Baseline Processing Report1
Baseline Processing Report1
Comment 1:
Comment 2:
Comment 3:
Processing Summary
Observation From To Solution Type H. Prec. V. Prec. Geodetic Ellipsoid ΔHeight
(Meter) (Meter) Az. Dist. (Meter)
(Meter)
BM 1 --- BM 2 (B4) BM 1 BM 2 Fixed 0.002 0.002 40°20'55" 43.739 0.621
Acceptance Summary
Processed Passed Flag Fail
2 2 0 0
1
BM 1 - BM 2 (8:10:29 am-11:41:12 am) (S1)
Baseline observation: BM 1 --- BM 2 (B4)
RMS: 0.011 m
To: BM 2
Vector
Standard Errors
Vector errors:
2
Aposteriori Covariance Matrix (Meter²)
X Y Z
X 0.0000003892
Y -0.0000002596 0.0000013280
Occupations
From To
Point ID: BM 1 BM 2
3
Tracking Summary
4
5
Residuals
6
7
8
9
10
11
12
13
14
15
Processing style
Elevation mask: 10°00'00.0"
Continuous vectors: No
Force float: No
16
Acceptance Criteria
RMS: 0.008 m
To: BM 3
Vector
17
Standard Errors
Vector errors:
X 0.0000001146
Y 0.0000000195 0.0000006127
Occupations
From To
Point ID: BM 1 BM 3
18
Tracking Summary
19
20
Residuals
21
22
23
24
25
26
27
28
29
30
31
32
33
Processing style
Elevation mask: 10°00'00.0"
Continuous vectors: No
Force float: No
Acceptance Criteria
34