TOR for Cold Store
TOR for Cold Store
Terms of Reference(TOR)
For
Preparation of Detail
Design Drawing and Estimate of Cold Store
Background
Sundarharaicha Municipality in the fiscal year 2081/82 in its annual planning and budgeting has
proposed the construction of Cold Store. In line with the proposed plan, Sundarharaicha
Municipality seeks to outsource the consulting services for preparation of design drawing and
estimate of Cold Store. In order to outsource the competent Consulting firm this Terms of
Reference (ToR) has been prepared for the preparation of design drawing and estimate of Cold
Store project of Sundarharaicha Municipality.
Objectives
The objectives of the assignment are to prepare the Master Plan with DPR, Drawings, Cost
Estimate & Report for cold store. However, following objective fulfill the proposed study:
To carry out detailed topographic survey and map of the areas (in appropriate scale).
To prepare master plan with all physical infrastructures required in the building Area.
To carry out the Geotechnical Investigation (Soil test by digging 3 boreholes).
To carry out the structural design of the Building.
To carry out the Sanitary design required for the Building.
To carry out the Electrical design (Lighting, Telecommunication and data networking, Security
To design the infrastructure depicting the local architecture and using local construction
technology and materials. Drawings of infrastructures should include Plan, Section,
Elevation and Perspective view in color format along with soft copies.
Environment Consideration should start early-on Layout plan of the building should be guided by
environmental and climatic factors, and alternative layouts will be compared on environmental
and climatic ground. The design of the building should incorporate environmental concepts
such as avoiding/ minimizing adverse environmental impacts, recycling or reusing and proper
handling of wastes. Makings optimal use of natural systems (such as solar energy and natural lights),
health and safety as well as accident/ emergency management measures. Contributing, to positive
environment aspects (such as recharging ground water) etc. The proposed layout and designs should
be screened for any environmental risks. The consultant shall carry out environment assessment to
predict damages of the buildings construction to the environment and attempt first to avoid and then
to minimize the risks or damage through appropriate layout and design features. The unavoidable
risks should be mitigated through appropriate mitigation measures (technology, type of structures,
management etc.). The consultant will suggest appropriate measures in the design for protection of
surrounding environment.
The consultants shall produce details and all structural drawing as per Municipality Norms. Rule and
Regulation and preparation of all documents need for approval.
The consultants shall produce detailed quantity estimate of the building and its accessories. The
consultants shall collect information on sources of materials and their lead distances and prepare rate
schedules and cost estimates based on the standard norms and prevailing district rates.
3.4 Preparation of the Document
The Consultants shall prepare detailed design and drawings for:
Architectural
Structural
Electrical and Allied System Drawings should include Structural I Working Drawings. Deliverable
shall include,
Detailed Design Drawings.
Drawings for approval of Municipality
Detailed Unit Rate Analysis, Cost Estimate, work Specifications.
Complete set of Bidding Documents.
1. Plan (1:100/50/25)
a. Ground floor plan with all the necessary details.
b. Detail drawing showing the all-necessary details.
c. Schedule of finishes and specification for different areas and surfaces.
5. Doors/Windows (1:20/1:10/1:5)
a. Details elevations clearly showing all traditional features and elements to be incorporated and
prepared.
b. Details section explaining the opening, frame, threshold, shutter sizes etc. to be prepared, along
with a drawn description of the traditional detailing aspects and materials to be used.
c. Details for grills and security bars together with the material used, specifications fixing details.
d. Schedules and specification for hardware.
e. Details plans sectional elevations clearly explaining the location of carious fixtures
ie. Sinks and drain boards exhaust, fans, etc. along with all materials
specifications and catalogue references applicable.
4. Personnel Requirements:
The consultant should provide and manage a work team comprising of the following professionals to
accomplish the proposed assignment. The required number of manpower and man-month should be in
accordance with work schedule and manning schedule:
Item Gazetted Class Experience
Team Leader (Urban Planner) Second Class Equal 5 years Experience
Geotechnical Engineer Second Class Equal 5 years Experience
Architect Second Class Equal 3 years Experience
Structure Engineer Second Class Equal 3 years Experience
Civil Engineer Third Class Equal 3 years Experience
Electrical Engineer Third Class Equal 3 years Experience
Mechanical Engineer Third Class Equal 3 years Experience
Sanitary Engineer Third Class Equal 3 years Experience
The team should also consist of supporting technical and non-technical staffs.
5. Submission of Reports and presentation of the Works
5.1. Inception Report
This report will contain building size, type and layout plan. Preliminary inception report shall be
submitted to Municipality in two topics. This should contain master concepts of overall, project as well
as the time schedule.
5.2. Preliminary Design Report
This report shall contain the preliminary design concepts and short descriptions relating to the
proposed structure and its major components'. Architectural Structural, Electrical, Mechanical and
others. It shall include location of proposed if foundations and arrangements of the building
components along with comparison/ between the possible alternative types. This report shall be
submitted in two copies and the content shall be discussed with municipality before proceeding to the
detailed design of the building. The consultant shall present the preliminary design report to the
municipality audience. The cost of such presentation shall be borne by the consultants.
5.3. Draft Report
This draft report shall be in standard format, containing all the required components of the design and
be presented in clear and easy to refer formats as per the general design guidance attached.
The complete set of the report should consist of:
Volume I — Main Report
Volume II- Drawings (structural/working)
Volume III- Design Calculations
Volume IV- Unit Rate Analysis, Cost estimates, Bill of Quantity, and Special provisions to Standard
Specifications, if any.
Appendices
This report shall be submitted in Three copies. The report shall also include the drawings, quantity and
cost estimate of any standard design the is used in the design. A copy of this draft report shall also be
submitted to the Municipality for its review.
Apart from the bound report the consultants shall submit soft copies (Electronic Copies) of the final
report if USB as specified in the checklist.
6. Time Schedule
If not indicated otherwise in the contract documents the consultant shall complete the assigned
works as per the following schedule:
a. Inception report within 1 (One) weeks from the date of signing of the contract.
b. Preliminary Design Report within 2 (Week) from the date of signing of the contract.
c. Draft Report within 2 (Week) from the date of signing of the contract.
d. Final Report within 4 (Four) week from the date of signing of the contract.
7. Payment Schedule
If not indicated otherwise, the payment shall be made as mentioned below:
• 100% after preparation and approved of cost estimates, final BoQs and other contractual
documents.