0% found this document useful (0 votes)
26 views25 pages

Item Rate March 2023

The document provides itemized rates for various civil engineering works in Coimbatore for March 2023, compiled by Er. R. Saravanaraja. It includes detailed rates for excavation, concrete work, masonry, brickwork, plastering, and other construction activities, specifying the unit rates and remarks for each item. The rates are intended for use by civil engineers and contractors in the region.

Uploaded by

saran160916
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views25 pages

Item Rate March 2023

The document provides itemized rates for various civil engineering works in Coimbatore for March 2023, compiled by Er. R. Saravanaraja. It includes detailed rates for excavation, concrete work, masonry, brickwork, plastering, and other construction activities, specifying the unit rates and remarks for each item. The rates are intended for use by civil engineers and contractors in the region.

Uploaded by

saran160916
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

COIMBATORE CIVIL ENGINEERS ASSOCIATION

No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.


www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
EXCAVATION FOR FOUNDATION in all kinds of soil
including soft rock except hard rock, stacking
1
within the site including all labours, leads, lifts etc.
complete.
Earth work excavation in ordinary soil upto 6'0"
a 14.0 Cft Manual work
depth
Earth work excavation in ordinary soil below 6'0"
b 21.0 Cft Manual work
depth Up to 9'0" Depth
PLAIN CEMENT CONCRETE USING 1:4:8 MIX
(1cement, 4 M.Sand, 8 hard blue granite stone
2a metal 40mm and down gauge) for FOUNDATION 104.0 Cft
including all materials, labours, leads, lifts etc.
complete.
PLAIN CEMENT CONCRETE USING 1:5:10 MIX
(1cement, 5 M.Sand, 10 hard blue granite stone
2b metal 40mm and down gauge) for FOUNDATION 94.0 Cft
including all materials, labours, leads, lifts etc.
complete.
PLAIN CEMENT CONCRETE USING 1:5:10 MIX
(1cement, 5 M.Sand, 10 hard blue granite stone
3 metal 40mm and down gauge) for FLOORING 4.5" 50.5 Sft
Tk including all materials, labours, leads, lifts etc.
complete.
4 R.R. Masonry in cm 1:6 161.5 Cft
5 C.R. Masonry in cm 1:6 219.5 Cft
Supplying and FILLING IN COLUMN PITS &
BASEMENT USING EXCAVATED EARTH under
6a floors in layers including all material, labour, leads, 7.0 Cft
lifts, watering, consolidating, ramming etc.,
complete.
Supplying and FILLING IN COLUMN PITS &
BASEMENT USING IMPORTED EARTH under floors
6b with quarry gravel in layers including all material, 37.5 Cft
labour, leads, lifts, watering, consolidating,
ramming etc., complete.
Supplying and FILLING IN FOUNDATION with
quarry dust or M Sand not exceeding 4" depth and
6c 59.5 Cft
consolidated including all materials, labours, leads,
lifts etc. complete.

1 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Providing and injecting pre-construction ANTI
TERMITE TREATMENT with chlorpyrifos
emulsifiable 20 % EC mixed with water in 1:19
6d 10.0 Sft
ratio, spread at 5 lit/Sft on top of soil filling
including all materials, labours, leads, lifts, etc.,
complete.
REINFORCED CEMENT CONCRETE USING 1:1.5:3
MIX (1cement, 1.5 M.Sand, 3 hard blue granite Rate excluding shuttering &
7 150.0 Cft
stone metal 20mm and down gauge) including all Reinforcement
materials, labours, leads, lifts, etc. complete.

RCC WORKS INCLUDING SHUTTERING & LABOUR

REINFORCED CEMENT CONCRETE USING 1:1.5:3


MIX (1cement, 1.5 M.Sand, 3 hard blue granite
stone metal 20mm and down gauge) including all
8
materials, labours, leads, lifts, reinforcement bars,
barbending, shuttering, placing of concrete etc.
complete.
Steel - 0.95 Kg / Cft, M20 Grade
8a Column footing ( M20) 303.0 Cft RMC Concrete - Rs. 4300/- per
Cu.Mt
8b Columns (M20)
Ground Floor 1029.0 Cft Steel - 7.00 Kg / Cft
First Floor 1052.0 Cft
Second Floor 1075.0 Cft
Third Floor 1098.0 Cft
8c Grade beam (M20) 664.5 Cft Steel - 3.50 Kg / Cft, RMC
8d Sill beam 60mm thick - Rft(M20) 58.5 Rft Steel - 3.20 Kg / Cft

2 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
8e Lintel - 125mm thick - Rft
Ground Floor 267.7 Rft Steel - 3.80 Kg / Cft
First Floor 276.0 Rft
Second Floor 284.5 Rft
Third Floor 293.0 Rft
8f Loft 50 mm thick average
Ground Floor 163.7 Sft Steel - 3.25 Kg / Cft
First Floor 172.0 Sft
Second Floor 180.5 Sft
Third Floor 189.0 Sft
8g Sunshade 63mm thick average - 1 sft
Ground Floor 185.2 Cft Steel - 3.25 Kg / Cft
First Floor 193.5 Cft
Second Floor 202.0 Cft
Third Floor 210.5 Cft
8h Roof beams
Ground Floor 828.0 Cft Steel - 4.90 Kg / Cft, RMC
First Floor 849.0 Cft
Second Floor 870.0 Cft
Third Floor 891.0 Cft
8i Roofslab - (slab 4.5" / 6" tk)
Ground Floor 544.3 Cft Steel - 2.45 Kg / Cft, RMC
First Floor 562.0 Cft
Second Floor 579.5 Cft
Third Floor 597.0 Cft
Supply & laying CEMENT CONCRETE USING 1:3:6
MIX (1cement, 3 sand, 6 hard blue granite chiping
8j
6 to 12 mm gauge) for SUNKEN SLAB including all
materials, labours, leads, lifts, etc. complete.
Ground Floor 103.7 Cft
First Floor 111.0 Cft
Second Floor 118.0 Cft
Third Floor 125.0 Cft

3 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Supply & laying AURALITE Light weight material
1:3 (1 bag cement, 3 bags Auralite) for SUNKEN
8h
SLAB including all materials, labours, leads, lifts,
etc. complete.
Ground Floor 334.0 Cft
First Floor 341.0 Cft
Second Floor 348.0 Cft
Third Floor 355.0 Cft
Supply, Fabricating and Erection of steel
9
reinforcement for RCC items of work
Ground Floor 115.5 Kg
First Floor 118.0 Kg
Second Floor 120.5 Kg
Third Floor 123.0 Kg
BRICKWORK with locally available best quality
machine moulded RED BRICKS of not less than 50
kg/sq.cm crushing strength in cement mortar 1:6
10a
(1cement, 6 sand) in SUPERSTRUCTURE including
all materials, labours, leads, lifts, scaffolding etc.
complete.
Ground Floor 295.0 Cft
First Floor 300.5 Cft
Second Floor 306.0 Cft
Third Floor 311.5 Cft
HALF BRICKWORK with locally available best
quality machine moulded RED BRICKS of not less
than 50kg/sq.cm crushing strength in CM 1:4 (1
10b cement 4 sand) and reinforcement with M.S. hoop
iron plate at every fourth course embedded in
cement mortar 1:4 FOR PARTITIONS including all
materials, labours, leads, lifts, etc., complete.
Ground Floor 139.0 Sft
First Floor 142.0 Sft
Second Floor 145.0 Sft
Third Floor 148.0 Sft

4 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
BRICKWORK with locally available best quality
machine moulded FLY ASH BRICKS of not less than
50 kg/sq.cm crushing strength in cement mortar
10c
1:6 (1cement, 6 sand) in SUPERSTRUCTURE
including all materials, labours, leads, lifts,
scaffolding etc. complete.
Ground Floor 213.0 Cft
First Floor 218.5 Cft
Second Floor 224.0 Cft
Third Floor 229.5 Cft
HALF BRICKWORK with locally available best
quality machine moulded FLY ASH BRICKS of not
less than 50kg/sq.cm crushing strength in CM 1:4
10d (1 cement 4 sand) and reinforcement with M.S.
hoop iron plate at every fourth course embedded
in cement mortar 1:4 FOR PARTITIONS including
all materials, labours, leads, lifts, etc., complete.
Ground Floor 104.0 Sft
First Floor 107.0 Sft
Second Floor 110.0 Sft
Third Floor 113.0 Sft
LIGHT WEIGHT BLOCK partition wall 100 mm thick
in CM 1:4 (1 cement 4 sand) and reinforcement
with M.S. hoop iron plate at every fourth course
10e
embedded in cement mortar 1:4 FOR PARTITIONS
including all materials, labours, leads, lifts, etc.,
complete.
Ground Floor 92.0 Sft
First Floor 94.5 Sft
Second Floor 97.0 Sft
Third Floor 99.5 Sft

5 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
LIGHT WEIGHT BLOCK work 9" thick in CM 1:6 (1
cement 6 sand) mix FOR SUPERSTRUCTURE
10f
WORK including all materials, labours, leads, lifts,
scaffolding etc. complete. (16" x 8" x 8")
Ground Floor 217.0 Cft
First Floor 220.5 Cft
Second Floor 224.0 Cft
Third Floor 227.5 Cft
SOLID BLOCK work 6" thick in CM 1:6 mix for super
structure works including all materials, labours,
10g
leads, lifts, scaffolding etc. complete 12" x 6"x 8"
BLOCKS
Ground Floor 130.0 Cft
First Floor 133.0 Cft
Second Floor 136.0 Cft
Third Floor 139.0 Cft
SOLID BLOCK work 4" thick in CM 1:6 mix for
PARTITIONS including all materials, labours, leads,
10h
lifts, scaffolding etc. complete 12"
x 4"x 8" BLOCKS
Ground Floor 116.5 Cft
First Floor 119.5 Cft
Second Floor 122.5 Cft
Third Floor 125.5 Cft
BRICKWORK with FIRST CLASS BRICKS in cement
mortar 1:5 (1cement, 5 sand) in SUPERSTRUCTURE
10i
including all materials, labours, leads, lifts,
scaffolding, Pointing, cleaning etc. complete.
Ground Floor 553.0 Cft
First Floor 562.5 Cft
Second Floor 572.0 Cft
Third Floor 581.5 Cft

6 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
PLASTERING with CM 1:6 (1cement, 6 sand), 12
mm minimum thick to all INTERIOR face of walls
11a & RCC surfaces (sponge finish) including all
materials, labours, leads, lifts, scaffolding, etc.
complete.
Ground Floor 38.5 Sft
First Floor 41.0 Sft
Second Floor 43.5 Sft
Third Floor 46.0 Sft
PLASTERING with CM 1:6 (1cement, 6 sand), 12
mm minimum thick to all EXTERIOR face of walls
11b & RCC surfaces (sponge finish) including all
materials, labours, leads, lifts, scaffolding, etc.
complete.
Ground Floor 48.5 Sft
First Floor 51.5 Sft
Second Floor 54.5 Sft
Third Floor 57.5 Sft
PLASTERING with CM 1:3 (1cement, 3 sand), 12
mm minimum thick to CEILING, sides and soffit of
11c beams and columns (sponge finish) including all
materials, labours, leads, lifts, scaffolding, etc.
complete.
Ground Floor 42.5 Sft
First Floor 45.0 Sft
Second Floor 47.5 Sft
Third Floor 50.0 Sft

7 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
JOINERY WORK
Supplying & fixing door frame & shutters with
KERALA TEAK WOOD of size (6" x 4") as per detail
WOOD
including MS hold fast or anchor fastners, brass
12a 3750.0 Sft SIZE - Rs. 3600/-
hinges, hardwares and suitable locking
PLANK - Rs. 4600/-
arrangements including all materials, labours,
POLISHING, complete.
Supplying & fixing KERALA TEAK WOOD door
frame of size (4" x 3") as per detail & door shutter
with OST SHEET over factory made flush Shutter WOOD
12b including MS hold fast or anchor fastners, Brass 1625.0 Sft SIZE - Rs. 3600/-
hinges, hardwares and suitable locking PLANK - Rs. 4600/-
arrangements including all materials, labours,
POLISHING, complete.
Supplying & fixing KERALA TEAK WOOD door
frame of size (4" x 3") as per detail & door shutter
WOOD
with factory made flush Shutter including MS hold
12c 1150.0 Sft SIZE - Rs. 3600/-
fast or anchor fastners, Brass hinges, hardwares
PLANK - Rs. 4600/-
and suitable locking arrangements including all
materials, labours, PAINTING, complete.

Supplying and fixing KERALA TEAK WOOD (4" x 3")


fully glazed window / ventilator shutters to details
with 4mm thick pin headed float glass panels
including MS hold fast or anchor fastners, WOOD
12d Aluminium powder coated hinges, hardwares and 1900.0 Sft SIZE - Rs. 3600/-
suitable locking arrangementswith all materials, PLANK - Rs. 4600/-
labours, PAINTING, including cost of guard bars
using 12 mm square polished rods, fixing, painting,
etc.,

8 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Supplying and fixing KERALA TEAK WOOD (4" x 3")
fully glazed window / ventilator shutters to details
with 4mm thick pin headed float glass panels
including MS hold fast or anchor fastners, WOOD
12e Aluminium powder coated hinges, hardwares and 2310.0 Sft SIZE - Rs. 3600/-
suitable locking arrangements with all materials, PLANK - Rs. 4600/-
labours, POLISHING, including cost of guard bars
using 12 mm square polished rods, fixing, painting,
etc.,

Suppying and fixing factory made UPVC white


colour casement/casement cum fixed glazed
windows comprising of uPVC multi-chambered
frame, sash and mullion (where ever required)
extruded profiles duly reinforced with 1.60 ± 0.2
12f mm thick galvanized mild steel section, uPVC 1000.0 Sft
extruded glazing beads, EPDM G.I fasteners 100 x
8 mm size for fixing frame to finished wall, plastic
packers, plastic caps and necessary stainless steel
screws etc. including cost of guard bars using 12
mm square polished rods, fixing, painting, etc.,

TILES WORK
Supplying and laying VITRIFIED / CERAMIC TILE of
approved colour & finish in FLOORING over a bed
of cement mortar 1:6 of minimum thickness 20mm
13 pasted with cement slurry, tile joints filled with
matching pigments including all materials,
labours, leads, lifts complete. (Basic Rate of Tile
Rs.80/sft)
Ground Floor 143.5 Sft
First Floor 146.5 Sft
Second Floor 149.5 Sft
Third Floor 152.5 Sft

9 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Supplying and laying VITRIFIED / CERAMIC TILE
matching floor tile or BLACK GRANITE of size
600mm X 100mm X 8mm in SKIRTING in CM 1:4
14 with 4mm projection from wall surface and joints
finished neatly with matching pigments including
all materials, labours, leads, lifts complete. (Basic
Rate of Tile Rs.80/sft)
Ground Floor 66.0 Rft
First Floor 68.5 Rft
Second Floor 71.0 Rft
Third Floor 73.5 Rft
Supplying and laying VITRIFIED / CERAMIC TILE of
approved colour & finish in TOILET FLOORING over
a bed of cement mortar 1:6 of minimum thickness
15 20mm pasted with cement slurry, finished with
3mm spacer joints & filled with epoxy grout of
approved colour including all materials, labours,
leads, lifts complete. (Basic Rate of Tile Rs.60/sft)
Ground Floor 148.0 Sft
First Floor 151.5 Sft
Second Floor 155.0 Sft
Third Floor 158.5 Sft
Supplying and laying GLAZED TILES IN DADO of
size 24" X 12" of approved colour set with cement
slurry over base plastering in CM 1:5 so as to form
16
a true even surface and joints finished neatly with
matching pigments including all materials, labours,
leads, lifts complete. (Basic rate of Tile Rs.60/sft)
Ground Floor 121.5 Sft
First Floor 125.0 Sft
Second Floor 128.5 Sft
Third Floor 132.0 Sft

10 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Supplying and laying KOTA STONE of size 600mm X
600mm X 18mm of approved colour & finish in
FLOORING over a bed of cement mortar 1:6 of
minimum thickness 20mm pasted with cement
17
slurry, tile joints filled with matching pigments
including all materials, labours, leads, lifts,
polishing, complete. (Basic Rate of stone
Rs.100/sft)
Ground Floor 253.0 Sft
First Floor 264.0 Sft
Second Floor 275.0 Sft
Third Floor 286.0 Sft
Supplying and laying KOTA STONE SKIRTING
matching floor tile of size 600mm X 100mm X
18mm in SKIRTING in CM 1:4 with 4mm projection
18 from wall surface and joints finished neatly with
matching pigments including all materials, labours,
leads, lifts complete. (Basic Rate of stone
Rs.100/sft)
Ground Floor 120.5 Rft
First Floor 127.5 Rft
Second Floor 134.5 Rft
Third Floor 141.5 Rft
Supplying and laying 18mm thick machine cut and
polished KOTA STONE of approved shade in treads
and risers of STEPS & LANDING in CM 1:6 of
minimum thickness 20mm jointed with cement
19
slurry and pointing with matching pigments
including edge chamfering / nosing, polishing,
forming grooves for grip all complete. (Basic cost
Rs 100/Sft)
Ground Floor 284.5 Sft
First Floor 290.0 Sft
Second Floor 295.5 Sft
Third Floor 301.0 Sft

11 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Supplying and laying 18mm thick machine cut and
polished GRANITE stone of approved shade in
treads and risers of STEPS & LANDING in CM 1:6 of
minimum thickness 20mm jointed with cement
20
slurry and pointing with matching pigments
including edge chamfering / nosing, polishing,
forming grooves for grip all complete. (Basic cost
Rs 100/Sft)
Ground Floor 255.0 Sft
First Floor 260.0 Sft
Second Floor 265.0 Sft
Third Floor 270.0 Sft
Supply & fixing 18mm thick GRANITE slab of
approved shade FOR COUNTER top in CM 1:6 of
minimum thickness 20mm jointed with cement
21
slurry and pointing with matching pigments
including edge chamfering / nosing, polishing etc.,
all complete. (Basic cost Rs 160/Sft)
Ground Floor 311.0 Sft
First Floor 316.0 Sft
Second Floor 321.0 Sft
Third Floor 326.0 Sft
Supplying and laying PARKING GRADE TILES of size
600 mm X 600mm X 8mm of approved colour &
finish in PARKING FLOORING over a bed of cement
22 mortar 1:6 of minimum thickness 20mm pasted
with cement slurry, tile joints filled with matching
pigments including all materials, labours, leads,
lifts complete. (Basic Rate of Tile Rs.60/sft)
Ground Floor 140.0 Sft

12 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Supplying and fixing 1st Class Cement Jalli Paver
23
for flooring over c.m.1:4, 20mm thick - 1 Sft
Ground Floor 126.5 Sft
Supply & fixing 18mm thick MARBLE slab of
approved shade FOR FLOORING in CM 1:6 of
minimum thickness 20mm jointed with cement
24
slurry and pointing with matching pigments
including edge chamfering / nosing, polishing etc.,
all complete. (Basic cost Rs 100/Sft)
Ground Floor 344.5 Sft
First Floor 355.0 Sft
Second Floor 365.5 Sft
Third Floor 376.0 Sft
Supply & fixing 18mm thick QUARTZ slab of
approved shade FOR FLOORING in CM 1:6 of
minimum thickness 20mm jointed with cement
25
slurry and pointing with matching pigments
including edge chamfering / nosing, polishing etc.,
all complete. (Basic cost Rs 240/Sft)
Ground Floor 514.5 Sft
First Floor 524.0 Sft
Second Floor 533.5 Sft
Third Floor 543.0 Sft
Supplying and laying ELEVATION TILE DADOOING
of size 24" X 12" of approved colour set with
cement slurry over base plastering in CM 1:5 so as
26 to form a true even surface and joints finished
neatly with matching pigments including all
Materials, labours, leads, lifts complete. (Basic
rate of Tile Rs.150/sft)
At all levels 266.0 Sft

13 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
ELLIS PATTERN FLOORING 2" THK USING 1:3:6
MIX (1cement, 3 M.Sand, 6 hard blue granite
27
stone metal 12 mm and down gauge) including all
materials, labours, leads, lifts, etc. complete.
Ground Floor 58.5 Sft
First Floor 62.0 Sft
Second Floor 65.5 Sft
Third Floor 69.0 Sft
ELLIS PATTERN FLOORING 3" THK USING 1:3:6
MIX (1cement, 3 M.Sand, 6 hard blue granite
28 stone metal 12 mm and down gauge) including all
materials, labours, leads, lifts, etc. complete.
(POWER TROWEL FINISH)
Ground Floor 71.0 Sft
First Floor 73.5 Sft
Second Floor 76.0 Sft
Third Floor 78.5 Sft
Weathering course in brick jelly lime concrete
using broken brick jelly of size 20mm uniform
gauge in pure slaked lime to the proportion of
brick jelly to lime being 32:12.5 by volume and laid
29 over the RCC roof slab in a single layer of required
slope and finished by beating the concrete with
wooden beaters of approved pattern, keeping the
surface constantly wet by sprinkling lime jaggery
water, etc., complete
Ground Floor 115.0 Sft
First Floor 118.5 Sft
Second Floor 122.0 Sft
Third Floor 125.5 Sft
Supply and fixing of HYDRAULIC PRESSED CLAY
TILES of size 9" x 9" for roof top laid over a bed of
cement mortar 1:5 of minimum thickness 20mm
30 pasted with cement slurry, finished with 10mm
spacer joints & filled with cement mortar 1:3
including all materials, labours, leads, lifts,
complete. (Basic Rate of Tile Rs.14/No)
Ground Floor 70.0 Sft
14 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
First Floor 73.0 Sft
Second Floor 76.0 Sft
Third Floor 79.0 Sft
Supply and fixing of COOL ROOF TILES of size 12" x
12" for roof top laid over a bed of cement mortar
1:5 of minimum thickness 20mm pasted with
31 cement slurry, finished with 5mm spacer joints &
filled with cement mortar 1:3 including all
materials, labours, leads, lifts, scaffolding
complete. (Basic Rate of Tile Rs.60/Sft)
Ground Floor 126.0 Sft
First Floor 129.0 Sft
Second Floor 132.0 Sft
Third Floor 135.0 Sft

15 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
PAINTING WORKS
Preparing surfaces and applying 1 coat of white
cement, 2 Coats of Cement based PUTTY, 1 coat
of primer to all INTERIOR FACES of walls and
32
ceiling of slabs, sides and soffit of beams etc.,
including all materials, labours, leads, lifts,
scaffolding complete.
At all levels 18.5 Sft
Preparing surfaces and white washing 1 coat with
kottayam white cement, & 1 coat of PRIMER to
33 all EXTERIOR FACES of walls, sunshades, facias,
fins, drops etc., including all materials, labours,
leads, lifts, scaffolding complete.
At all levels 8.0 Sft
Preparing surfaces and polishing with sealer coat
including applying two coats of MELAMINE mat /
34
glossy finish including all materials, labours
complete.
At all levels 171.0 Sft
Providing and Applying Synthetic Enamel Paint two
coats for WOODEN DOOR FRAMES with
approved make and shade over priming coat as
35
per manufacturer's specification and at all levels
and including all lead and lift, scaffolding, staging,
etc. complete.
At all levels 30.0 Sft
Providing two coats of Synthetic Enamel Paint of
approved make & shade over one coat of zinc
primer for MS doors, windows, gates, railings, grills
36
& structural steel work at all levels to give a
uniform finish as approved including scaffolding,
staging, etc.
At all levels 28.5 Sft

16 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Providing and applying TWO coat of INTERIOR
EMULSION over sponge plastered surfaces on
interior surfaces of walls, underneath roof
projections etc., including preparing the surface
37 by cleaning the cement mortar, removing the
dust/dirt/oil/grease, sanding, filling up the dents,
cracks, undulations with crack filler of approved
make, erecting and dismantling of scaffolding,
curing etc., complete. (PREMIUM EMULSION)
At all levels 16.0 Sft

Providing and applying TWO coat of EXTERIOR


EMULSION over sponge plastered surfaces on
exterior surfaces of walls, underneath roof
projections etc., including preparing the surface
38 by cleaning the cement mortar, removing the
dust/dirt/oil/grease, sanding, filling up the dents,
cracks, undulations with crack filler of approved
make, erecting and dismantling of scaffolding,
curing etc., complete. (APEX EMULSION)

At all levels 20.0 Sft


Construction of RCC UG SUMP of 10000 Litrs
* Earthwork Excavation
* Flooring PCC in 1:4:8 - 6" Thk
* Floor Mat RCC - 6" Thk
* Tank side Brickwork - 4.5" BW in Flyash Brick
39 * Tank side - 4.5" Thk RCC wall in 1:1.5:3 mix 18.0 Lit
* Waterproofing in Brushbond for Walls & Floors -
2 Coats
* Smooth Plastering in CM 1: 3 mix
* Tank Cover slab 4.5" Thk RCC in 1:1.5:3 mix
* FRP Manhole 24" x 24"

17 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES FOR MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

per
S No: NAME OF WORK Rate Remarks / Basic Cost Considered
Unit
Construction of FLYASH BRICK UG SUMP of 10000
Litrs
* Earthwork Excavation
* Flooring PCC in 1:4:8 - 6" Thk
40 * Floor Mat RCC - 6" Thk 16.0 Lit
* Tank side Brickwork - 9" BW in Flyash Brick
* Smooth Plastering in CM 1: 3 mix
* Tank Cover slab 4.5" Thk RCC in 1:1.5:3 mix
* FRP Manhole 24" x 24"

18 of 19
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

BASIC RATES OF CONSTRUCTION MATERIALS CONSIDERED - MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

Sno Materials Rate Per REMARKS


1 Cement - PPC Rs. 375.00 /bag
2 Cement - PSC Rs. 375.00 /bag
3 River sand Rs. 130.00 /cft
4 Reinforcement steel Rs. 78.50 /Kg
5 Binding wire Rs. 90.00 /Kg
6 RED Bricks Rs. 14.00 /Each
7 Fly Ash Bricks Rs. 8.50 /No
8 First Class Bricks (Mangalore) Rs. 26.00 /No
9 4" Light Weight Block AAC Rs. 63.00 /No
10 9" Light Weight Block AAC Rs. 125.00 /No
11 Size stone Rs. 30.00 /Nos
12 Bond stone Rs. 30.00 /Nos
13 Soling stone Rs. 30.00 /cft
14 Quarry dust Rs. 20.00 /cft
15 Well Gravel Rs. 23.00 /cft
16 Chloropyrifos 20 EC Rs. 300.00 /Litr
17 M Sand Rs. 35.00 /cft
18 P.Sand Rs. 45.00 /cft
19 40 mm metal Rs. 25.00 /cft
20 20 mm metal Rs. 25.00 /cft
21 6mm to 12 mm Chips Rs. 25.00 /cft
22 Light weight filler material (AURALITE) Rs. 270.00 /bags
23 Hoop iron bands Rs. 90.00 /Kg
24 Brick bat Rs. 230.00 /cft
25 Lime Rs. 150.00 /cft
26 Vitrified tiles Rs. 80.00 /Sft
27 Ceramic tiles Rs. 60.00 /Sft
28 Glazed tiles Rs. 60.00 /Sft
29 Parking Tiles Rs. 60.00 /Sft
30 Granite for Steps Rs. 100.00 /Sft
31 Granite for Kitchen Rs. 160.00 /Sft
32 Granite for Shelfs Rs. 150.00 /Sft
33 Cement Jali Paver Rs. 50.00 /Sft
34 Marble Slab Rs. 100.00 /Sft
35 Quartz Slab Rs. 240.00 /Sft
36 Elevation Tile Rs. 150.00 /Sft
37 KOTA Stone Rs. 100.00 /Sft
38 Cuddapah slab Rs. 60.00 /Sft
39 8" Solid block (12" x 8" x 8") Rs. 36.00 /Each

1 of 2
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

BASIC RATES OF CONSTRUCTION MATERIALS CONSIDERED - MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

Sno Materials Rate Per REMARKS


40 8" Solid block (16" x 8" x 8") Rs. 45.00 /Each
41 4" Solid Block (16" x 4" x 8") Rs. 36.00 /Each
42 6" Solid Block (16" x 6" x 8") Rs. 44.00 /Each
43 9" Solid Block (12" x 9" x 8") Rs. 55.00 /Each
44 Hydraulic Pressed Tile 9" x 9" Rs. 14.00 /Each
45 Cool Roof Tiles Rs. 60.00 /Sft
46 EPOXY Grout Rs. 1000.00 /Kg
47 Tile Joint Pigment Rs. 80.00 /Kg
48 Burma Teak - Size Rs. 5500.00 /cft
49 Burma Teak - Plank Rs. 6500.00 /cft
50 Paduak wood - Size Rs. 3600.00 /cft
51 Paduak wood - Plank Rs. 4600.00 /cft
52 Fibre door(2'6"x7'0") Rs. 4500 /Each
53 UPVC window - Openable Rs. 550 /Sft
54 UPVC window - Sliding without bug mesh Rs. 420 /Sft
55 Aluminium window Rs. 260 /Sft
56 Steel window Rs. 275 /Sft
57 Window MS Grill RS. 140 /Kg
58 White Cement - JK Wall care Rs. 25.00 /Kg
59 Wall Putty -Birla Rs. 24 /Kg
60 Interior Primer Rs. 130 /Litr
61 Exterior Primer Rs. 132.5 /Litr
62 INTERIOR EMULSION
a Tractor Rs. 170 /Litr
b Premium Rs. 450 /Litr
c Royale Rs. 600 /Litr
63 EXTERIOR EMULSION
a ACE Rs. 190 /Litr
b APEX Rs. 475 /Litr
c ULTIMA Rs. 600 /Litr
64 Wood Primer Rs. 190 /Litr
65 Melamine wood polish Rs. 310 /Litr
66 Wood putty Rs. 70 /Kg
67 Synthetic Enamel Paint Rs. 170 /Litr
68 Zinchromate / Red oxide primer Rs. 100 /Litr
69 NC Thinner Rs. 150 /Litr
70 Thinner Rs. 80 /Litr
71 White Cement Rs. 21.25 /Kg

2 of 2
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES CONSIDERED FOR LABOUR - MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.
S.No Description of work Unit Rate

1 Earth work excavation:


a. Earth work excavation In ordinary soil upto 6'0" depth 1 Cft 12.00
Earth work:
Earth work excavation In ordinary soil below 6'0" depth Up to 9'0"
b. 1 Cft 18.00
Depth
2 Plain cement concrete:
Plain cement concrete using 40mm aggregate for foundation work
a. 1 Sft 15.00
including foundation trench surface cleaning upto 6" thick
Plain cement Plain cement concrete using 12mm aggregate (Ellis pattern type) for
b. 1 Sft 15.00
concrete: flooring work 2" thick (Excluding cost of power trowel)
Plain cement concrete using 40mm aggregate for flooring work 4.5"
C 1 Sft 15.00
thick
Earth or Gravel filling with consolidation & surface leveling
3 Filling Work: 1 Cft 6.00
(Consolidation in layers)
4 Stone Work:
a. R.R.Masonry for foundation work 1 Cft 30.00
Stone Work:
b. C.R.Masonry for basement work 1 Cft 35.00
5 Reinforced cement concrete works:
a. R.C.C for footing (including marking) 1 Cft 65.00
Reinforced cement concrete works:

R.C.C for columns with shuttering & barbending (Including casting


b. 1 Cft 200.00
starter)

c. R.C.C for Plinth (Grade) beams with shuttering & barbending 1 Cft 170.00

d. R.C.C for roof beams with shuttering & barbending 1 Cft 180.00
e. R.C.C for sill concrete 1 Rft 26.00
f. R.C.C for lintel with shuttering & barbending upto 6" thick. 1 Rft 70.00
g. R.C.C for loft & sunshades with shuttering & barbending 1 Sft 70.00
R.C.C for side wall,sump,lift well & septic tank (including shuttering
h. 1 Sft 75.00
& barbending) upto 6" thick (single side shuttering)
R.C.C for side wall,sump,lift well & septic tank (including shuttering
i. 1 Sft 125.00
& barbending) upto 6" thick (double side shuttering)
R.C.C for one way roof slab upto 4.5" thick (including shuttering &
Reinforced cement

j. 1 Sft 75.00
concrete works:

barbending)
R.C.C for two way roof slab upto 5" thick (including shuttering &
k. 1 Sft 80.00
barbending)
R.C.C for pitched roof slab upto 5" thick (including shuttering &
l. 1 Sft 120.00
barbending) - A - TYPE
R.C.C for pitched roof slab upto 5" thick (including shuttering &
m. 1 Sft 150.00
barbending) - 4 SIDES
j. Fabrication labour Steel Reinforcement Fabrication labour 1 KG 20.00

1 of 2
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

ITEMWISE RATES CONSIDERED FOR LABOUR - MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.
S.No Description of work Unit Rate
6 Brick Work:
Brick work in super structure for 9" walls (including marking and
a. 1 Cft 44.00
brick soaking )
Brick work in super structure for 4-1/2" walls (including marking,
b. 1 Sft 26.00
Brick Work: brick soaking and placing hoop iron at every 4th layer)
Brick on edge in super structure (including marking and brick
c. 1 Rft 50.00
soaking )
d. Brick work for steps 1 Rft 65.00
9" / 8" Light weight block work 1 Sft 25.00
4" / 6" Light weight block work 1 Sft 20.00
7 Plastering Work:
a. Fixing joineries, window grills, safety doors, gates, etc. 1 Sft 40.00
b. Ceiling plastering (Including scaffolding and hacking) 1 Sft 20.00
c. Inner wall plastering (Including scaffolding) 1 Sft 18.00
d. Plastering Work: Outer wall plastering (Including scaffolding) 1 Sft 25.00
e. Pitched roof plastering (Including scaffolding) 1 Sft 50.00
f. Column & Beam plastering (Including scaffolding) 1 Sft 40.00
g. R.C.C Wall surface plastering (Including scaffolding) 1 Sft 20.00
Inner wall & Floor plastering with cement slurry (Including
h. 1 Sft 25.00
scaffolding)
8 Other works:
Surkhi laying for weathering course with lime and brick bats mixture
a. 1 Sft 27.50
including brick jelly breaking, bull marking & lime concreting.
b. Flooring with cement mortar over surkhi 1 Sft 20.00
c. Flooring with HP tiles over surki and binding in cement mortar 1 Sft 25.00
d. Brick on edge for sunshades with plastering 1 Rft 75.00
Chicken wire mesh finishing with plastering (including reinforcement
e. 1 Sft 45.00
Other works: work and chickenmesh )
f. Rainwater drip moulds / cut off borders in cement mortar 1 Rft 35.00
g. Curve border in cement mortar 1 Rft 50.00
h. Plastering for Steps including tread & raiser 1 Sft 50.00
i. Skirting packing in cement mortar 1 Rft 15.00
j. Chamber construction with bricks and plastering 1' x 1' 1 No 2000.00
k. Stage centering 1 Sft 40.00
l. External scaffolding work 1 Sft 10.00

2 of 2
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

BASIC LABOURS RATES FOR SHUTTERING & BARBENDING - MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

Sno WORK Rate Per REMARKS


COLUMN WORK (Barbending only)
1 Column Mat Rs. 15.00 /Sft
2 Column 9" x 9" Rs. 50.00 /Rft
3 Column 9" x 12" Rs. 60.00 /Rft
4 Column 9" x 15" Rs. 70.00 /Rft
5 Column 9" x 18" Rs. 80.00 /Rft
6 Column 9" x 21" Rs. 100.00 /Rft
7 Column 9" x 24" Rs. 110.00 /Rft
8 Column 12" x 12" Rs. 80.00 /Rft
9 Column 12" x 15" Rs. 90.00 /Rft
10 Column 12" x 18" Rs. 110.00 /Rft
PLINTH BEAM (Barbending & Shuttering with material)
11 Plinth Beam 9" x 9" Rs. 90.00 /Rft
12 Plinth Beam 9" x 12" Rs. 100.00 /Rft
13 Plinth Beam 9" x 15" Rs. 120.00 /Rft
14 Plinth Beam 9" x 18" Rs. 135.00 /Rft
15 Plinth Beam 9" x 21" Rs. 145.00 /Rft
16 Plinth Beam 9" x 24" Rs. 160.00 /Rft
17 Plinth Beam 12" x 12" Rs. 165.00 /Rft
18 Plinth Beam 12" x 15" Rs. 140.00 /Rft
19 Plinth Beam 12" x 18" Rs. 160.00 /Rft
ROOF BEAM (Barbending & Shuttering with material)
20 Roof Beam 9" x 9" Rs. 90.00 /Rft
21 Roof Beam 9" x 12" Rs. 100.00 /Rft
22 Roof Beam 9" x 15" Rs. 110.00 /Rft
23 Roof Beam 9" x 18" Rs. 130.00 /Rft
24 Roof Beam 9" x 21" Rs. 150.00 /Rft
25 Roof Beam 9" x 24" Rs. 165.00 /Rft
26 Roof Beam 12" x 12" Rs. 120.00 /Rft
27 Roof Beam 12" x 15" Rs. 140.00 /Rft
28 Roof Beam 12" x 18" Rs. 160.00 /Rft
ROOF SLAB (Barbending & Shuttering with material)
29 One Way Slab (Span & MS Props) Rs. 60.00 /Sft
30 Two Way Slab (Span & MS Props) Rs. 65.00 /Sft
31 One Way Slab (Wooden Shuttering) Rs. 50.00 /Sft
32 Two Way Slab (Wooden Shuttering) Rs. 55.00 /Sft

1 of 2
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

BASIC LABOURS RATES FOR SHUTTERING & BARBENDING - MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.

Sno WORK Rate Per REMARKS


ROOF SLAB (Barbending & Shuttering without material)
33 One Way Slab (Span & MS Props) Rs. 33.00 /Sft
34 Two Way Slab (Span & MS Props) Rs. 38.00 /Sft
35 One Way Slab (Wooden Shuttering) Rs. 30.00 /Sft
36 Two Way Slab (Wooden Shuttering) Rs. 35.00 /Sft
LINTEL WORK (Barbending & Shuttering with material)
33 9" & 4.5" lintel Rs. 48.00 /Rft
34 Sunshade / Loft Rs. 48.00 /Sft

NOTE: All above mentioned rates are for GROUND FLOOR work only.

2 of 2
COIMBATORE CIVIL ENGINEERS ASSOCIATION
No: 43, Kannusamy Road, R.S Puram, Coimbatore - 641 002.
www.cocena.in

BASIC LABOURS RATES FOR TILING WORK - MARCH 2023.


Compiled by: Er. R.Saravanaraja - Charter Secretary & Past President.
S.NO DESCRIPTION OF WORK UNIT G.F F.F S.F REMARKS
1 FLOORING TILE:
a 2'0" x 2'0" & 3'0" x 3'0" SFT 20 22 24
b 4'0" x 2'0" & 4'0" x 3'0" SFT 22 25 27
c 4'0" x 4'0" & above SFT 25 27 29
2 TOILET (or) KITCHEN
Wall tile (upto 2'0" x 1'0" ) with & without spacer 7'0"
a SFT 20 22 24
level
Wall tile (above 2'0" x 1'0" ) with & without spacer 7'0"
b SFT 20 22 24
level
Wall tile (upto 2'0" x 1'0" ) with & without spacer 10'0"
c SFT 23 26 27.5
level
Wall tile (above 2'0" x 1'0" ) with & without spacer 10'
d SFT 23 26 27.5
level
e Floor tile with & without spacer for any size SFT 23 25 27
f Half nossing RFT 35 35 35
g Full nossing RFT 65 65 65
h Chamfering RFT 15 15 15
i Soap granite (per piece) NOS 175 175 175
Wash basin wall tile and counter top granite upto 3'0" x
j NOS 1700 1700 1700
2'0" size
Wash basin wall tile and counter top granite above 3'0"
k NOS 2500 2500 2500
x 2'0" size
l Skirting (Ready Made) RFT 15 15 15
m Skirting (Tile or Granite Cutting) RFT 20 20 20
n Platform granite SFT 85 85 85
o Platform jambs granite SFT 80 80 80
p Ventilator / Kitchen window granite RFT 70 70 70
q Door bit granite RFT 80 80 80
r Sink fixing (per piece) NOS 500 500 500
s Gas holes (per piece) NOS 90 90 90
t Spacer area filling SFT 5 5 5
3 STAIRCASE
a Tread / Riser Rft 60 60 60
b Landing Rft 60 60 60
c Groove NOS 12 12 12
4 MISCELLANEOUS
a Mosaic repolish SFT 20 20 20
b Roof tile SFT --- 25 28
5 LABOUR WORK
a Mason NOS 1400
b Helper NOS 950
1 of 1