. Workers are scheduled to meet with HR for 30 minutes to an hour while waiting for transportation, with rest shelters available. There was a previous non-compliance issue regarding the failure to filter water before pumping it into the sea.

Uploaded by

mohamed emad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views3 pages

2500203-55010160-FBQ-Al Yamamah Company-ASWARI Project NCR#06

The water has been filtered and is now clean. Workers are scheduled to meet with HR for 30 minutes to an hour while waiting for transportation, with rest shelters available. There was a previous non-compliance issue regarding the failure to filter water before pumping it into the sea.

Uploaded by

mohamed emad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

The water is now filtered and clean.

"
"Workers are coming to the office to meet with HR for 30 minutes to an hour. They are waiting for transportation,
and rest shelters are available at the site And one rest area at HR Office.
Before
Observation Pictures:

1-Non-compliance with Approved HSE Procedures: The contractor failed to filter the water before pumping it into the
sea

2-Non-compliance with Approved HSE Procedures


After

You might also like