The document outlines the design specifications for an urban house constructed with cement blocks, covering an area of 140.58m² and featuring 3 bedrooms, a lounge, kitchen, shared bathroom, and WC. It includes detailed notes on structural stability, dimensions, and materials, along with elevation and floor plans. The project is overseen by the Malawi Government's Ministry of Lands and includes specific guidelines for contractors regarding site checks and discrepancies.

Uploaded by

Wana O'Neill
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views15 pages

Ministry of Lands Urban Prototypes-1

The document outlines the design specifications for an urban house constructed with cement blocks, covering an area of 140.58m² and featuring 3 bedrooms, a lounge, kitchen, shared bathroom, and WC. It includes detailed notes on structural stability, dimensions, and materials, along with elevation and floor plans. The project is overseen by the Malawi Government's Ministry of Lands and includes specific guidelines for contractors regarding site checks and discrepancies.

Uploaded by

Wana O'Neill
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

NOTES

N
150 1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
1600 3500 1000 1500 1200 4000 DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.
300 150
300 150 150 150 150 150 150 NW NE
2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND
1000 400 1500 1600 700 700 2000 1300 2000 700 EFFICIENT PERFORMANCE OF HIS/HER WORK.

300 150 W E
1850

150
A
SW SE
300
400
150

1000
1553
W2b W1
1500

W4

MASTER BEDROOM
2000

MASTER
4100

900

BATH
W4 W4
1300

1800

VERANDA
5350
2350

SHARED
1547
W1

150
D4
KITCHEN WC
900

BATH
400

335
150

2350
D4

150
11550

1000

1200

900
D2 D4

115
D3

150
W3 CORRIDOR D3
4000

3000

3000
D3 D3

4000
LOUNGE
5150
150

BEDROOM 2

1000
D1

150
1800

2250

W1
300

1000
W3
BEDROOM 1

150
VERANDA
150
300

500 2000 500 1500 1250 1500 1250 1250 1500 1250 W2a
150 150 150 150
W3
4500 4000 4000
300
300 13700 W2a

FLOOR PLAN
SCALE:1/100 FLOOR PLAN A
SCALE:1/100

URBAN HOUSE DESIGN OF CEMENT BLOCKS No. DESCRIPTION BY DATE

· House is of 140.58m² Area REVISIONS


· 3 bedrooms with 1 ensuite
· Lounge, Kitchen, shared bathroom, and WC
· Corridor with a back exit door MALAWI GOVERNMENT
MINISTRY OF LANDS

· 1 Front Veranda and another at the back WESTERN ELEVATION


SCALE:1/125
SOUTHERN ELEVATION
PRIVATE BAG 311
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

· 1 back door positioned at the Lounge PROJECT TITLE

· IBR design gable roof with rafters for framing. Roof pitch PROPOSED URBAN AND RURAL HOUSE DESIGNS

set at 10°
Minimum housing surrounding area to be of
CLIENT

· SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
25x30meters plot = 750m² PRIVATE BAG 311
LILONGWE 3
MALAWI

DRAWING NAME

PROTOTYPE 1-3 BEDROOM,LOUNGE


&KITCHEN

ELEVATIONS & PLAN


DRAWN DATE SCALE
W. KACHIKOPA JUNE,2023 1/50

NORTHERN ELEVATION EASTERN ELEVATION


PROJECT ARCHITECT PROJECT NUMBER
W. KACHIKOPA

SCALE:1/125 DRAWING NUMBER HFHM/MWD/2023/01-01


ROOF
Gable roof design of 10° pitch set on S/W timber NOTES
trusses of 150x50mm, and purlins of 75x50mm. roof
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
coverage to be of IBR sheets 28gauge size ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
76 76
6321
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.
6321 812 660 914
914 914 2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND
ROOF 914 914 EFFICIENT PERFORMANCE OF HIS/HER WORK.
914 150 914
Gable roof design of 10° pitch set on S/W timber 102 914 914 102
838

1232
Purlin
trusses of 150x50mm, and purlins of 75x50mm. roof 838 914

15

200
200

10°
0
coverage to be of IBR sheets 28gauge size

0
15
Truss
500

657

657
TRUSS 1 X 8# 500

200
1332
1x8" sawn and
868

868
plained s/w 50x75mm s/w 11150

200
200

200
timber fascia wall plate timber
board 150 ROOF 150
150x200mm
reinforced concrete Gable roof design of 10° pitch set on S/W timber

4966
ring beam trusses of 150x50mm, and purlins of 75x50mm. roof

1400 700
6mm galvanized wire

1000
hooked in ring beam
76 76 coverage to be of IBR sheets 28gauge size
reinforcement and tied 4646 6321
on a double knot.
812 660
2100

914 914
914 914
100mm thick 102 914 150 914

1100
914 914 102
1:3:6 Conc. slab 914

1232
100
914
100

443

15
500micron
200

200
10°
0
DPM

200

0
200

15
200
1200

500

657

657
150
TRUSS 2 X 3# 500

200
150

600
200
200

100mm thick
custom design foul selected earth fill 150
drainage bedded on
hard core filling 9500
clay burnt bricks, ROOF

150
with reinforced FOUNDATION 150 150
concrete covers Gable roof design of 10° pitch set on S/W timber
150mm thick 1:3:6
throughout. trusses of 150x50mm, and purlins of 75x50mm. roof
450 1:3:6 Concrete Strip foundation of 150x450mm, with Mass Conc. footing
coverage to be of IBR sheets 28gauge size
excavation depth of 750mm, and fdn. wall built of
76 76 3173
1200mm to underneath of slab. 1:4 mortar mix ratio.
Foundational blocks surfacing plastered 15mm thick 1:4
mortar and painted bituminous black paint
CROSS SECTION VIEW A-A 6321
914
914
914
812
150
660 914
914 609
914

29
102 838

16
838

200
0

10°

542
15 15
0
500

657

657
TRUSS 3 X 1# 500

200
9018
150 150
14100
2000 1500 1500 1000 700

100
700 1200 1200 1200 1200 1200 12008245 1200
6345 1200 1200 700
50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

900
500 800 500 500 300 500 500 300 500 425 425 600
50

50

50

50

50 50 50
50 50
300 300

250 300
380 380 380

380 380 380


50

50

900
150x50mm S/W 75X50mm
700
trusses with king post S/W Purlin
900
50

50
1500

1600

1500

1500

1600

900
50
50

50

200

900
1400

75X50mm
50

50

50
1100

S/W Purlin
210

210

900
500

500

500

W1 W2a W2b W3 W4
T2
T3

900
10°
T2

100
625
No. REQUIRED: 3 No. REQUIRED: 2 No. REQUIRED: 2 No. REQUIRED: 3 No. REQUIRED: 3

LOCATION: Lounge & Master bedroom LOCATION: Bedrooms 1 and 2 LOCATION: Kitchen LOCATION: Lounge, Bedrooms 1&2 LOCATION: Master bath, WC, Shared bath
FRAMES: Purpose made steel FRAMES: Purpose made steel 50x50mm FRAMES: Purpose made steel 50x50mm FRAMES: Purpose made steel 50x50mm square tube FRAMES: Purpose made steel 50x50mm

625
100
50x50mm square tube square tube frames dimensions square tube frames dimensions frames dimensions as shown square tube frames

GLASS:
frames dimensions as shown
5mm mild-tint glass GLASS:
as shown
5mm mild-tint glass GLASS:
as shown
5mm mild-tint glass
GLASS: 5mm mild-tint glass
IRONMONGERY: Standard brass handles & stays GLASS:
dimensions as shown
5mm mild-tint glass T1 T1 150x50mm S/W

900
IRONMONGERY: Standard brass handles and IRONMONGERY: Standard brass handles & stays IRONMONGERY: Standard brass handles & stays FINISH: Frames painted 3coats gloss enamel in IRONMONGERY: Standard brass handles & stays
stays FINISH: Frames painted 3coats gloss FINISH: Frames painted 3coats gloss approved color FINISH: Frames painted 3coats gloss trusses with king post
FINISH: Frames painted 3coats gloss
enamel in approved color CILLS:
enamel in approved color
Internal Conc. window cill CILLS:
enamel in approved color
Internal Conc. window cill
CILLS: Internal Conc. window cill covered with
150x50mm thick HW/glulam blugum stool CILLS:
enamel in approved color
Internal Conc. window cill T1

900
CILLS: Internal Conc. window cill covered with 150x50mm thick covered with 150x50mm thick with 2coats polyurethane vanish, Apron & covered with 150x50mm thick
covered with 150x50mm HW/glulam blugum stool with HW/glulam blugum stool with trim with laminated blugum. HW/glulam blugum stool with 150x50mm S/W
thick HW/glulam blugum
stool with 2coats
2coats polyurethane vanish,
Apron & trim with laminated
2coats polyurethane vanish,
Apron & trim with laminated
2coats polyurethane vanish,
Apron & trim with laminated
trusses with king post
T1 T1

900
polyurethane vanish, Apron & blugum. blugum. blugum. 75X50mm
trim with laminated blugum. 900 S/W Purlin

1500 900
30
20 20 30
900
T2 No. BY DATE

900
30 30 800 30
DESCRIPTION
30 20

T1 T1 T1
20 30

20 20 30 20 20 30 20 20 30
1400 800 800

900
300
30

30

30

400
REVISIONS

100
30
20

20

20

20

9950 4150
2500
2100

2100

2100
2050

2050

2050

2050

10°
MALAWI GOVERNMENT
MINISTRY OF LANDS
PRIVATE BAG 311
LILONGWE 3.
D1 D2 D3 D4 10° Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

No. REQUIRED: 1 No. REQUIRED: 1 No. REQUIRED: 4 No. REQUIRED: 3


PROJECT TITLE
LOCATION: Lounge LOCATION: Kitchen LOCATION: Bedroom 1& 2, Kitchen LOCATION: Shared bath, WC, Master bath
FRAMES: Pressed steel door frame FRAMES: Pressed steel frames Master bedroom FRAMES: Pressed steel frames
DOORS: Customised treated Hardwood DOORS: Customised treated Hardwood DOORS: MDF Semi solid core interior PROPOSED URBAN AND RURAL HOUSE DESIGNS
door door FRAMES: Pressed steel frames quality flush Door
FINISH: Varnished 2coates with clear IRONMONGERY: 3 Lever "SABS UNION" DOORS: MDF Semi solid core interior IRONMONGERY: 3 Lever "SABS UNION"
glass vanish Mortise Locks 1 pair 125mm quality flush Door Mortise Locks 1 pair 125mm
IRONMONGERY: ISEO swing dead lock with roller narrow butt hinges fixed with IRONMONGERY: 3 Lever "SABS UNION" narrow butt hinges fixed with
catch, type HA5027 and Kafli 9No. 40mm brass counter Mortise Locks 1 pair 125mm 9No. 40mm brass counter
lever handle (HA605Z) sunk screws narrow butt hinges fixed with sunk screws
CLIENT
FINISH: Varnished 2 coats with clear 9No. 40mm brass counter FINISH: Floor mounted door stoppers
Standard brass handles & stays gloss varnish Floor mounted sunk screws
door stoppers FINISH: Floor mounted door stoppers SECRETARY FOR LANDS,HOUSING AND URBAN
HINGES: As per supplier + door stoppers DEVELOPMENT
PRIVATE BAG 311
LILONGWE 3
MALAWI

DRAWING NAME

PROTOTYPE 1- 3 BEDROOMS,LOUNGE & KITCHEN

SECTION, ROOF,SCHEDULES & TRUSSES

DRAWN DATE SCALE


10° W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/01-02


12350 NOTES
1300 1200 2975 1200 775 1940 2960 1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
150 150 150 150 150 150 MATERIALS ARE ORDERED OR WORK PUT IN HAND.

3500 3500 1000 1000 2450 2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND

X EFFICIENT PERFORMANCE OF HIS/HER WORK.

230 230
3340

241
230
230

230

230
3800

1500
KHONDE
1270

1270

1270

1270

1270
150 150
W1 W1
T4

650
150

500
W2

400
W2 W2
1125

D1

2000

1100

600 650 600


1350
DINING BATH W2

3000

150
1200

W1
KITCHEN 2
1250 1200
D2BATH

1100
D2

1000
W2
D2
330

150
150
2629
11450

11450
D2

1200
D2

2050
7650

T1
150
T2
D2
4500

4500
BEDROOM 2
1196

1200
W1
LOUNGE BEDROOM W1
3150
1800

1800
D1

150
150

W1 W1 W1
T3
1770

1770

1770

1770

1770
KHONDE
2000

230

230
230

230

FLOOR PLAN
0

4340
SCALE :100 FLOOR PLAN
SCALE :100

230 230

X
4500 3750 3500
150
150 150 150
1300 1200 1100 900 1575 1200 2575 1200 1300
12350 4800

TRUSS 2 TRUSS 3 TRUSS 4

1500

2100
3650 No. DESCRIPTION BY DATE
4900

URBAN HOUSE PLAN OF EITHER SSB OR CEMENT BLOCKS REVISIONS

· House is of 110.30m² Area MALAWI GOVERNMENT


MINISTRY OF LANDS
PRIVATE BAG 311

· 2 bedrooms LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

8350
Open floor plan - Lounge,Dining, and Kitchen
PROJECT TITLE

·
10950

PROPOSED URBAN AND RURAL HOUSE DESIGNS

· Shared full bathroom CLIENT

· IBR design hip roof of pitch set at 25° SECRETARY FOR LANDS,HOUSING AND URBAN
DEVELOPMENT
PRIVATE BAG 311

Minimum housing surrounding area to be of


LILONGWE 3

· MALAWI

DRAWING NAME

30x30meters plot = 900m² 7550 PROTOTYPE 2-2 ROOMS, LOUNGE & KITCHEN

2000
PLAN & ROOF

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50

5800 PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA
SCALE :150

DRAWING NUMBER HFHM/MWD/2023/02-01


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND


EFFICIENT PERFORMANCE OF HIS/HER WORK.

6420
230 230 230 230

230
2500 2000

Ø1

40
1000
230

23
20
00

0
0
30

0
2000
1000

1540
230

230

0
40
115
Aerial view of Manhole, Septic tank, and soka-way 230
pipe and alignment, plus dimension.
All walls of 230mm thickness

100
100

100
500gge polythene sheeting

20
SCALE :125

400
ELEVATION 1 ELEVATION 2

230 1000
Hard core filling FOUNDATION
230 SCALE :125

720
6420 230 Concrete Strip foundation of 1350mm, with excavation
70 70 70 70 70 70 depth of 1000mm and 700mm as min for fence
foundation trench excavation, 1:3:6 mortar mix ratio.
910
275 910 910 1601340 160 690 Foundational bricks surfacing plastered and painted

150
150

1070 1570 775 1200 bituminous black paint


80

70 70
70
300

615 615 275 910 275


110

150
Ø110

115 115 865 865


800
840

80
900 70
250

1310
110

522
110
1000

1000 1000
3000

300
300

1530

268
110 110
300 1460
1500

1390

230 230 230 MANHOLE


2500 2000
300

300

Manhole laid with bricks, and


Interior finished with plaster of
5790 2260 mortar mix ratio of 1:2:4. Concrete
SEPTIC TANK SOKA-WAY footing of concrete mix of 1:3:6 ratio
Septic tank laid with bricks, and Soka-way laid with natural
Interior finished with plaster of
mortar mix ratio of 1:2:4.
border stones, and base with
concrete mix ratio of 1:3:6
ELEVATION 3 ELEVATION 4
Concrete footing of 1:3:6 ratio

9
457
1935
19
14
25°

8300

TRUSS 1 1200 600 30


900
20 20
800
30 30
900
20 20
800
30

30

30
SCALE :125
600

20

20
1000

2 800
466
0 800
1970

800
320 264
8
18

800
2100

2100
800 800
1352

10
9

2050

2050
13

1119
2

79
800
04
25°

25° 25°
88

527
1500

No. DESCRIPTION BY DATE


4

1100

800 800
2900 800 800

25°
4225 2400

TRUSS 2 TRUSS 3 TRUSS 4 SCALE :100 Window 1 Window 2 Door 1


No. REQUIRED: 2
Door 2
No. REQUIRED: 4
REVISIONS

974
No. REQUIRED: 8 No. REQUIRED: 5

150

150

5368
LOCATION: LOUNGE & BEDROOMS LOCATION: LOUNGE, BEDROOMS, LOCATION: LOUNGE & STORES LOCATION: BEDROOM 1 , 2, 3, & STORES
FRAMES: Purpose made steel and STORES
6glass window with FRAMES: Purpose made steel FRAMES: Purpose made pressed FRAMES: Purpose made pressed
Transom in the middle 3glass window steel frames 1mm thick steel frames

1000
with a top casement DOORS: Purpose made treated DOORS: Core flash door

3072
Dimensions as shown

URBAN HOUSE PLAN OF EITHER SSB OR CEMENT BLOCKS


opening. Dimensions GLASS: 4mm clear glass set H/W door
as shown with silicone and FINISH: Varnished 2coates with FINISH: Painted pink primer and
GLASS: 4mm clear glass set clear glass vanish finihsed with mist grey

2100

2100
finished with putty
with silicone and IRONMONGERY: Standard brass stoppers IRONMONGERY: SABS 3-lever mortice IRONMONGERY: SABS 3-lever mortice lock MALAWI GOVERNMENT
finished with putty handles and stays lock MINISTRY OF LANDS
IRONMONGERY: Standard brass stoppers FINISH: Industrial prefabricated IRONMONGERY

1100
IRONMONGERY HINGES: As per supplied by supplier PRIVATE BAG 311
handles and stays finish (red oxide). then
FINISH: Industrial prefabricated pained gloss white HINGES: As per supplied by LILONGWE 3.

100
finish (red oxide). then supplier Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

· House is of 110.30m² Area painted gloss white

PROJECT TITLE

2 bedrooms

990
·

150
PROPOSED URBAN AND RURAL HOUSE DESIGNS

· Open floor plan - Lounge,Dining, and Kitchen SECTION X-X CLIENT

· Shared full bathroom SCALE :100


SECRETARY FOR LANDS,HOUSING AND URBAN
DEVELOPMENT

· IBR design hip roof of pitch set at 25° PRIVATE BAG 311
LILONGWE 3
MALAWI

· Minimum housing surrounding area to be of DRAWING NAME


PROTOTYPE 2-TWO ROOMS PLUS LOUNGE AND
KITCHEN
30x30meters plot = 900m² SECTION,ELEVATIONS,SCHEDULES,TRUSSES & SEPTIC
TANK DETAILS
DRAWN DATE SCALE
W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/02-02


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

0
00
2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND

Ø1
EFFICIENT PERFORMANCE OF HIS/HER WORK.
4940

30
230 230 230 230

0
230
740 1310 1000
SOAKAWAY

740
MH

230

1540
SEPTIC TANK 230

2970
230
300 300 740

300
300
3960

300
300
300

740
MH

230
1600
230 230 230 115
VERANDA

1000
250 230
500 1000 500 1500 850 500 3000 500 3500

230
W5 W4 D1 W1

230

1129
1300
MASTER
BATH

3000
& KITCHEN
WC D2 DINNING

2000
BEDROOM 2 W3

4430
800
D2

115
1100

230
150
N

1129
1430

1200
185
D2 CORRIDOR D2

115
2415

150

450
115

400
13205
E W BATH

1000
D2 & W5

450
WC 5345

115
400
3000
W2
MASTER BEDROOM LOUNGE

4115
2415
D2 185

1129
S

1000
D1

230
W3

2000
BEDROOM 2
W1 230 4500 115 665 3000 665

1770
2000
VERANDA

1129

230
230
5745

300

300
300
300 300 3500
FLOOR PLAN FLOOR PLAN FLOOR PLAN 230 230
SCALE 1: 175 1500
14035

ROOF PLAN

URBAN SSB / CEMENT BLOCK HOUSE PLAN

· House is of 152.73m² Area


· 3 bedrooms with single, 1 self-contained
No. BY DATE
Open floor plan of Dining, Lounge, and Kitchen
DESCRIPTION
· SIDE VIEW ELEVATION (W) BACK VIEW ELEVATION (N)
REVISIONS
· IBR design hip roof set at 26° pitch
SCALE 1: 175

· Minimum housing surrounding area to be of MALAWI GOVERNMENT

30x30meters plot = 900m² MINISTRY OF LANDS


PRIVATE BAG 311
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

PROJECT TITLE

PROPOSED URBAN AND RURAL HOUSE DESIGNS

CLIENT

SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
PRIVATE BAG 311
LILONGWE 3
MALAWI

DRAWING NAME

PROTOTYPE 3- 3 BEDROOMS PLUS LOUNGE AND


DINING

PLAN & ELEVATIONS


DRAWN DATE SCALE
W. KACHIKOPA JUNE,2023 1/50

SIDE VIEW ELEVATION (E) FRONT VIEW ELEVATION (S) PROJECT ARCHITECT PROJECT NUMBER
W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/03-01


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR

200
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.
ROOF
2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND
26 gage gavanised pre-painted IBR EFFICIENT PERFORMANCE OF HIS/HER WORK.

925
sheets, Ridge, and galleys.
200 Pitch set at 26°

200
925 925
716
T3 925
925 561
925 8

2359
200
925

0
925
200925

20
26°

200
200
1200

1200
T1 500

230

230
25
8638
215 215
T1 T1 925
925

752
925

925 380
684 200 4
925

1564
925 281
1 200925
200925

1129
1200

200
1200
26°

200
26°

200
T2 T3 500 T2 500

230

230
230

230
25
925 25 5378
3593
925
T3 215 215
215 215
1200
925

1200

1200
925
200

TRUSS PLAN
SCALE :1/100
200
200

230 230
230

740
230
230 230
740

A42 Mesh wire


230

1310 1000
150
150

100
75

20

230
400

1200
740
230

230 1000

1500

1500

1500
FOUNDATION 900
230
2000
1540

720

230
00

Concrete Strip foundation of 950mm, and


740

R5

1000
230

580mm as min for fence foundation trench 3000 1500


690 excavation, 1:3:6 mortar mix ratio. 2000

2000
30

1800
Foundational bricks surfacing plastered and

1500

1500

1500
0

Aerial view of Manhole, Septic tank, and soka-way painted bituminous black paint
3000

1000
No. DESCRIPTION BY DATE
pipe and alignment, plus dimension.
All walls of 230mm thickness
160 360 475 275 230 230 W1 SCALE 1: 175 W2 W3 W4 W5 D1 REVISIONS
No. REQUIRED: 2 No. REQUIRED: 1 No. REQUIRED: 2 No. REQUIRED: 1 No. REQUIRED: 2 No. REQUIRED: 2
150

880 910 910 1140


150

MANHOLE LOCATION: Lounge, and Dinning LOCATION: Master Bedroom LOCATION: Bedrooms 1&2 LOCATION: Kitchen LOCATION: Master bath LOCATION: Lounge and
FRAMES: Purpose made & Common bath Kitchen
FRAMES: Purpose made steel frames dimensions FRAMES: Purpose made steel frames dimensions FRAMES: Purpose made steel frames steel frames FRAMES: Purpose made
Manhole laid with bricks, and 230 GLASS:
as shown
4mm clear GLASS:
as shown
4mm clear GLASS:
dimensions as shown
4mm clear
dimensions as
shown
steel framesdim
as shown
FRAMES: Purpose
made treated
Interior finished with plaster of 300 SOKA-WAY
IRONMONGERY: Standard brass handles and stays
FINISH: Frames painted 3coats gloss enamel in
IRONMONGERY: Standard brass handles and stays
FINISH: Frames painted 3coats gloss enamel in
IRONMONGERY: Standard brass handles and
stays
GLASS: 4mm clear
IRONMONGERY: Standard brass
GLASS: 4mm clear glass
for top panel DOORS:
H/W frames
Purpose
mortar mix ratio of 1:2:4. Concrete 740 CILLS:
approved color
Internal Conc. window cill covered with CILLS:
approved color
Internal Conc. window cill covered with
FINISH: Frames painted 3coats
gloss enamel in approved
handles and
stays
6mm obscure
glass for mid &
made treated
H/W doors MALAWI GOVERNMENT
footing of concrete mix of 1:3:6 ratio Soka-way laid with natural
150x50mm thick HW/glulam bluegum 150x50mm thick HW/glulam bluegum color FINISH: Frames painted bottom panel FINISH: Varnished
MINISTRY OF LANDS
1270 110 110
stool with 2coats polyurethane vanish,
Apron and trim with laminated bluegum.
stool with 2coats polyurethane vanish,
Apron and trim with laminated bluegum.
CILLS: Internal Conc. window cill
covered with 150x50mm
3coats gloss
enamel in
IRONMONGERY: Standard brass
handles & stays
2coates with
clear glass PRIVATE BAG 311
border stones, and base with thick HW/glulam bluegum approved color FINISH: Frames painted vanish LILONGWE 3.
3000

3000

stool with 2coats CILLS: Internal Conc. 3coats gloss IRONMONGERY: ISEO Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]
concrete mix ratio of 1:3:6 polyurethane vanish, Apron
and trim with laminated
window cill enamel in swing
dead
covered with approved color
SEPTIC TANK bluegum. 150x50mm CILLS: Internal Conc. lock PROJECT TITLE
300 300 thick HW/glulam window cill with
roller catch,
230 230 230 bluegum stool
with 2coats
covered with
150x50mm type HA5027 PROPOSED URBAN AND RURAL HOUSE DESIGNS
Septic tank laid with bricks, and polyurethane
vanish,Apron
thick HW/glulam
bluegum stool
and Kafli
lever handle
Interior finished with plaster of 300 1310 1000 1000 and trim with
laminated
with 2coats
polyurethane
(HA605Z)
300

300

mortar mix ratio of 1:2:4.


Concrete footing of 1:3:6 ratio 2200
DOOR AND WINDOW SCHEDULE
SCALE :1/100
bluegum. vanish, Apron
&trim with
laminated
bluegum.
IRONMONGERY
HINGES: As per
supplied by supplier CLIENT

3600 SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
PRIVATE BAG 311
LILONGWE 3
MALAWI

DRAWING NAME

PROTOTYPE 3- 3 BEDROOMS PLUS LOUNGE AND


DINING

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/03-02


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

500 4160 500


2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND
EFFICIENT PERFORMANCE OF HIS/HER WORK.

x 3700
230 230
1500 900 1300

230
500

230

1300
1470
STORES STORES

115
KITCHEN

KITCHEN

3000
4460

900
400 600 400
1400
BATH BATH

800
115

230
900

700
VERANDA VERANDA

300
230
500
1670 1500

WEST ELEVATION SOUTH ELEVATION x FLOOR PLAN


SCALE
1590
1130
230
900

230
2270
1670

300
4160

WEST ELEVATION SOUTH ELEVATION

RURAL KITCHEN AND BATHROOM OF SSB OR BURNT BRICKS

· Unit is of 18.55m² Area


· 1 kitchen, plus stores
· 1 bathroom No. DESCRIPTION BY DATE

· Kitchen with chimney REVISIONS


· IBR design gable roof of pitch set at 10.38°
· Minimum housing surrounding area to be of MALAWI GOVERNMENT

20x20meters plot = 400m²


MINISTRY OF LANDS
PRIVATE BAG 311
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

PROJECT TITLE

NORTH ELEVATION EAST ELEVATION


PROPOSED URBAN AND RURAL HOUSE DESIGNS

CLIENT

SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
PRIVATE BAG 311
LILONGWE 3
MALAWI

DRAWING NAME
PROTOTYPE 4- KITCHEN,STORES AND SHOWER

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/04-01


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND

900 600 EFFICIENT PERFORMANCE OF HIS/HER WORK.

22 22 22 22
900

278 317 317

700
1000

BATH
2100

STORES
417 417

x
22 22 22

W1 W2 D2
No. REQUIRED: 2 No. REQUIRED: 1 No. REQUIRED: 2

VERANDA
LOCATION: Kitchen and Stores LOCATION: Bathroom LOCATION: Kitchen & Bathroom
FRAMES: Purpose made steel frames FRAMES: Purpose made steel frames
dim as shown dim as shown FRAMES: Purpose made treated
GLASS: 4mm clear glass for top panel GLASS: 4mm clear glass for top panel H/W frames
6mm obscure glass for
bottom panel
IRONMONGERY: Standard brass handles & stays
6mm obscure glass for
bottom panel
IRONMONGERY: Standard brass handles & stays
DOORS:

FINISH:
Purpose made treated
H/W doors
Varnished 2coates with
KITCHEN
FINISH: Frames painted 3coats gloss FINISH: Frames painted 3coats gloss clear glass vanish
enamel in approved color enamel in approved color IRONMONGERY: ISEO swing dead
CILLS: Internal Conc. window cill CILLS: Internal Conc. window cill lock with roller catch, type
covered with 150x50mmthick covered with 150x50mmthick HA5027 and Kafli lever
HW/glulam bluegum stool HW/glulam bluegum stool handle (HA605Z)
with 2coats polyurethane with 2coats polyurethane
vanish, Apron &trim with vanish, Apron &trim with IRONMONGERY
laminated bluegum. laminated bluegum. HINGES: As per supplied by supplier

102 2775
102
742 742
5160 101 915 915 101
915 915
100

331
10.38°

1196
2679
900

150
150
1300

700

3281
900

No. DESCRIPTION BY DATE


730

REVISIONS
100

1550

1400

50
100

400
50
100

MALAWI GOVERNMENT
730

MINISTRY OF LANDS
PRIVATE BAG 311
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

1020
PROJECT TITLE
250
620

PROPOSED URBAN AND RURAL HOUSE DESIGNS


245
900

CLIENT

SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT

890 PRIVATE BAG 311


LILONGWE 3
MALAWI
900

DRAWING NAME
100

PROTOTYPE 4- KITCHEN,STORES AND SHOWER

780 1200 1200 1200 780 CROSS SECTION X-X DRAWN


W. KACHIKOPA

PROJECT ARCHITECT
W. KACHIKOPA

DRAWING NUMBER
DATE
JUNE,2023
SCALE

PROJECT NUMBER
1/50

HFHM/MWD/2023/04-02
ROOF NOTES
6
6 37180
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK

250
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR

9 28 gauge galvanised pre-painted IBR sheets, DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE

569
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

Gable roof coverage set at 20° pitch with 500mm


958
2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND

overhang, resting on 2x3" (75mm) s/w purlins set EFFICIENT PERFORMANCE OF HIS/HER WORK.

958 at 958mm c/c treated with solignum.


7
111 649
7 22550
11160 11160
958 2x3" S/W purlins 2x6" S/W rafters
958
4000 1900 1000 3570 3570 1000 1900 4000

3222
115 230 257 115
230 115 257 230 230 115 230
106 58 1250 1500 1250 1300 600 600 900 585 1500 585 585 1500 585 900 600 600 1300 1250 1500 1250

230
143 143

230
9

300 300 300 300300

70 50 50 50
250

1399

1120
1570
1885

1885
2770
2885

2885
200

5897

1000

1000
115
115

3000
1250

1250
5315
1500
3675

11510
4000

4000
1500

1500
2000
M20grade, 75mm

1250

1250
thick Non-reinforced

4000

115
230
115

230
concrete slab

600
100

75

1000

1000
200

200
600 500

2885

2885
200

50 50 50 50 50 50
100mm thick
1200

1770

1770
hardcore

300 300 300 300 300 300

230
230
230

Selected earth fill


material /gravel

750

750
1000 585 1250 1500 1250 900 878 2000 877 878 2000 878 900 1250 1500 1250 585 1000

690 3540 690 2540 690 1:3:6 mass concrete


footing of 450x 150mm
230 230
4500
230
1200
230
5000
230
5000
230 230
1200 4500
230 230

FOUNDATION 115 115 115 115


50mm thick 4000 4885 4885 4000
Sandblinding
1:3:6 non-reinforced conc. on 50mm sandblinding.
Fdn wall of 150x200x400mm hollow cement block bedded with 1:4 mortar mix jointed
10mm apart, reinforced with brickforce wire every second course.
Fdn walls (plinth) of 1200mm height from footing to underneath of slab.
1:4 cement mortar plaster to external skirting and painted bituminous black as a finishing.
CROSS SECTION X-X

SEMIDETACHED URBAN HOUSE PLAN OF EITHER SSB OR


CEMENT BLOCKS
BATHROOM VERANDA VERANDA BATHROOM
WC WC
BEDROOM 2 BEDROOM 2
· House is of 259m² Area
KITCHEN KITCHEN
· 3 bedrooms

CORRIDOR

CORRIDOR
No. DESCRIPTION BY DATE
· Lounge and Kitchen MASTER BEDROOM MASTER BEDROOM
· Kitchen with pantry REVISIONS
· Shared full bathroom N
LOUNGE LOUNGE

· A common toilet NW NE

BEDROOM 1 BEDROOM 1
MALAWI GOVERNMENT
MINISTRY OF LANDS

IBR design hip roof of pitch set at 15° W E PRIVATE BAG 311

· SW SE VERANDA VERANDA
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

· Minimum housing surrounding area to be of


PROJECT TITLE
S
PROPOSED URBAN AND RURAL HOUSE DESIGNS

40x30meters plot = 1,200m² CLIENT

SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
PRIVATE BAG 311
LILONGWE 3
MALAWI

DRAWING NAME

PROTOTYPE 5- 3 BEDROOMS, KITCHEN & LOUNGE

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/05-01


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND


EFFICIENT PERFORMANCE OF HIS/HER WORK.

900 900

670
1000
1500

1500

1500

2000

2000
600
1500

1330
1000
2000 1500 1000
500

500
W1 W2 W3 W4 W5 D1 D2
No. REQUIRED: 2 No. REQUIRED: 6 No. REQUIRED: 2 No. REQUIRED: 6 No. REQUIRED: 4 No. REQUIRED: 4 No. REQUIRED: 14

LOCATION: Lounge LOCATION: Bedroom 1, 2, and 3 LOCATION: Kitchen LOCATION: Bedroom 1, 2, and 3 LOCATION: Bathroom & WC LOCATION: Lounge and LOCATION: Master bedroom,
FRAMES: Purpose made FRAMES: Purpose made FRAMES: Purpose made Kitchen Bedroom 1 & 2, WC
FRAMES: Purpose made steel frames steel frames dim as FRAMES: Purpose made steel frames steel frames dim as steel framesdim Kitchen, bathroom
dimensions as shown shown dimensions as shown shown as shown FRAMES: Purpose FRAMES: Pressed steel
GLASS: 4mm clear GLASS: 4mm clear GLASS: 4mm clear GLASS: 4mm clear GLASS: 6mm obscure made treated door frames
IRONMONGERY: Standard brass handles and IRONMONGERY: Standard brass IRONMONGERY: Standard brass handles and IRONMONGERY: Standard brass glass H/W frames DOORS: Semi solid core
stays handles and stays stays handles and stays IRONMONGERY: Standard brass DOORS: Purpose interior quality flush
FINISH: Frames painted 3coats FINISH: Frames painted FINISH: Frames painted 3coats FINISH: Frames painted handles & stays made treated door
gloss enamel in approved 3coats gloss enamel gloss enamel in approved 3coats gloss enamel FINISH: Frames painted H/W doors FINISH: 1 coat pink primer,
color in approved color color in approved color 3coats gloss FINISH: Varnished 1 coat undercoat, &
CILLS: Internal Conc. window cill CILLS: Internal Conc. CILLS: Internal Conc. window cill CILLS: Internal Conc. enamel in 2coates with 2 coats gloss enamel
covered with 150x50mm window cill covered with 150x50mm window cill approved color clear glass in approved color
thick HW/glulam bluegum covered with thick HW/glulam bluegum covered with CILLS: Internal Conc. vanish frame finished 2coats
stool with 2coats 150x50mm thick stool with 2coats 150x50mm thick window cill. IRONMONGERY: ISEO polyurethane varnish
polyurethane vanish, Apron HW/glulam bluegum polyurethane vanish, Apron HW/glulam bluegum swing dead
and trim with laminated stool with 2coats and trim with laminated stool with 2coats lock with IRONMONGERY: 2 Lever"UNION"
bluegum. polyurethane vanish bluegum. polyurethane vanish roller catch, Mortise Locks 1pair
Apron and trim with Apron and trim with type HA5027 125mm narrow butt
laminated bluegum. laminated bluegum. & Kafli lever hinges fixed with9

23550
490
x
730 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 730
100

No. DESCRIPTION BY DATE


900
900

REVISIONS
900
1050

MALAWI GOVERNMENT
900

MINISTRY OF LANDS
PRIVATE BAG 311
LILONGWE 3.
900 355 355 900

Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]
100 100

PROJECT TITLE

PROPOSED URBAN AND RURAL HOUSE DESIGNS

CLIENT
900
100

SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
PRIVATE BAG 311
950

LILONGWE 3
MALAWI

DRAWING NAME
900

PROTOTYPE 5- 3 BEDROOMS, KITCHEN & LOUNGE


900
250

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50
650
100

1815 4230 11460 4230 1815


x PROJECT ARCHITECT
W. KACHIKOPA
PROJECT NUMBER

DRAWING NUMBER HFHM/MWD/2023/05-02


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND


EFFICIENT PERFORMANCE OF HIS/HER WORK.

ROOF

28 gauge galvanised pre-painted IBR sheets, ROOF


ROOF
Gable roof coverage set at 15° pitch with
104 500mm overhang, resting on 2x3" (75mm) s/w 28 gauge galvanised pre-painted IBR sheets,
28 gauge galvanised pre-painted IBR sheets, Mono-pitch
Mono-pitch roof coverage set at 5° pitch with
440 purlins set at 932mm c/c, Nailed to 2x6" roof coverage set at 5° pitch with 500mm overhang,
500mm overhang, resting on 2x3" (75mm) s/w
932 (150mm) s/w rafters treated with solignum resting on 2x3" (75mm) s/w purlins set at 932mm c/c,
purlins set at 903mm c/c, Nailed to 2x6"
932 4374 Nailed to 2x6" (150mm) s/w rafters treated with solignum
104 2 932 4668
(150mm) s/w rafters treated with solignum
93 100 3112 100
2x6" S/W rafters
452 100

250
2x3" S/W purlins 903 903 301 903 903
903 903
724

903 402
300 250

150

500
150

250
500
500

673
1025
2x3" S/W purlins
3932

2x3" S/W purlins

850
2x6" S/W rafters

250
1444
2x6" S/W rafters
4407

150x150mm
Y12xR6 reinforced
1200
3275 1200

1:2:4 concrete lintel

800

2956
2637
50

50x800mm open vent

1800

1800
M20grade, 75mm
900

1300
thick Non-reinforced

1500
850

concrete slab M20grade, 50mm


M20grade, 100mm
75

thick Non-reinforced
M20grade, 50mm M20grade, 50mm thick Y16 reinforced
75

concrete slab
20

200
plastic self-closing

50
thick Non-reinforced thick Non-reinforced concrete slab

100
245 concrete slab/ pavers concrete slab latrine chamber

50

20

100
M20grade, 50mm
Outward foul

50
300
400

thick Non-reinforced
280

75
basin drainage
100

concrete slab/ pavers


100mm thick
1200

50
100
700
hardcore Pit excavation of

150
100mm thick 1200x1800x3200mm giving a

100

100
125
hardcore waste volume of 6.70m³.
800

100mm thick 100mm thick 100mm thick


150

Selected earth fill Pit lining of 200x200x400mm


material /gravel hardcore hardcore hardcore
concrete hollow blocks filled
150

with weak mortar, plastered


Selected earth fill

1:3:6 mass concrete 450 900 450 1700 450 material /gravel
20mm thick 1:3 cement mortar
ratio, with a cement skim finish.

450 3200 450 3200 450 1:3:6 mass concrete


footing of 450x 150mm
FOUNDATION
latrine chamber is without
perforations as will function as a

3100
footing of 450x 150mm bio-degrading septic tank,

2852
vacuumed after filled up.
FOUNDATION 1:3:6 non-reinforced conc. on 50mm optional sandblinding.
50mm thick
Sandblinding
Fdn wall of 150x200x400mm hollow cement block bedded with 1:4 mortar mix jointed Superstructure wall to be of
1:3:6 non-reinforced conc. on 50mm sandblinding. 10mm apart, reinforced with brickforce wire every second course. 150x200x400mm thick concrete
Fdn wall of 150x200x400mm hollow cement block bedded with 1:4 mortar mix jointed
10mm apart, reinforced with brickforce wire every second course.
Fdn walls (plinth) of 1200mm height from footing to underneath of slab.
CROSS SECTION X-X Fdn walls (plinth) of 700mm height from footing to underneath of slab.
1:4 cement mortar plaster to external skirting and painted bituminous black as a finishing.
hollow blocks.

both walls to be reinforced with


brickforce mesh wire every
Earth

1:4 cement mortar plaster to external skirting and painted bituminous black as a finishing.
CROSS SECTION Y-Y 200
20
second course. 20
200

200
200 1660 200

No. DESCRIPTION BY DATE


2500 1:3:6 mass concrete
footing of 2500x 200mm

CROSS SECTION Z-Z REVISIONS

MALAWI GOVERNMENT
MINISTRY OF LANDS
PRIVATE BAG 311
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

PROJECT TITLE

PROPOSED URBAN AND RURAL HOUSE DESIGNS

CLIENT

SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
PRIVATE BAG 311
LILONGWE 3
MALAWI
DRAWING NAME
PROTOTYPE 7- 2 BEDROOMS, KITCHEN & LOUNGE

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/07-03


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND


EFFICIENT PERFORMANCE OF HIS/HER WORK.

MORDENISED RURAL SSB / CEMENT BLOCK HOUSE PLAN

· House is of 139.80m² Area


· 3 bedrooms with single 6 glass window each
· Lounge with 2No. 6glass windows
· Corridor with a kitchen back exit door
· 1 Front and back Veranda
· A courtyard and latrine plus bathroom annex.
· IBR design gable roof with rafters for framing. Roof pitch
set at 20°
· Minimum housing surrounding area to be of
15x30meters plot = 450m²

1200 1500
100 100 100
100
100
100 100 100
100 115 100
230250 250 200 200230

EASTERN ELEVATION

230
100 100 100 100 100
100 100
100

2000
WC SHWR WC SHWR
N

230
EASTERN ELEVATION D3 D3 W
NW NE

E
D3 D3
900 565 900
SW SE

380 300

4000
COURTYARD COURTYARD
4315
300 230
2815 1200 1200 1915

230
230
W1 W1

70
D1 D1

900
2230

2000
VERANDA KITCHEN VERANDA KITCHEN

17065
1030

230
230

900
No. BY DATE
1093
DESCRIPTION
D2 D2
X
WESTERN ELEVATION

CORRIDOR

CORRIDOR
3000
1200
BEDROOM 2 W1 BEDROOM 2 W1 REVISIONS
3385

1200

W1 BEDROOM 3 W1 BEDROOM 3
10605

D2 D2

900
115
1093
230

900
D2 D2 MALAWI GOVERNMENT
MINISTRY OF LANDS
PRIVATE BAG 311
1400

LILONGWE 3.

3000
1200
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

BEDROOM 1 W1 BEDROOM 1 W1
PROJECT TITLE

LOUNGE LOUNGE PROPOSED URBAN AND RURAL HOUSE DESIGNS


4000

1200

900
W1 W1

230
CLIENT

D1 D1

370 900
1400

300 1200
SECRETARY FOR LANDS,HOUSING AND URBAN
VERANDA VERANDA

1800
DEVELOPMENT

230
230

PRIVATE BAG 311

300
LILONGWE 3
MALAWI
W1 300 W1 DRAWING NAME
3000 1200 2815 PROTOTYPE 6- 3 BEDROOMS, KITCHEN & LOUNGE

230 115 115 230 300


3000
2158 1200 957 3415
0 230 DRAWN DATE SCALE

4315 W. KACHIKOPA JUNE,2023 1/50

8190 PROJECT ARCHITECT


W. KACHIKOPA
PROJECT NUMBER

DRAWING NUMBER HFHM/MWD/2023/06-01


NOTES

100
938 1200 1200 938 1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE

560
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

900
THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND
EFFICIENT PERFORMANCE OF HIS/HER WORK.
ROOF

3460
8890 5°

900
28 gauge galvanised pre-painted IBR sheets, Gable roof
70 coverage set at 20° pitch with 500mm overhang, resting

900
766 on 2x2" (50mm) s/w purlins set at 958mm c/c, nailed to

100
2x6" rafters spaced at 1200mm c/c, treated with solignum.
958
958 473 4275
0
958
106 58
9 2x2" S/W purlins
2x6" S/W rafters
250

8890
831

649
200

200
5247

853
1000

SOUTHERN ELEVATION

1200
50

2100

1200
M20grade, 75mm
1050

thick Non-reinforced
concrete slab
75

75
100

1200
20

600
480

100mm thick
970

hardcore

230230230
370
230

1200
Selected earth fill

11305
material /gravel

20°

20°
1:3:6 mass concrete
690 2482 690 625 690 2482 690 footing of 450x 150mm

1200
FOUNDATION

1:3:6 non-reinforced concrete.


Fdn wall of 200x200x400mm hollow cement block bedded with 1:4 mortar mix jointed
10mm apart, reinforced with brickforce wire every second course.

1200
Fdn walls (plinth) of 1200mm height from footing to underneath of slab.
1:4 cement mortar plaster to external skirting and painted bituminous black as a finishing.

CROSS SECTION X-X

1200
1200
NORTHERN ELEVATION

853
900 900 900 900 645 645 900 900 900 900
100 200 100

1200 900 900 900


22 22 22 30 20 20 30 30 20 20 30 30 20 20 30
567 567 800 800 800

22 22 22 22

30

30

30
308 297 308

20

20

20
1000

2100

2100

2100
No. DESCRIPTION BY DATE

2050

2050

2050
1100
REVISIONS
EASTERN ELEVATION
Window 1 Door 1
No. REQUIRED: 2
Door 2
No. REQUIRED: 3
Door 3
No. REQUIRED: 2
MALAWI GOVERNMENT
No. REQUIRED: 6 MINISTRY OF LANDS
PRIVATE BAG 311
LILONGWE 3.
LOCATION: BEDROOMS LOCATION: LOUNGE & CORRIDOR LOCATION: BEDROOM 1 , 2, & 3 LOCATION: LATRINE & SHOWER
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]
FRAMES: Purpose made steel
6glass window with FRAMES: Purpose made pressed FRAMES: Purpose made pressed FRAMES: Purpose made pressed PROJECT TITLE
Dimensions as shown steel frames 1mm thick steel frames steel frames 1mm thick
GLASS: 4mm clear glass set DOORS: Purpose made treated DOORS: Core flash door DOORS: Purpose made treated PROPOSED URBAN AND RURAL HOUSE DESIGNS
with silicone and H/W door FLB H/W door
finished with putty FINISH: Varnished 2coates with FINISH: Painted pink primer and FINISH: Varnished 2coates with
IRONMONGERY: Standard brass stoppers clear glass vanish finihsed with mist grey clear glass vanish
handles and stays IRONMONGERY: SABS 3-lever mortice IRONMONGERY: SABS 3-lever mortice lock IRONMONGERY: SABS 3-lever mortice CLIENT
FINISH: Industrial prefabricated lock lock
IRONMONGERY SECRETARY FOR LANDS,HOUSING AND URBAN
finish (red oxide). then DEVELOPMENT
painted gloss white IRONMONGERY HINGES: As per supplied by supplier IRONMONGERY PRIVATE BAG 311
HINGES: As per supplied by HINGES: As per supplied by LILONGWE 3
supplier supplier MALAWI
DRAWING NAME
PROTOTYPE 6- 3 BEDROOMS, KITCHEN & LOUNGE

DRAWN DATE SCALE

WESTERN ELEVATION W. KACHIKOPA

PROJECT ARCHITECT
JUNE,2023

PROJECT NUMBER
1/50

W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/06-02


NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE

1000 900 900 MATERIALS ARE ORDERED OR WORK PUT IN HAND.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND


EFFICIENT PERFORMANCE OF HIS/HER WORK.
1980

2100

2100
3250 1500 1200 2250
150 150 400
150 150 150 150 150 225150 450 150 150 400 150
50050 50 50 50 50 50 50 50 50 1100
150 75 150 150 150

3 Z

150
50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

150
150 150 150 150 150 150 150 150 150 150 150 150 150 150
G1 D1 D2

550 50 50 50 50 50400

900
150
No. REQUIRED: 1 No. REQUIRED: 6 No. REQUIRED: 2

150

1800
150
LOCATION: Courtyard LOCATION: Lounge, Shwr, LOCATION: Bedrooms 1& 2
Corridor, WC, FRAMES: Purpose made

150
FRAMES: Purpose made Kitchen, & Latrine steel frames
LATRINE

900
30x50x3mm square DOORS: Semi-core flash

150
-tube steel frame FRAMES: Purpose made doors
DOORS: Purpose made steel frames FINISH: MDF finish door
30x30x3mm square DOORS: Purpose IRONMONGERY: Union
-tube grill door made treated SABS 3Lever
D1

150 150
FINISH: painted 2coats with
steel primer and FINISH:
H/W doors
Varnished HINGES:
mortice locks
As per supplied
1200 900

1150

1150
paint of choice 2coats with
150
IRONMONGERY: Security grill clear glass vanish
Y

150
door lock as available IRONMONGERY: ISEO swing
on market dead lock with roller
catch, type HA5027 &
HINGES: As per supplied Kafli lever handle (HA605Z)
Z

1200
HINGES: As per supplied

1500 1000 500

2000
150
SHOWER WC

150
1200

1200
1200

350
150
50 50 50 50 50 50 50

150
150
D1 D1

2000

150
150

1200
150
KITCHEN

400
3000

150
900

900

900
900

9300
D1

150
850 900 1500 900 350 900 300

1000
150
W1 W2 W3 150 250 150 150
No. REQUIRED: 2 No. REQUIRED: 2 No. REQUIRED: 2 1000 3250 1500 1200 Y
LOCATION: Lounge & Dining LOCATION: Bedroom 1 & 2 LOCATION: Bedrooms 1& 2
FRAMES: Purpose made FRAMES: Purpose made FRAMES: Purpose made
steel frames dim as steel frames dim as steel frames dim as

18850
shown shown shown G1
4500

4500
GLASS: 5mm clear GLASS: 5mm clear GLASS: 5mm clear
IRONMONGERY: Standard brass IRONMONGERY: Standard brass IRONMONGERY: Standard brass

FINISH:
handles and stays
Frames painted FINISH:
handles and stays
Frames painted FINISH:
handles and stays
Frames painted COURTYARD
3coats gloss enamel 3coats gloss enamel 3coats gloss enamel 3150 1200 4000
2 4
2500

in approved color in approved color in approved color


CILLS: Internal Conc. CILLS: Internal Conc. CILLS: Internal Conc.
150 150 150 150 150 150
window cill. window cill. window cill.
1325 500 1325 900 1250 1500 1250

300 X

150
150
14250

300 1500 300


300

W3 W1
1250

1250
D1
2450

CORRIDOR
3500

1000

1200
W2
LOUNGE & DINING No. DESCRIPTION BY DATE

5350
BEDROOM 2
1250

900
150

URBAN HOUSE PLAN DESIGN FOR PEOPLE LIVING REVISIONS


150

D2
WITH ALBINISM

2900
1500

3450 900 D2
· House is of 143.32m² Area 150 MALAWI GOVERNMENT

150
MINISTRY OF LANDS
3500

2 bedrooms
PRIVATE BAG 311
500

· D1
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

· Open floor plan - Lounge,Dining 300 1500


W3
W1
PROJECT TITLE
1500

PROPOSED URBAN AND RURAL HOUSE DESIGNS


· Courtyard with Kitchen, shower, WC, and Latrine 3850
VERANDA
300
150

· IBR design gable roof of pitch set at 15° BEDROOM 1 CLIENT

· Minimum housing surrounding area to be of 1750 1000 1750


150
900 725 1500 725 SECRETARY FOR LANDS,HOUSING AND URBAN
DEVELOPMENT
PRIVATE BAG 311
150 150 150 W2
30x15meters plot = 450m² 4500 4000 LILONGWE 3
MALAWI

8950 X 1
DRAWING NAME
PROTOTYPE 7- 2 BEDROOMS, KITCHEN & LOUNGE

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/07-01

900
NOTES
1 DO NOT SCALE OFF FROM THIS DRAWING. ALL CONTRACTORS MUST CHECK
ON SITE. ALL DIMENSIONS AND INFORMATION PROVIDED. ANY QUERIES OR
DISCREPANCIES MUST BE REFERRED TO THE PROJECT ARCHITECT BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN HAND.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE STRUCTURAL STABILITY AND


EFFICIENT PERFORMANCE OF HIS/HER WORK.

1000 1000 2500

2000
2 2

9300

2000

4 4
No. DESCRIPTION BY DATE

REVISIONS

MALAWI GOVERNMENT
MINISTRY OF LANDS
PRIVATE BAG 311
LILONGWE 3.
Tel. (+265) 01 774 766 Fax (+265) 01 772 523 E-mail [email protected]

PROJECT TITLE

PROPOSED URBAN AND RURAL HOUSE DESIGNS

CLIENT

SECRETARY FOR LANDS,HOUSING AND URBAN


DEVELOPMENT
PRIVATE BAG 311

1 1
LILONGWE 3
MALAWI
DRAWING NAME

3 3
PROTOTYPE 7- 2 BEDROOMS, KITCHEN & LOUNGE

DRAWN DATE SCALE


W. KACHIKOPA JUNE,2023 1/50

PROJECT ARCHITECT PROJECT NUMBER


W. KACHIKOPA

DRAWING NUMBER HFHM/MWD/2023/07-02

You might also like