Gantt Chart Template
Gantt Chart Template
[Company Name]
TEMPLATE ROWS
See the Help worksheet for information about using template rows.
1 [ Task Category (label only) ]
2 [ Task Category (summary) ] Fri 5/01/20 Fri 5/01/20 1 1
2.1 [ Level 2 Task ] Fri 5/01/20 Fri 5/01/20 1 0% 1
2.1.1 . [ Level 3 Task ] Fri 5/01/20 Fri 5/01/20 1 0% 1
2.1.1.1 . . [ Level 4 Task ] Fri 5/01/20 Fri 5/01/20 1 0% 1
Gantt Chart Template © 2012-2020 by Vertex42.com: Licensed for private use only. Do not publish on the internet.
W Th F Sa Su M T W Th F Sa Su M T W Th F Sa Su M T W Th F Sa Su M T W Th F Sa Su M T W Th F Sa Su M T W Th F
Week 8
15 Jun 2020
20 21
Sa Su
Help © 2012-2018 Vertex42 LLC
Introduction
This Gantt Chart spreadsheet makes creating a project schedule very easy. You only
need to know some basic spreadsheet operations to make this gantt chart work for you,
such as how to insert, delete, copy and paste entire rows.
Be sure to read the Getting Started Tips below.
The Share settings for this spreadsheet must always be set to "Private"
See the TermsOfUse worksheet for more information about how you may or may not
share this template.
- The WBS numbering uses a different formula for each level, but the formula does not
Changing theother
reference any WBScell
Level in the
in the row.WBS Column
So, you can copy and paste just the WBS cell that
you want to use.
- If you leave a blank cell above a WBS number, the numbering will reset to 1.x.x. The
formulas are meant for convenience, but you can manually enter them if you need to.
- You can indent the task description for sub-tasks by entering spaces (until Google
decides to add an indent option).
- You can use tasks that are just labels, but it can be even more useful for a category
task to display the minimum Start date and maximum End date of its sub tasks. This can
Category Tasks
be done using =MIN(range_of_startdates) and =MAX(range_of_enddates). An example
template row is provided, but you will need to update the MIN() and MAX() formulas.
D. Set the Start date to the next Calendar Day after another task's End date.
-- This formulapredecessors,
For multiple is very simple:the
=enddate+1
formula would be =MAX(enddate1,enddate2,enddate3 )
+1
E. Set theformula
- This Start date to like
is just a number
the oneof
in days before
C or D, orthat
except afterinanother
place of date.
the "1" you enter the
number of days, such as =WORKDAY(enddate,5) or =WORKDAY(startdate,-5)
FAQs
Q: What is the all
First, select best wayrows
of the to Print?
you want to print. Then, in the Print Settings, choose
A: "Selection" and check "No Gridlines". Fit to width and print in landscape.
You also may want to hide the Days Done, Days Left, and Color columns prior to printing.
Q: How
more do I printtothe
columns theentire range
right of of dates
the chart areafor
andmy project?
then copy and paste columns (7 at a
A: time) to extend the display.
Note: The more columns you add to the right of the Gantt chart, the slower the
recalculation speed will be, because of the number of additional formulas.
Q: How do I calculate
the formula below, the %Complete
where for aisSummary
"workdays" task?
a reference to the range of work days
A: and "complete" is a reference to the %complete for each of the subtasks.
=ARRAYFORMULA( SUMPRODUCT( workdays, complete ) / SUM ( workdays ) )
When using =MIN(), =MAX(), and =SUMPRODUCT(), it is easy for the references to get
Q: The Start
messed update,
if youEnd date,
move rowsoraround
%Complete fornew
or insert a Level
rows.1 You
taskshould
is wrong. How
verify anddo
fixIthese
fix it?
A: formulas if they are not referencing the correct ranges.
Q: I've
Findmessed upworks,
a row that the chart
thenarea
copysomehow. How
the cells that do Iup
make fixthe
it?gantt chart area from that
A: row into the cells that are messed up.
© 2012-2018 Vertex42 LLC
Contact Vertex42
to "Private"
Input Cell
Label
or to printing.
workdays ) )
Gantt Chart Template Pro for Google Sheets
originally for Microsoft Excel that offers more features than the free version. When you
purchase it, you will also get a link to download the Pro version for Google Sheets!!
- Visit the web page above to view screenshots and watch demo videos
Choose whether
- The Pro version to defineatask
includes durations
larger using Calendar
set of template rows that Days or more
provide Workoptions
Days orfor
End Dates
defining the Start date, End date, duration, and dependency of tasks.
Exclude holidays
- List holidays andfrom
otherwork days days in a separate sheet. When defining task
non-working
durations using Work Days, these dates will be excluded.
Define what
- The Pro you mean
version allowsby "Weekend"
you when which
to define exactly using day(s)
Work Days
of the week you want to
use as your weekend. The default is Saturday and Sunday.
This template is a copyrighted work under the Unites States and other copyright
laws and is the property of Vertex42 LLC. The items listed below are additional
You may make archival copies and customize this template only for your personal
use or use within your company or organization and not for resale or public sharing.
You may not remove or alter any logo, trademark, copyright, disclaimer,
brand, terms of use, attribution, or other proprietary notices or marks within
This template and any customized or modified version of this template may NOT be
sold, distributed, published to an online gallery, hosted on a website, or placed on a
The Share Settings for this spreadsheet must always be set to "Private"